The USPFO for NH awarded W50S8A26PA021 to Fleet Wave Construction, in the amount of $57,000 for B145 DCMA Office Space Renovation.
Active SAM.gov Solicitations for NAICS 236210
10 Open OpportunitiesThe general purpose of the contracts is to obtain craft labor and corrosion control services here at Kennedy Space Center. Craft labor and corrosion control includes, but is not limited to, all tasks and resources necessary to install, field fabricate and modify ground support equipment systems/subsystems to execute repairs and configuration change activities in support of Spaceport customer project. Met-Con has historically provided this service, as a subcontractor, most recently to Amentum under the Consolidated Operations, Management, Engineering and Test (COMET) contract, providing personnel who have specialized experience at KSC for over 20 years. They possess a knowledge that is critical to the execution of the Artemis mission that no other company can provide to a schedule that supports mission success. KSC's craft labor and corrosion control operations are reactive, requiring rapid adaptation as maintenance needs emerge during performance. Onboarding a new contractor would introduce schedule delays due to the learning curve and unfamiliarity with KSC-specific requirements. Met-Con is already established and integrated with the Kennedy Space Center team, making them the optimal choice for continuity. A one year, sole-source, award to Met-Con will maintain operational momentum while freeing Government resources to develop a competitive, long-term solution in support of the Administrator's direction. This requirement is critical to NASA’s Artemis campaign and its overall mission to safely land humans on the lunar surface. The Artemis campaign’s timeline, and its included mission dates, are a vital component of the government’s need. For reasons discussed below, delays to mission execution as a result of developmental challenges are likely to result in mission failure. These contracts are necessary to ensure that development of a lunar landing capability is complete in time to support NASA’s Artemis missions.
Award Announcement for PROJECT TITLE: T7A DEPOT MAINTENANCE COMPLEX (DMC) DB, PROJECT LOCATION: HILL AFB, UTAH
Solicitation FA664825C0007P00002 for REPAIR AIRCRAFT FIRE TRAINING FACILITY HOMESTEAD AIR RESERVE BASE (HARB) FL published by DEPT OF DEFENSE. Contractors must submit responses conforming to the requirements in the official SAM.gov solicitation notice and associated attachments.
Solicitation 36C77026C0004 for Leavenworth VA Decommissioning published by DEPT OF DEFENSE. Contractors must submit responses conforming to the requirements in the official SAM.gov solicitation notice and associated attachments.
Site Visit The National Institute of Standards and Technology (NIST) will conduct an optional site visit in connection with its Request for Information (RFI) for the Building 215 Cleanroom HEPA Filter Replacement requirement at the NIST Gaithersburg campus. The purpose of the visit is to help interested vendors understand the existing conditions and provide informed responses to the RFI. The visit is for market research only. Attendance is not required to respond to the RFI or to participate in any future solicitation. This site visit does not constitute a solicitation or a request for proposals or quotations. NIST will not award a contract or reimburse attendance or response costs on the basis of the RFI. RFI responses will be used for planning purposes and will be treated as information, not offers. The Government will host a site visit on Friday, October 9, 2026, at 9AM EST at the following location: National Institute of Standards and Technology 100 Bureau Drive, Building 215 Lobby Gaithersburg, MD 20899 Offerors interested in attending the site visit must submit their request for visitor badge via email to [email protected] and [email protected] by no later than Wednesday, October 7, 2026. Offerors shall use the email subject line: Site Visit – B215 HEPA Filter RFI All requests must include the following information: • Visitor’s full legal name. • Visitor’s country of citizenship. NIST Gaithersburg is a secure federal facility. On the date of the site visit, all Visitors to NIST Gaithersburg may access the site, through the Visitor Center from the main gate (Gate A) at W. Diamond Ave. and Bureau Drive. All visitors must be preregistered and present photo identification and vehicle registration information upon arrival. NIST can only accept a state-issued driver’s license or identification card for access to federal facilities if issued by states that are REAL ID compliant or have an extension. For more information about visiting the NIST Gaithersburg campus, please visit https://www.nist.gov/visit. REQUEST FOR INFORMATION (RFI) BUILDING 215 ADVANCED MEASUREMENT LABORATORY (AML) CLEANROOM REPAIR AND HEPA FILTER REPLACEMENT Solicitation/Reference No.: 1333ND26RNB190014 1. PURPOSE OF THIS REQUEST FOR INFORMATION The National Institute of Standards and Technology (NIST) is conducting market research pursuant to Federal Acquisition Regulation (FAR) Part 10 and FAR 15.201 to obtain industry feedback concerning the scope, schedule, phasing, cleanroom outage requirements, technical and performance risks, and estimated construction cost associated with the Building 215 Advanced Measurement Laboratory (AML) Cleanroom Repair and HEPA Filter Replacement project. NIST previously solicited this requirement under Solicitation No. 1333ND26RNB190014. NIST did not receive an acceptable offer under that solicitation. NIST is therefore reassessing the requirement and acquisition approach before determining whether and how to resolicit the project. NIST is particularly interested in identifying aspects of the requirement that may materially affect industry participation, constructability, schedule feasibility, pricing, risk, or the ability of contractors to submit competitive proposals. Industry is encouraged to provide candid feedback and to identify recommended changes that could improve constructability, competition, schedule feasibility, cost certainty, and overall project execution while continuing to meet NIST’s mission and cleanroom operational requirements. 2. RFI / MARKET RESEARCH NOTICE THIS RFI IS ISSUED SOLELY FOR INFORMATION AND ACQUISITION PLANNING PURPOSES. IT DOES NOT CONSTITUTE A REQUEST FOR PROPOSAL (RFP), INVITATION FOR BID (IFB), REQUEST FOR QUOTATION (RFQ), OR OTHER SOLICITATION. The Government does not intend to award a contract based on responses to this RFI. Responses will be treated as information only and shall not be construed as offers or proposals that can be accepted by the Government to form a binding contract. The Government will not reimburse respondents for costs incurred in preparing or submitting information in response to this RFI or for participating in any follow-up discussions. This RFI does not obligate the Government to issue a solicitation or award a contract, nor does it restrict the Government’s ultimate acquisition approach. Respondents are advised that information submitted in response to this RFI may be used by NIST in developing or revising the acquisition strategy, statement of work, specifications, schedule, phasing requirements, outage requirements, Government cost estimate, and future solicitation. Respondents should clearly identify and mark any proprietary, confidential, or commercially sensitive information contained in their responses. Respondents should avoid including proprietary information unless necessary to provide a meaningful response. 3. PROJECT BACKGROUND The project involves repair and modernization work within the Building 215 Advanced Measurement Laboratory cleanroom located at the NIST Gaithersburg Campus. The AML cleanroom encompasses approximately 1,800 square meters and includes approximately 750 square meters of Class 100 cleanroom space. The facility supports sensitive NIST research activities and contains specialized and, in some instances, irreplaceable scientific equipment. The project generally includes, but is not limited to: • Replacement of approximately 1,200 terminal supply HEPA filters; • Repair and/or modification of HEPA filter connections; • Testing, balancing, certification, and recertification of affected HEPA filters and cleanroom spaces; • Replacement of approximately 70 variable air volume (VAV) terminal units; • Replacement of approximately 54 airflow monitoring devices; • Installation of approximately 32 exhaust air control valves; • Modification and repair of associated ductwork; • Rebalancing of associated air-handling and exhaust systems; • Verification and repair, as required, of existing capped ductwork; • Controls-related work; • Cleaning, testing, balancing, commissioning, and cleanroom certification associated with each affected area; and • Protection of existing cleanroom spaces, research operations, and sensitive scientific equipment throughout construction. Detailed project drawings, specifications, and/or relevant portions of the previously issued solicitation may be attached to this RFI or otherwise made available through SAM.gov for purposes of industry review. 4. CURRENT PHASING AND OUTAGE CONCEPT NIST’s previous acquisition strategy was developed to minimize disruption to ongoing research operations by performing the work through phased cleanroom outages rather than shutting down the entire cleanroom for the duration of construction. The previous requirement contemplated 19 construction phases consisting of 18 Critical Cleanroom Outage Phases and one Non-Critical Phase. For each Critical Cleanroom Outage Phase, the contemplated outage period was approximately nine calendar days, generally structured as follows: • Outage/construction activities begin at approximately 7:00 p.m. on Friday; • Work proceeds continuously, including 24-hour-per-day/seven-day-per-week operations, as necessary; • Construction, startup, testing, balancing, cleaning, commissioning, and applicable cleanroom certification are completed during the outage period; and • The affected cleanroom area is required to achieve Ready for Re-Occupancy by approximately 7:00 a.m. on the second following Monday. Ready for Re-Occupancy generally means that required construction, startup, testing, balancing, cleaning, commissioning, and applicable cleanroom certification have been completed; the affected area is operationally capable of supporting its intended use without material restriction; and no deficiencies remain that materially impair safe occupancy or cleanroom operations. The previous requirement also contemplated maintaining unaffected cleanroom bays in operation to the maximum extent practicable and included the possibility of limited additional weekend outages affecting larger portions of the cleanroom. NIST recognizes that these operational constraints may significantly affect contractor staffing, sequencing, subcontractor availability, construction risk, pricing, and schedule feasibility. NIST is specifically seeking industry feedback concerning these requirements. 5. INFORMATION REQUESTED FROM INDUSTRY Respondents are requested to review the project information provided with this RFI and address the following topics. Respondents are not required to answer every question; however, detailed and candid responses are encouraged. A. Outage Feasibility and Constraint Identification • Critical Path Bottlenecks: Identify the specific trade activities that present the highest risk to achieving a 9-day bay outage window. • Realistic Outage Duration: Based on your experience in occupied nanofabrication facilities, what is a realistic, achievable calendar-day duration to complete a single cleanroom bay/module from shutdown to final recertification? • Risk & Impact Analysis: Explain how the current 24-hour, 9-day limit impacts project risk, labor density, safety, quality assurance, and total cost (including risk contingencies for $8,000/day liquidated damages). • Phasing & Mock-Up Alternatives: Would executing a "mock-up bay" or initial trial phase establish a viable baseline for subsequent production bays? B. Construction Cost Estimate Based on the information provided, what is industry’s rough-order-of-magnitude (ROM) estimated construction cost for the complete project? Respondents may provide either a specific estimated amount or a reasonable estimated range. • To the extent practicable, please identify the approximate portion of the ROM estimate attributable to: • Direct construction work; • HVAC/HEPA/VAV work; • Controls work; • Testing and balancing; • Commissioning and cleanroom certification; • Premium time, shift work, or 24/7 outage staffing; • General conditions; • Phasing and temporary protection; • Contingency/risk allowance; and • Other significant cost drivers. • Approximately what percentage or dollar amount of the estimated construction cost is attributable specifically to the current nine-day phased-outage approach? • If NIST modified the outage durations or phasing strategy, what approximate cost reduction or increase would industry anticipate? ROM estimates submitted in response to this RFI are requested solely for market research and acquisition planning. They will not constitute offers, proposals, bids, quotations, or binding commitments. C. Experience Working in an occupied Nano-Fab Cleanroom • The previous solicitation included Evaluation Factor #2 which required that the contractor have completed a minimum of two (2) HEPA Filter replacements in an occupied laboratory within the previous six years. Based on your experience in occupied nanofabrication facilities, is this a realistic and practical requirement? D. Competition and Industry Participation • Based on the project as currently structured, would your company consider submitting a proposal if NIST resolicits this requirement? Yes / No / Possibly Please explain the primary factors influencing your answer. • What aspects of the previous/current requirement would discourage your company or other qualified contractors from submitting a proposal? • Are the project’s size, bonding requirements, insurance requirements, cleanroom experience requirements, key personnel requirements, outage schedule, liquidated damages, fixed-price structure, or other contractual requirements likely to limit competition? • What changes, if any, would materially increase the likelihood that qualified contractors would compete for this project? • What type of contractor and subcontractor experience should NIST reasonably require without unnecessarily restricting competition? E. Additional Industry Feedback • Please identify any requirement, specification, schedule constraint, contract term, risk allocation, or other issue not addressed above that NIST should consider before resoliciting this project. • Please provide any additional recommendations that could improve competition, constructability, schedule reliability, cost certainty, or successful project execution. 6. RESPONDENT INFORMATION Respondents are requested to provide the following: • Company name; • Company address; • Name, title, telephone number, and email address of the point of contact; • Unique Entity ID (UEI), if available; • Business size and socioeconomic status under the anticipated NAICS code; • Relevant experience performing comparable cleanroom, laboratory, HVAC, HEPA filtration, controls, testing/balancing, or phased occupied-facility construction; • Whether the respondent would anticipate performing as a prime contractor or subcontractor; and • Whether the respondent would be interested in participating in a future industry day, one-on-one market research meeting, or site visit concerning this requirement. 7. RESPONSE INSTRUCTIONS Responses should be submitted electronically to [email protected] and [email protected] no later than October 14, 2026. The subject line should state: RFI Response – 1333ND26RNB190014 – Building 215 AML Cleanroom Project NIST recommends but does not require that responses be limited to approximately 10-pages, excluding supporting documentation. Respondents may provide responses in Microsoft Word or searchable PDF format. NIST may contact individual respondents for clarification or additional market research discussions. Participation in this RFI or any subsequent market research activity is voluntary and will not affect a firm’s ability to compete for any future solicitation. Respondents should clearly mark proprietary or confidential business information. NIST requests that respondents also provide, where practicable, a version of their response from which proprietary information has been redacted if the response contains significant proprietary material. 8. GOVERNMENT USE OF RESPONSES Information obtained through this RFI may be used by NIST to develop or revise the acquisition strategy, Government estimate, specifications, statement of work, construction phasing, outage durations, schedule, contract structure, solicitation terms, and other acquisition documents. NIST may summarize industry responses for internal Government planning purposes. NIST does not intend to publicly identify individual respondents’ proprietary business information or attribute proprietary recommendations to a particular respondent. The Government may incorporate concepts, recommendations, or approaches identified through market research into a future solicitation, provided such use is consistent with applicable law, regulation, and protection of proprietary information. 9. FAR 52.215-3 – REQUEST FOR INFORMATION OR SOLICITATION FOR PLANNING PURPOSES FAR 52.215-3, Request for Information or Solicitation for Planning Purposes, is incorporated into this notice. For purposes of paragraph (c) of FAR 52.215-3, this RFI is issued for the purpose of obtaining industry information concerning the feasibility, constructability, schedule, cleanroom outage requirements, risk allocation, acquisition approach, and estimated construction cost for the Building 215 AML Cleanroom Repair and HEPA Filter Replacement project to support NIST’s acquisition planning and potential resolicitation of the requirement. END OF REQUEST FOR INFORMATION
Introduction & Purpose The Department of the Air Force, through the 18th Contracting Squadron (18 CONS/PKC), is issuing this Sources Sought announcement to conduct market research. The primary objective is to identify qualified contractors with the specialized capabilities required for the construction of 10 Earth Covered Magazines (ECMs) at Okinawa, Japan. This notice is for planning and market research purposes only. It does not constitute a formal solicitation, Request for Proposal (RFP), or an invitation for bid, nor does it represent a commitment or obligation by the U.S. Government to award a contract. 2. Scope of Work & Project Requirements The intended outcome of this project is to deliver robust, blast-resistant storage infrastructure that satisfies stringent U.S. military safety and security standards for munitions and explosives handling. The scope of construction involves engineering and building ten (10) standard or specialized ECMs, which include: • Reinforced Concrete Structures: Engineering and pouring heavy-duty reinforced concrete floors, structural walls, and integrated roof slabs. • Blast-Mitigation Engineering: Installing reinforced steel blast doors and blast-resistant components designed to mitigate internal or external explosion risks. • Earth Cover Operations: Backfilling and grading a dense earth cover layer over the top and sides of the concrete shell to optimize safety and containment parameters. System Integrations: Installing specialized lightning protection systems (LPS), grounded electrical infrastructure, and robust perimeter/structural security components. 3. Requested Responses Interested contractors possessing the capabilities to perform this localized work in Okinawa should submit the attached questionnaire. Responses must be comprehensive and include the following information: • Company Profile: Official company name, physical address, point of contact details, DUNS number / Unique Entity ID (UEI), and active registration status on SAM.gov 4. Submission Instructions Please submit all Capability Statements, and questionnaire (attachment) electronically via email to the 18 CONS/PKC point of contact listed on the SAM.gov Notice. Additional POC Nick Apsens 18 CONS PKC 634-5843
October 7, 2026 The government is still working through RFI followup responses and the subsequent amendment. This amendment adjusts the proposal due date to 28 October, 2026, while the government finalizes documents. September 23, 2026 The government is sitll working through RFI followup responses and the subsequent amendment. This amendment adjusts the proposal due date to 13 October, 2026, while the government finalizes documents. September 16, 2026 Complete RFI responses posted. Followup questions related to these RFIs can be submitted by September 21 at noon CST. The government is not accepting new questions. Any question submitted must be tied to an answer provided in the attachment. The proposal due date will remain unchanged but the government will continue to monitor the need to extend. September 10, 2026 It was brought to the government's attention that previous solicitation amendments cannot be accessed. They now have been activated and are accessible. September 3, 2026 Amendment posted with updated Proposal due date, please see attachment. The government is still working to answer all RFIs. August 25, 2026: See attachment for a complete list of RFIs received to date. Some have already been answered, and the government is working to answer the rest. The government will continue to evaluate the need to extend the proposal deadline based on the time required to answer all questions and supply those answers to industry. August 19 2026: Please see amendment 0002 attached and an updated Section L. August 11 2026: 1. Please see amendment 0001 attached and an updated Section L dated 5 August 2026. 2. The government is accepting RFIs until 21 August at 3PM EDT. If you have already sent your RFIs to the POCs you do not have to resubmit them. 4 August 2026: Please see the attached RFP (FA8137-26-R-0040) and all attachments. --------------------------------------------------------------------------------------------------------------- THIS POSTING WILL SATISFY THE REQUIREMENT OF RFO 5.101, Presolicitation Multiple Award Construction Contract (MACC) for General Construction Services will accomplish a broad range of sustainment, maintenance, repair, alteration/renovation, and minor construction projects affecting real property facilities at Tinker Air Force Base, Oklahoma. The work performed will be complex in nature, require multiple construction trades, and may require engineering design performed by credentialed professionals. Project execution methods will fall into one of the following classifications. The execution method will be defined in the project documents for each Task Order (TO) under this Indefinite Delivery Indefinite Quanity (IDIQ) contract. Design Build will include the Contractor providing both the design and construction services for a project; during the Design-Build process, final design solutions are provided by the Contractor, not the Government. The Government will provide a Statement of Work (SOW), drawings, and other preliminary documents to establish requirements from the work to be completed. These documents will be equivalent to a schematic 15% or greater design. When awarded the TO for the project, the Contractor will complete the design to the 100% level to include drawings, specifications, design analysis/narrative, and other documentation as required by the Government. Construction with Limited Design method will include the Government providing the design and the Contractor will further develop portions as required and will provide construction services for the project. This method will be used for non-complex or repetitive work types of projects where design cost and effort is not warranted. The Government will provide the SOW, drawings, and other documents as necessary to establish requirements to complete the project. These documents will be equivalent to a design submittal 35% to 65%. When awarded the TO the Contractor will complete any additional design efforts required by the project and produce a set of working documents for use during construction. Construction only method will include the Government providing 100% design package, including the SOW, drawings, specification, and any other documents as necessary to establish requirements for the work to be accomplished. When awarded the TO the Contractor shall commence with construction in accordance with the design and contract requirements. The Contractor is required to furnish all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals necessary to provide a complete useable end product as specified in the TO/project documents. The North American Industry Classification System (NAICS) Code is 236210, Industrial Building Construction with a small business size standard of $45 million. The MACC will be executed for one base period of five (5) years with one option period of five (5) years. The Government will negotiate equitable adjustments resulting from change orders in the shortest practicable time. Approximately 120 days are required to definitize equitable adjustments associated with change orders for construction. The definitization of an equitable adjustment begins when the contracting officer receives an adequate change order definitization proposal and ends when the contracting officer executes a contractual action to definitize the change order. IMPORTANT NOTICE: Offerors are required to complete their registration in the System for Award Management (SAM) database via the website https://www.sam.gov. Offerors are strongly encouraged to review their informaiton in SAM to validate that it is current and up to date. Failure to do so could result in the offeror being ineligible for award of Department of War contracts IAW RFO 4.203-1 registered in SAM database. DISCLAIMER: The information being requested does not constitute a commitment on the part of the Government to award a contract, nor to pay for any costs incurred as a result of replying to this notice. This notice should not be construed as a commitment by the Government for any purpose.
On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.
On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1. On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.
How to Win Federal Contracts under NAICS 236210
Federal buyers evaluate offerors under NAICS 236210 through a combination of verified technical capability, past performance relevance, and price reasonableness. Follow this proven pursuit framework:
Check the solicitation Section L & M instructions and ensure SAM.gov registration is active.
Top Federal Buyers for NAICS 236210
Frequently Asked Questions About NAICS 236210
What is NAICS code 236210?
NAICS code 236210 is a standard North American Industry Classification System code used by federal contracting officers to categorize solicitations and establish small business size standards.
How do I bid on NAICS 236210 contracts?
To bid on NAICS 236210 opportunities, ensure your entity is registered on SAM.gov with NAICS 236210 listed in your assertions, and submit a compliant offer in response to the active solicitation.