Solicitation 140FS126Q0183 for 19--LODI FWO - 22' ALUMINUM CENTER CONSOLE BOAT published by INTERIOR, DEPARTMENT OF THE. Prospective offerors must consult official solicitation documents on SAM.gov for full instructions, specifications, and submission deadlines.
Active SAM.gov Solicitations for NAICS 336612
26 Open OpportunitiesThis Indefinite-Delivery / Indefinite-Quantity (IDIQ) contract was awarded in accordance with the Federal Acquisition Regulation (FAR) Part 12. This was a competitive acquisition and the USCG received two (2) quotes in responses to the RFQ. This is a single award IDIQ contract with firm fixed price delivery orders.
Solicitation 70LCHS26PPFB00047 for 30 FT Tournament Contender Boat published by DEPT OF DEFENSE. Contractors must submit responses conforming to the requirements in the official SAM.gov solicitation notice and associated attachments.
Solicitation 70LCHS26PPFB00039 for 30 FT Tournament Contender Boat published by DEPT OF DEFENSE. Contractors must submit responses conforming to the requirements in the official SAM.gov solicitation notice and associated attachments.
Solicitation 70LGLY26QGLB00051 for Training Vessels published by DEPT OF DEFENSE. Contractors must submit responses conforming to the requirements in the official SAM.gov solicitation notice and associated attachments.
Solicitation SPE7M427T0271 for 20--COVER,BOAT published by DEPT OF DEFENSE. Contractors must submit responses conforming to the requirements in the official SAM.gov solicitation notice and associated attachments.
Solicitation SPE7M026T7738 for 20--DOOR,METAL,MARINE S published by DEPT OF DEFENSE. Contractors must submit responses conforming to the requirements in the official SAM.gov solicitation notice and associated attachments.
Solicitation SPE7M427T1085 for 20--STUFFING BOX AND BEARING,RUDDER POST published by DEPT OF DEFENSE. Contractors must submit responses conforming to the requirements in the official SAM.gov solicitation notice and associated attachments.
The Justification and Approval (J&A) authorizes and approves an exception to fair opportunity; basis as shown in Attachment 1.
Solicitation SPE7M027T0916 for 20--DOOR,METAL,MARINE STRUCTURAL published by DEPT OF DEFENSE. Contractors must submit responses conforming to the requirements in the official SAM.gov solicitation notice and associated attachments.
Solicitation 140FS326Q0175 for 20--LA-SELA-REPLACEMENT OF AIRBOAT ENGINE published by DEPT OF DEFENSE. Contractors must submit responses conforming to the requirements in the official SAM.gov solicitation notice and associated attachments.
Proposed procurement for NSN 2010016277923 CABLE ASSY,REVERSE: Line 0001 Qty 5 UI EA Deliver To: W1A8 DLA DIST SAN JOAQUIN By: 0168 DAYS ADO Approved sources are 07309 R-3-15-51; 15342 R959359H. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.
This requirement is a sole source follow-on production contract to an Other Transaction Authority (OTA) in accordance with 10 U.S.C. 4022 (Authority of the Department of Defense to carry out certain prototype projects) DFARS 206.001-70 (Exception for prototype projects for follow-on production contracts). The incumbent from the OTA is SAAB Inc. (CAGE Code 1EG52). The agreement N666041890001/N666042493202 was competitively awarded through the Undersea Technology Innovation Consortium (UTIC) 23-01-003.This solicitation is to request a proposal from SAAB Inc. (CAGE Code 1EG52). to award a single award, Indefinite Delivery Indefinite Quantity (IDIQ) contract for MK 66 Mod 0 Heavyweight Undersea Training Targets (HUTT), engineering services for future upgrades and enhancements, and support equipment kits. The resultant contract will contain provisions for delivery and task orders to be awarded on a Firm Fixed price (FFP) basis. It is anticipated the single award IDIQ will have an ordering period from the date of contract through sixty (60) months after date of award.
CONTACT INFORMATION|4|N711.17|GXA|717-605-1318|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|invoice and receiving report (combo)|N/A|TBD|N00104|TBD|TBD|W25G1U|TBD|N/A|N/A|TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||| The purpose of this amendments is to: 1. Extend the solicitation expiration date to 30 NOV 2026. 2. Decrease the quantity from 6 EA to 1 EA. All other terms and conditions remain unchanged. \ The purpose of this amendment is to add FAR Overhaul 52.222-90. The solicitation clauses have been updated to reflect RFO changes. The offer due date is hereby extended to 27 MAY 2026. All other terms and conditions remain unchanged. The purpose of this amendment is to extend the solicitation due date from 14 JUL 2025 to 08 SEP 2025. All other terms and conditions remain unchanged. \ The purpose of this amendment is to increase from QTY 5 to QTY 6. Offer due date is also extended from 12 MAY 2025 to 14 JUL 2025. All other terms and conditions remain unchanged. \ A. Electronic submission of any quotes, representations, and any necessary certifications shall be accomplished via an email directed to [email protected]. B. General Requirements: MIL-STD Packaging, Government Source Inspection, FOB Source, CAV Reporting. C. This RFQ is for REPAIR. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. D. Only a firm-fixed (FFP), not-to-exceed (NTE) or estimated (EST) price for the REPAIR of the subject item(s) will be accepted. Quotes limited to test and evaluation (T&E) will NOT be accepted. The quoted price MUST be for the REPAIRof the item(s). E. Must adhere to IUID requirements of DFARS 252.211-7003 F. The ultimate awardee of the proposed contract action must be an authorized repair source. Award of the proposed contract action will not be delayed while an unauthorized source seeks to obtain authorization. G. The Government is requesting a Repair Turnaround Time (RTAT) of: 168 days after receipt of asset. Repair Turnaround Time (RTAT) definition: The resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Please note freight is handled by Navy CAV or Proxy CAV as stated in NAVSUPWSSFA24 or NAVSUPWSSFA25. Throughput Constraint: Contractor must provide a throughput Constraint for eachNSN(s). Total assets to be repaired monthly after initial delivery commences: _____/month (contractor is to fill in #). A throughput of "0" (zero) per monthreflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. H. IMPORTANT NOTE: Reconciliation Price Reduction: Any asset(s) for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late. However, any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If the contractor does not meet the required RTAT due to inexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a "Reconciliation Modification" at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the followingprice reduction amount per unit/per month the contractor does not meet the RTAT: $___________, up to a maximum of: $__________. (vendor is to fill in amount) I. Your quote MUST include the following information for justification purposes: - Repair unit price ________________ - Total price________________ - Repair Turnaround Time (RTAT) _____________ days - New unit price ______________ NOTE: If you are not quoting the Government's Requested Repair Turnaround Time (RTAT) or sooner, you must provide your company's capacity constraints below: ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ - T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evaluation and determination of BR/BER, the contracting officer will negotiate a reduced contract price, not-to exceed (NTE) $___________associated with the repair effort to reflect the BR status of the equipment. - The T&E fee (if asset is determined BR/BER) was determined based on: ____________________________________________________________________ ____________________________________________________________________ - Award to CAGE:________ - Inspection & Acceptance CAGE, if not the same as Award to CAGE: _________ - Facility/Subcontractor CAGE (where the asset should be shipped to), if not same as Award to CAGE. __________ - Facility/Subcontractor or Packaging Facility CAGE (where the asset will be shipped from), if not the same as Award to CAGE. ________ - Cost breakdown requested, including profit rate (if feasible). - Quote expiration date _______________________ (MIN of 90 Days is requested). - Delivery Vehicle (if Delivery Order requested) (if your company has a currentBOA/IDIQ, for example) Accelerated delivery is encouraged and accepted before the delivery date(s)listed in the schedule. IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - any delay determined to be excusable (e.g. Government Delay) will not result in aprice reduction. If a price reduction is required due to unexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a "reconciliation modification" at the end of the contract performance.Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the followingprice reduction amount per unit per month the contractor does not meet the RTAT: $__________, up to a maximum of: $_________. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the PRAIRIE AIR,STBD . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The PRAIRIE AIR,STBD repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;07309 115654091; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 Inspection/Testing Repaired Items - The Contractor shall perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.3 Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation. If you desire to be considered as a potential source for award of this contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer.
Combined Synopsis/Solicitation The National Oceanic and Atmospheric Administration (NOAA), National Marine Fisheries Service/Alaska Fisheries Science Center requires a new navigation electronics package w/installation for the research vessel Sashin at Auke Bay Laboratory. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (ii) Solicitation number 1333MF27Q0001 is issued as a firm fixed price, commercial, request for quotation (RFQ). (iii) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-RFO. (iv) The NAICS code for this acquisition is 336612, Boatyard / Boat building; the small business size standard is 1,000 Employees. This solicitation is restricted to Small Businesses under FAR Part 19 only. Any business submitting a quote for this requirement must be certified and active in SAM.gov as a small business concern with the necessary registrations. Submissions from businesses not certified as a small business will not be considered. Vendors must be registered and active in SAM.gov at the time of quote submission. (v) Line items are as follows: CLIN 0001: Procurement of new replacement navigational electronics; specifications listed in the Statement of Work. CLIN will list the total costs of the equipment obtained for the requirement. CLIN 0002: All effort and labor to remove existing navigational equipment and install replacement new navigational equipment and operationally test the boat after install. A total cost for labor and testing will be listed here. (vi) Description of requirements for the items to be acquired: The vendor is to provide the items in CLIN 0001 and installation/removal services in CLIN 0002 per the attached statement of work. (vii) Date(s) and place(s) of delivery and acceptance and FOB point. Delivery (including installation and testing) is required no later than Apr 30, 2027, to: NOAA Fisheries – TSMRI 17109 Pt Lena Loop Rd Juneau, AK 99801 Please note that a class A AIS is asked for in the components section, however, a class A may be too large for our application (32' small boat). In that case, we would go with a recommended substitute. Please see solicitation document for complete details. TPOC for the requirement will be approving brands/type of replacement components. Work (installation and testing of new components) will be completed in the Juneau, Alaska area by 04/01/2027.
CONTACT INFORMATION|4|N742.9|HRZ|N/A|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|ISO 9001| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications; Combo Receiving Report & Invoice - Material|N/A|TBD|N00104|TBD|TBD|See schedule|TBD|N/A|N/A|N/A|See DD1423|N/A|N/A|See DD1423|Contact the WAWF helpdesk at 866-618- 5988 if assistance is needed| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| FIRM FIXED PRICE REPAIR PURCHASE ORDERS|1|TBD| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| SMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| PROGRESS PAYMENTS (DEVIATION 2026-O0022)(FEB 2026)|4||||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| LIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEV 2026-O0006)(FEB 2026)|1|| INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (DEV 2026-O0048)(MAR 2026)|2||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. THIS SOLICITATION IS BEING ISSUED UNDER EMERGENCY ACQUISITION FLEXIBILITIES. 2. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3. Any contract/order awarded as a result of this solicitation will be a "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 4. All contractual documents (i.e. contracts, purchase orders, and modific ation(s)) related to the instant procurement are considered to be 'issued' by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce method such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to 'issue' contractual documents as detailed herein. 5.If requirement will be packaged at a location different from the offeror's address, the offeror shall provide the name, street address, and CAGE of the facility. 6. If drawings are included in the solicitation, access needs to be requested on the individual solicitation page under Contract Opportunities on the SAM.gov website. After requesting access, send an email to the POC listed on the solicitation. 7. Please provide repair price as Firm Fixed Price for the full repair effort of the requirement. Requested RTAT: 330 days 1. SCOPE 1.1 ;Perform in accordance with document 013124162 SOW (MCM 1 Class Propeller Shaft Statement Of Work).; 2. APPLICABLE DOCUMENTS 2.1 ;Perform in accordance with document 013124162 SOW (MCM 1 Class Propeller Shaft Statement Of Work).; 3. REQUIREMENTS 3.1 ;Perform in accordance with document 013124162 SOW (MCM 1 Class Propeller Shaft Statement Of Work), associated drawings, technical publications, document references, and DD Form 1423 CDRL's.; 3.2 Cage Code/Reference Number Items - The MCM 1, PROP SHAFT repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;07309 106051001-11; 3.3 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 4. QUALITY ASSURANCE 4.1 ;Perform in accordance with document 013124162 SOW (MCM 1 Class Propeller Shaft Statement Of Work). ; 5. PACKAGING 5.1 ;Perform in accordance with document 013124162 SOW (MCM 1 Class Propeller Shaft Statement Of Work). ; MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 ;Perform in accordance with document 013124162 SOW (MCM 1 Class Propeller Shaft Statement Of Work). ; 6.2 ;This repair requirement has an External Statement Of Work PDF document (013124162 SOW). This document is required to perform the necessary requirements. This document should be attached to solicitations/ awards. If this document does not attach to the solicitation/award, sources must contact NAVSUP WSS Contracting Officer to obtain a copy.; For repair requirement: This repair requirement has an External Statement Of Work PDF document. This document is required to perform the necessary repairs. This document should be attached to solicitations/awards. If this document does not attach to the solicitation/award, repair sources must contact NAVSUP WSS Contracting Officer. \ DATE OF FIRST SUBMISSION=030 DAC BLOCK 4: IN LIEU OF THE PREPARATION REQUIREMENTS SPECIFIED IN DI-MGMT-80227, UTILIZE THE FOLLOWING FORMAT. THE REPORT SHALL BE PROVIDED ELECTRONICALLY IN MICROSOFT EXCEL, 2010 VERSION. PLEASE REFERENCE THE MONTHLY SHAFTING REPORT TEMPLATE FORMAT AND INSTRUCTIONS. THE STATUS REPORT SHALL BE SUBMITTED ELECTRONICALLY VIA ELECTRONIC MAIL ON A MONTHLY BASIS. THE REPORT SHALL CONTAIN STATUS BASED ON THE FIRST WORKING DAY OF THE MONTH REPORTED. ITEMS SHIPPED SHALL REMAIN ON THE REPORT FOR ONE ADDITIONAL MONTH AND THEN DELETED. BLOCK 10: STATUS REPORT SHALL BE SUBMITTED MONTHLY BY THE FIFTH WORKING DAY OF EACH MONTH BY ELECTRONIC MAIL. BLOCK 12: THE FIRST SUBMISSION SHALL BE WITHIN 30 DAYS OF CONTRACT AWARD. BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE SUBMITTED MONTHLY BY THE FIFTH WORKING DAY OF EACH MONTH. BLOCK 14: DISTRIBUTION SHALL BE MADE BY ELECTRONIC MAIL. ADDRESSES FOR REPORT DISTRIBUTION SHALL BE OBTAINED FROM THE CONTRACTING OFFICER. DATE OF FIRST SUBMISSION=060 DAC BLOCK 4: PLAN SHALL INCLUDE THE CONTRACTOR'S QUALITY SYSTEM PROCEDURES THAT MEET THE REQUIREMENTS OF ASQ-9002. ADDITIONALLY THE CONTRACTOR SHALL SUBMIT INSPECTION AND TEST PROCEDURES FOR THE INSPECTION AND TESTING OF PROPULSION SHAFT PLUG OR RING GAGES, OTHER INSPECTION FIXTURES OR TOOLS, JIGS AND OTHER SHAFT RELATED ITEMS IN ACCORDANCE WITH CONTRACT REQUIREMENTS. BLOCK 8: APPROVAL WILL BE BASED ON COMPLIANCE WITH CONTRACT SPECIFICATIONS. GOVERNMENT REQUIRES 45 DAYS REVIEW TIME. BLOCK 12: DRAFT COPY SHALL BE SUBMITTED FOR GOVERNMENT REVIEW NO LATER THAN60 DAYS AFTER CONTRACT AWARD. FINAL APPROVALCOPY INCORPORATING ANY GOVERNMENT REVIEW COMMENTS SHALL BE SUBMITTED 30 DAYS AFTER RECEIPT OF GOVERNMENT REVIEW COMMENTS. BLOCK 13: SUBSEQUENT SUBMISSION TO BE SUBMITTED WITHIN 30 DAYS UPON DEVELOPMENT OR REVISION OF THE QUALITY SYSTEM MANUAL OR INSPECTION AND TEST PROCEDURES OR AFTER NOTIFICATION BY THE GOVERNMENT THAT A NEED FOR A REVISION IS REQUIRED. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION IN ADOBE ACROBAT, VERSION 7.0 OR LATER. DOCUMENTS SHALL BE SUBMITTED IN WAWF UTILIZING THE FOLLOWING DODAACS: INSPECT BY: S4306A SHIP TO: N64498 ACCEPT BY: S4306A DATE OF FIRST SUBMISSION=060 DAC BLOCK 4: SUBMIT COPIES OF ALL APPROVED WELDING PROCEDURE QUALIFICIATION TEST REPORTS OR ASSOCIATED APPROVAL LETTERS, AND APPLICABLE QUALIFIED WELDING ROCEDURES NECESSARY TO PERFORM PRODUCTION WELDING. BLOCK 8: APPROVAL WILL BE BASED ON COMPLIANCE WITH CONTRACT SPECIFICATIONS. GOVERNMENT REQUIRES 45 DAYS REVIEW TIME. BLOCK 12: DRAFT COPY SHALL BE SUBMITTED FOR GOVERNMENT REVIEW NO LATER THAN60 DAYS AFTER BOA AWARD. FINAL APPROVAL COPY INCORPORATING ANY GOVERNMENT REVIEW COMMENTS SHALL BE SUBMITTED 30 DAYS AFTER RECEIPT OF GOVERNMENTREVIEW COMMENTS. BLOCK 13: SUBSEQUENT SUBMISSION TO BE SUBMITTED WITHIN 30 DAYS UPON DEVELOPMENT OR REVISION OF THE QUALITY SYSTEM MANUAL OR NSPECTION AND TEST PROCEDURES OR AFTER NOTIFICATION BY THE GOVERNMENT THAT A NEED FOR A REVISION IS REQUIRED. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION IN ADOBE ACROBAT, VERSION 7.0 OR LATER IN WAWF. DOCUMENTS SHALL BE SUBMITTED IN WAWF UTILIZING THE FOLLOWING DODAACS: INSPECT BY: S4306A SHIP TO: N64498 ACCEPT BY: S4306A DATE OF FIRST SUBMISSION=ASREQ BLOCK 4: THIS DATA ITEM SHALL BE SUBMITTED FOR ALL ANTICIPATED UNREPAIRABLE AND OR OUT OF TOLERANCE CONDITIONS. FORMAT AND CONTENT SHALL BE IN ACCORDANCE WITH MIL-STD-973, APPENDIX "E", SHORT FORM IN LIEU OF DI-CMAN-80641B. THE CONTRACTOR SHALL UTILIZE DD FORM 1694 FOR SUBMISSION OF ALL REQUESTS. DEPARTURES (WAIVERS AND DEVIATIONS) SHALL BE SUBMITTED FOR PRE-EXISTING CONDITIONS AND DEPARTURE FROM SPECFICATION GENERATED OR FOUND AFTER THE COMMENCEMENT OF WORK. BLOCK 8: APPROVAL WILL BE BASED UPON IMPACT ON OPERATIONAL PERFORMANCE AND INTEGRITY. GOVERNMENT REQUIRES 30 DAYS REVIEW TIME. ALL DEVIATIONS SHALL BE FORWARDED TO NSWCPD 427 FOR APPROVAL VIA THE DCMA QUALITY ASSURANCE REPRESENTATIVE (QAR) FOR REVIEW OF CLASSIFICATION OF THE DEVIATION. BLOCK 10: SUBMISSION REQUIRED WHENEVER A DEPARTURE FROM SPECIFICATION HAS OCCURRED OR IS ANTICIPATED. THE CONTRACTOR SHALL PROVIDE A COPY OF THE DEPARTURE IN ADOBE ACROBAT, VERSION 7.0 OR LATER. BLOCKS 12 AND 13: NO LATER THAN 15 DAYS AFTER THE NEED FOR WAIVER IS IDENTIFIED CONTRACTOR SHALL NOT ESTIMATE PREPARATION PRICE ON DD FORM 1423-1 BLOCKS 17 AND 18. SUPPORTING DATA SUCH AS DRAWINGS, SKETCHES, PHOTOGRAPHS, CALCULATIONS, FINANCIAL ANALYSIS OR OTHER ATTACHMENTS THAT CLARIFY THE REQUEST FOR WAIVER SHALL BE INCLUDED. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ BLOCK 4. USE THE FOLLOWING REQUIREMENT IN LIEU OF THE SPECIFIED DATA ITEM DESCRIPTION. PRESERVATION, PACKAGING, PACKING, MARKING AND TRANSPORTATION DEFICIENCIES OF ALL GOVERNMENT FURNISHED MATERIAL SHALL BE DOCUMENTED ON A SF 364 AND SUBMITTED AND IN ACCORDANCE WITH SECNAVINST 4355.18A. THE COGNIZANT GOVERNMENT QUALITY ASSURANCE REPRESENTATIVE (QAR) SHALL VERIFY THE ACCURACY AND ADEQUACY OF THE REPORT. A COPY OF THE APPROPRIATE VISUAL PRESERVATION INSPECTION (VPI) REPORT AND PHOTOGRAPHS, WHERE APPROPRIATE, SHALL BE ATTACHED TO THE SF 364. FOR PROPULSION SHAFT PLUG AND RING GAGES, A VISUAL PRESERVATION INSPECTION REPORT, FORM 9243/2 SHALL BE COMPLETED. FOR PROPULSION SHAFTS, A VISUAL PRESERVATION INSPECTION REPORT, FORM 9243/5 SHALL BE COMPLETED. FOR OTHER GOVERNMENT FURNISHED MATERIAL, THE REPORT SHALL BE IN THE CONTRACTOR'S FORMAT. BLOCK 12: INTIAL VISUAL PRESERVATION INSPECTION REPORT SHALL BE SUBMITTED WITHIN 14 DAYS OF RECEIPT OF THE ASSET. BLOCK 13: FINAL VISUAL PRESERVATION INSPECTION REPORT SHALL BE SUBMITTED WITHIN 14 DAYS OF COMPLETION OF FINAL PACKAGING PRIOR TO FINAL DELIVERY. A HARD COPY OF THE FINAL VPI REPORT SHALL BE SHIPPED WITH THE ASSET FOR FINAL DELIVERY. BLOCK 8: APPROVAL WILL BE BASED UPON THE ACCURACY, ADEQUACY AND COMPLIANCE WITH TECHNICAL REQUIREMENTS. ALLOW 10 DAYS FOR GOVERNMENT REVIEW AND ACCEPTANCE. THE CONTRACTOR SHALL SUBMIT A COPY OF THE REPORT IN ADOBE ACROBAT, VERSION 7.0 OR LATER IN WAWF DATE OF FIRST SUBMISSION=ASREQ BLOCK 4: THE FOLLOWING REQUIREMENTS SHALL BE FOLLOWED IN LIEU OF THE SPECIFIED DATA ITEM. FOR PROPULSION SHAFTS, REPORT FORMAT AND CONTENT SHALL COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE TECHNICAL REPAIR STANDARD, NAVSEA S9243-AW-TRS-011/SHAFT AND THE TECHNICAL DATA PACKAGE. CHANGES SHALL NOT BE MADE TO THE INSPECTION FORM FORMAT WITHOUT PRIOR APPROVAL OF NSWCPD 427. ADDITIONAL INFORMATION AND PHOTOGRAPHS SHALL BE PROVIDED IF REQUIRED. A WRITTEN DESCRIPTION IN THE CONTRACTOR'S FORMAT OF RECOMENDED REPAIRS AND OR TEMS NOT ANTICIPATED TO BE REPAIRED WITH APPROPRIATE JUSTIFICATION SHALL BE INCLUDED WITH THE PRE-REPAIR INSPECTION REPORT. THE CONTRACTOR SHALL SUBMIT ALL LIQUID PENETRANT (PT) INSPECTION REPORT/RESULTS DOCUMENTATION ACCOMPLISHED ACCORDINGLY. BLOCK 8: APPROVAL WILL BE BASED UPON THE ACCURACY, ADEQUACY AND COMPLIANCE WITH TECHNICAL REQUIREMENTS. ALLOW 45 DAYS FORGOVERNMENT REVIEW AND APPROVAL. BLOCK 12: PRE-REPAIR INSPECTION REPORT SHALL BE SUBMITTED WITHIN 120 DAYS OF RECEIPT OF THE ASSET. DATE OF FIRST SUBMISSION=ASREQ BLOCK 4: THE FOLLOWING REQUIREMENTS SHALL BE FOLLOWED IN LIEU OF THE SPECIFIED DATA ITEM. FOR PROPULSION SHAFTS, REPORT FORMAT AND CONTENT SHALL COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE TECHNICAL REPAIR STANDARD, NAVSEA S9243-AW-TRS-011/SHAFT AND THE TECHNICAL DATA PACKAGE. CHANGES SHALL NOT BE MADE TO THE INSPECTION FORM FORMAT WITHOUT PRIOR APPROVAL OF NSWCPD 427. ADDITIONAL INFORMATION AND PHOTOGRAPHS SHALL BEPROVIDED IF REQUIRED. THE CONTRACTOR SHALL SUBMIT ALL LIQUID PENETRANT (PT) INSPECTION REPORT/RESULTS DOCUMENTATION ACCOMPLISHED ACCORDINGLY. BLOCK 8: APPROVAL WILL BE BASED UPON THE ACCURACY, ADEQUACY AND COMPLIANCE WITH TECHNICAL REQUIREMENTS. ALLOW 45 DAYS FOR GOVERNMENT REVIEW AND APPROVAL. A HARD COPY OF THE FINAL REPAIR REPORT SHALL BE SHIPPED WITH THE ASSET FOR FINAL DELIVERY. BLOCK 12: THE FINAL REPAIR REPORT SHALL BE SUBMITTED WITHIN 14 DAYS OF COMPLETION OF ALL REPAIRS. THE CONTRACTOR SHALL PROVIDE A COPY OF THE REPORT IN ADOBE ACROBAT, VERSION 7.0 OR LATER IN WAWF. DOCUMENTS SHALL BE SUBMITTED IN WAWF UTILIZING THE FOLLOWING DODAACS: INSPECT BY: S4306A SHIP TO: N64498 ACCEPT BY: N64498 DATE OF FIRST SUBMISSION=ASREQ BLOCK 4: DI-MISC-80678 IS TAILORED AS FOLLOWS: FOR PROPULSION SHAFTS, A CERTIFICATION DOCUMENT IN ACCORDANCE WITH NAVSEA S9243-AW-TRS-011/SHAFT SHALL BE COMPLETED AFTER THE APPROVAL OF THE FINAL INSPECTION REPORT. REPORT FORMAT SHALL BE AS PROVIDED FOR ON THE INSPECTION FORMS. CHANGES SHALL NOT BE MADE TO THE INSPECTION FORM FORMAT WITHOUT PRIOR APPROVAL FROM NSWCPD 427. FOR OTHER GOVERNMENT FURNISHED EQUIPMENT, THE REPORT SHALL BE IN THE CONTRACTOR'S FORMAT. CERTIFICATION DOCUMENTS SHALL BE SIGNED BY THE COGNIZANT DCMA QUALITY ASSURANCE REPRESENTATIVE (QAR). BLOCK 12: SUBMISSION SHALL BE MADE NO LATER THAN 5 DAYS AFTER SIGNATURE OF THE DCMA QAR. A HARD COPY OF THE CERTIFICATION DATA REPORT SHALL BE PACKAGED WITH THE ASSET FOR FINAL DELIVERY. IN ADDITION TO HARD COPY FORMAT, THE CONTRACTOR SHALL PROVIDE A COPY OF THE REPORT IN ADOBE ACROBAT, VERSION 7.0 OR LATER IN WAWF. DOCUMENTS SHALL BE SUBMITTED IN WAWF UTILIZING THE FOLLOWING DODAACS: INSPECT BY: S4306A SHIP TO: N64498 ACCEPT BY: N64498 1. SCOPE 1.1 ;Perform in accordance with document 013124383 SOW (MCM 1 Class Stern Tube Shaft Statement Of Work).; 2. APPLICABLE DOCUMENTS 2.1 ;Perform in accordance with document 013124383 SOW (MCM 1 Class Stern Tube Shaft Statement Of Work). ; 3. REQUIREMENTS 3.1 ;Perform in accordance with document 013124383 SOW (MCM 1 Class Stern Tube Shaft Statement Of Work), associated drawings, technical publications, document references, and DD 1423 CDRL's.; 3.2 Cage Code/Reference Number Items - The MCM 1, STERN SHAFT repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;53711 106051001-12; 3.3 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 4. QUALITY ASSURANCE 4.1 ;Perform in accordance with document 013124383 SOW (MCM 1 Class Stern Tube Shaft Statement Of Work). ; 5. PACKAGING 5.1 ;Perform in accordance with document 013124383 SOW (MCM 1 Class Stern Tube Shaft Statement Of Work). ; MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 ;Perform in accordance with document 013124383 SOW (MCM 1 Class Stern Tube Shaft Statement Of Work). ; 6.2 ;This repair requirement has an External Statement Of Work PDF document (013124383 SOW). This document is required to perform the necessary requirements. This document should be attached to solicitations/ awards. If this document does not attach to the solicitation/award, sources must contact NAVSUP WSS Contracting Officer to obtain a copy.; For repair requirement: This repair requirement has an External Statement Of Work PDF document. This document is required to perform the necessary repairs. This document should be attached to solicitations/awards. If this document does not attach to the solicitation/award, repair sources must contact NAVSUP WSS Contracting Officer. \ DATE OF FIRST SUBMISSION=030 DAC BLOCK 4: IN LIEU OF THE PREPARATION REQUIREMENTS SPECIFIED IN DI-MGMT-80227, UTILIZE THE FOLLOWING FORMAT. THE REPORT SHALL BE PROVIDED ELECTRONICALLY IN MICROSOFT EXCEL, 2010 VERSION. PLEASE REFERENCE THE MONTHLY SHAFTING REPORT TEMPLATE FORMAT AND INSTRUCTIONS. THE STATUS REPORT SHALL BE SUBMITTED ELECTRONICALLY VIA ELECTRONIC MAIL ON A MONTHLY BASIS. THE REPORT SHALL CONTAIN STATUS BASED ON THE FIRST WORKING DAY OF THE MONTH REPORTED. ITEMS SHIPPED SHALL REMAIN ON THE REPORT FOR ONE ADDITIONAL MONTH AND THEN DELETED. BLOCK 10: STATUS REPORT SHALL BE SUBMITTED MONTHLY BY THE FIFTH WORKING DAY OF EACH MONTH BY ELECTRONIC MAIL. BLOCK 12: THE FIRST SUBMISSION SHALL BE WITHIN 30 DAYS OF CONTRACT AWARD. BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE SUBMITTED MONTHLY BY THE FIFTH WORKING DAY OF EACH MONTH. BLOCK 14: DISTRIBUTION SHALL BE MADE BY ELECTRONIC MAIL. ADDRESSES FOR REPORT DISTRIBUTION SHALL BE OBTAINED FROM THE CONTRACTING OFFICER. DATE OF FIRST SUBMISSION=060 DAC BLOCK 4: PLAN SHALL INCLUDE THE CONTRACTOR'S QUALITY SYSTEM PROCEDURES THAT MEET THE REQUIREMENTS OF ASQ-9002. ADDITIONALLY THE CONTRACTOR SHALL SUBMIT INSPECTION AND TEST PROCEDURES FOR THE INSPECTION AND TESTING OF PROPULSION SHAFT PLUG OR RING GAGES, OTHER INSPECTION FIXTURES OR TOOLS, JIGS AND OTHER SHAFT RELATED ITEMS IN ACCORDANCE WITH CONTRACT REQUIREMENTS. BLOCK 8: APPROVAL WILL BE BASED ON COMPLIANCE WITH CONTRACT SPECIFICATIONS. GOVERNMENT REQUIRES 45 DAYS REVIEW TIME. BLOCK 12: DRAFT COPY SHALL BE SUBMITTED FOR GOVERNMENT REVIEW NO LATER THAN60 DAYS AFTER CONTRACT AWARD. FINAL APPROVALCOPY INCORPORATING ANY GOVERNMENT REVIEW COMMENTS SHALL BE SUBMITTED 30 DAYS AFTER RECEIPT OF GOVERNMENT REVIEW COMMENTS. BLOCK 13: SUBSEQUENT SUBMISSION TO BE SUBMITTED WITHIN 30 DAYS UPON DEVELOPMENT OR REVISION OF THE QUALITY SYSTEM MANUAL OR INSPECTION AND TEST PROCEDURES OR AFTER NOTIFICATION BY THE GOVERNMENT THAT A NEED FOR A REVISION IS REQUIRED. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION IN ADOBE ACROBAT, VERSION 7.0 OR LATER. DOCUMENTS SHALL BE SUBMITTED IN WAWF UTILIZING THE FOLLOWING DODAACS: INSPECT BY: S4306A SHIP TO: N64498 ACCEPT BY: S4306A DATE OF FIRST SUBMISSION=060 DAC BLOCK 4: SUBMIT COPIES OF ALL APPROVED WELDING PROCEDURE QUALIFICIATION TEST REPORTS OR ASSOCIATED APPROVAL LETTERS, AND APPLICABLE QUALIFIED WELDING ROCEDURES NECESSARY TO PERFORM PRODUCTION WELDING. BLOCK 8: APPROVAL WILL BE BASED ON COMPLIANCE WITH CONTRACT SPECIFICATIONS. GOVERNMENT REQUIRES 45 DAYS REVIEW TIME. BLOCK 12: DRAFT COPY SHALL BE SUBMITTED FOR GOVERNMENT REVIEW NO LATER THAN60 DAYS AFTER BOA AWARD. FINAL APPROVAL COPY INCORPORATING ANY GOVERNMENT REVIEW COMMENTS SHALL BE SUBMITTED 30 DAYS AFTER RECEIPT OF GOVERNMENTREVIEW COMMENTS. BLOCK 13: SUBSEQUENT SUBMISSION TO BE SUBMITTED WITHIN 30 DAYS UPON DEVELOPMENT OR REVISION OF THE QUALITY SYSTEM MANUAL OR NSPECTION AND TEST PROCEDURES OR AFTER NOTIFICATION BY THE GOVERNMENT THAT A NEED FOR A REVISION IS REQUIRED. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION IN ADOBE ACROBAT, VERSION 7.0 OR LATER IN WAWF. DOCUMENTS SHALL BE SUBMITTED IN WAWF UTILIZING THE FOLLOWING DODAACS: INSPECT BY: S4306A SHIP TO: N64498 ACCEPT BY: S4306A DATE OF FIRST SUBMISSION=ASREQ BLOCK 4: THIS DATA ITEM SHALL BE SUBMITTED FOR ALL ANTICIPATED UNREPAIRABLE AND OR OUT OF TOLERANCE CONDITIONS. FORMAT AND CONTENT SHALL BE IN ACCORDANCE WITH MIL-STD-973, APPENDIX "E", SHORT FORM IN LIEU OF DI-CMAN-80641B. THE CONTRACTOR SHALL UTILIZE DD FORM 1694 FOR SUBMISSION OF ALL REQUESTS. DEPARTURES (WAIVERS AND DEVIATIONS) SHALL BE SUBMITTED FOR PRE-EXISTING CONDITIONS AND DEPARTURE FROM SPECFICATION GENERATED OR FOUND AFTER THE COMMENCEMENT OF WORK. BLOCK 8: APPROVAL WILL BE BASED UPON IMPACT ON OPERATIONAL PERFORMANCE AND INTEGRITY. GOVERNMENT REQUIRES 30 DAYS REVIEW TIME. ALL DEVIATIONS SHALL BE FORWARDED TO NSWCPD 427 FOR APPROVAL VIA THE DCMA QUALITY ASSURANCE REPRESENTATIVE (QAR) FOR REVIEW OF CLASSIFICATION OF THE DEVIATION. BLOCK 10: SUBMISSION REQUIRED WHENEVER A DEPARTURE FROM SPECIFICATION HAS OCCURRED OR IS ANTICIPATED. THE CONTRACTOR SHALL PROVIDE A COPY OF THE DEPARTURE IN ADOBE ACROBAT, VERSION 7.0 OR LATER. BLOCKS 12 AND 13: NO LATER THAN 15 DAYS AFTER THE NEED FOR WAIVER IS IDENTIFIED CONTRACTOR SHALL NOT ESTIMATE PREPARATION PRICE ON DD FORM 1423-1 BLOCKS 17 AND 18. SUPPORTING DATA SUCH AS DRAWINGS, SKETCHES, PHOTOGRAPHS, CALCULATIONS, FINANCIAL ANALYSIS OR OTHER ATTACHMENTS THAT CLARIFY THE REQUEST FOR WAIVER SHALL BE INCLUDED. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ BLOCK 4. USE THE FOLLOWING REQUIREMENT IN LIEU OF THE SPECIFIED DATA ITEM DESCRIPTION. PRESERVATION, PACKAGING, PACKING, MARKING AND TRANSPORTATION DEFICIENCIES OF ALL GOVERNMENT FURNISHED MATERIAL SHALL BE DOCUMENTED ON A SF 364 AND SUBMITTED AND IN ACCORDANCE WITH SECNAVINST 4355.18A. THE COGNIZANT GOVERNMENT QUALITY ASSURANCE REPRESENTATIVE (QAR) SHALL VERIFY THE ACCURACY AND ADEQUACY OF THE REPORT. A COPY OF THE APPROPRIATE VISUAL PRESERVATION INSPECTION (VPI) REPORT AND PHOTOGRAPHS, WHERE APPROPRIATE, SHALL BE ATTACHED TO THE SF 364. FOR PROPULSION SHAFT PLUG AND RING GAGES, A VISUAL PRESERVATION INSPECTION REPORT, FORM 9243/2 SHALL BE COMPLETED. FOR PROPULSION SHAFTS, A VISUAL PRESERVATION INSPECTION REPORT, FORM 9243/5 SHALL BE COMPLETED. FOR OTHER GOVERNMENT FURNISHED MATERIAL, THE REPORT SHALL BE IN THE CONTRACTOR'S FORMAT. BLOCK 12: INTIAL VISUAL PRESERVATION INSPECTION REPORT SHALL BE SUBMITTED WITHIN 14 DAYS OF RECEIPT OF THE ASSET. BLOCK 13: FINAL VISUAL PRESERVATION INSPECTION REPORT SHALL BE SUBMITTED WITHIN 14 DAYS OF COMPLETION OF FINAL PACKAGING PRIOR TO FINAL DELIVERY. A HARD COPY OF THE FINAL VPI REPORT SHALL BE SHIPPED WITH THE ASSET FOR FINAL DELIVERY. BLOCK 8: APPROVAL WILL BE BASED UPON THE ACCURACY, ADEQUACY AND COMPLIANCE WITH TECHNICAL REQUIREMENTS. ALLOW 10 DAYS FOR GOVERNMENT REVIEW AND ACCEPTANCE. THE CONTRACTOR SHALL SUBMIT A COPY OF THE REPORT IN ADOBE ACROBAT, VERSION 7.0 OR LATER IN WAWF DATE OF FIRST SUBMISSION=ASREQ BLOCK 4: THE FOLLOWING REQUIREMENTS SHALL BE FOLLOWED IN LIEU OF THE SPECIFIED DATA ITEM. FOR PROPULSION SHAFTS, REPORT FORMAT AND CONTENT SHALL COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE TECHNICAL REPAIR STANDARD, NAVSEA S9243-AW-TRS-011/SHAFT AND THE TECHNICAL DATA PACKAGE. CHANGES SHALL NOT BE MADE TO THE INSPECTION FORM FORMAT WITHOUT PRIOR APPROVAL OF NSWCPD 427. ADDITIONAL INFORMATION AND PHOTOGRAPHS SHALL BE PROVIDED IF REQUIRED. A WRITTEN DESCRIPTION IN THE CONTRACTOR'S FORMAT OF RECOMENDED REPAIRS AND OR TEMS NOT ANTICIPATED TO BE REPAIRED WITH APPROPRIATE JUSTIFICATION SHALL BE INCLUDED WITH THE PRE-REPAIR INSPECTION REPORT. THE CONTRACTOR SHALL SUBMIT ALL LIQUID PENETRANT (PT) INSPECTION REPORT/RESULTS DOCUMENTATION ACCOMPLISHED ACCORDINGLY. BLOCK 8: APPROVAL WILL BE BASED UPON THE ACCURACY, ADEQUACY AND COMPLIANCE WITH TECHNICAL REQUIREMENTS. ALLOW 45 DAYS FORGOVERNMENT REVIEW AND APPROVAL. BLOCK 12: PRE-REPAIR INSPECTION REPORT SHALL BE SUBMITTED WITHIN 120 DAYS OF RECEIPT OF THE ASSET. DATE OF FIRST SUBMISSION=ASREQ BLOCK 4: THE FOLLOWING REQUIREMENTS SHALL BE FOLLOWED IN LIEU OF THE SPECIFIED DATA ITEM. FOR PROPULSION SHAFTS, REPORT FORMAT AND CONTENT SHALL COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE TECHNICAL REPAIR STANDARD, NAVSEA S9243-AW-TRS-011/SHAFT AND THE TECHNICAL DATA PACKAGE. CHANGES SHALL NOT BE MADE TO THE INSPECTION FORM FORMAT WITHOUT PRIOR APPROVAL OF NSWCPD 427. ADDITIONAL INFORMATION AND PHOTOGRAPHS SHALL BEPROVIDED IF REQUIRED. THE CONTRACTOR SHALL SUBMIT ALL LIQUID PENETRANT (PT) INSPECTION REPORT/RESULTS DOCUMENTATION ACCOMPLISHED ACCORDINGLY. BLOCK 8: APPROVAL WILL BE BASED UPON THE ACCURACY, ADEQUACY AND COMPLIANCE WITH TECHNICAL REQUIREMENTS. ALLOW 45 DAYS FOR GOVERNMENT REVIEW AND APPROVAL. A HARD COPY OF THE FINAL REPAIR REPORT SHALL BE SHIPPED WITH THE ASSET FOR FINAL DELIVERY. BLOCK 12: THE FINAL REPAIR REPORT SHALL BE SUBMITTED WITHIN 14 DAYS OF COMPLETION OF ALL REPAIRS. THE CONTRACTOR SHALL PROVIDE A COPY OF THE REPORT IN ADOBE ACROBAT, VERSION 7.0 OR LATER IN WAWF. DOCUMENTS SHALL BE SUBMITTED IN WAWF UTILIZING THE FOLLOWING DODAACS: INSPECT BY: S4306A SHIP TO: N64498 ACCEPT BY: N64498 DATE OF FIRST SUBMISSION=ASREQ BLOCK 4: DI-MISC-80678 IS TAILORED AS FOLLOWS: FOR PROPULSION SHAFTS, A CERTIFICATION DOCUMENT IN ACCORDANCE WITH NAVSEA S9243-AW-TRS-011/SHAFT SHALL BE COMPLETED AFTER THE APPROVAL OF THE FINAL INSPECTION REPORT. REPORT FORMAT SHALL BE AS PROVIDED FOR ON THE INSPECTION FORMS. CHANGES SHALL NOT BE MADE TO THE INSPECTION FORM FORMAT WITHOUT PRIOR APPROVAL FROM NSWCPD 427. FOR OTHER GOVERNMENT FURNISHED EQUIPMENT, THE REPORT SHALL BE IN THE CONTRACTOR'S FORMAT. CERTIFICATION DOCUMENTS SHALL BE SIGNED BY THE COGNIZANT DCMA QUALITY ASSURANCE REPRESENTATIVE (QAR). BLOCK 12: SUBMISSION SHALL BE MADE NO LATER THAN 5 DAYS AFTER SIGNATURE OF THE DCMA QAR. A HARD COPY OF THE CERTIFICATION DATA REPORT SHALL BE PACKAGED WITH THE ASSET FOR FINAL DELIVERY. IN ADDITION TO HARD COPY FORMAT, THE CONTRACTOR SHALL PROVIDE A COPY OF THE REPORT IN ADOBE ACROBAT, VERSION 7.0 OR LATER IN WAWF. DOCUMENTS SHALL BE SUBMITTED IN WAWF UTILIZING THE FOLLOWING DODAACS: INSPECT BY: S4306A SHIP TO: N64498 ACCEPT BY: N64498
CONTACT INFORMATION|4|N741.6|CP0|N/A|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO INVOICE AND RECEIVING REPORT||TBD|N00104|TBD|TBD|SW3117|34228|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| The purpose of this amendment is to hereby extend the due date for quote. Additionally, to extend pricing as the requirement is in plan to award in FY27. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. The purpose of this amendment is to hereby extend the due date for a re-quote. Additionally, to extend pricing as the requirement is in plan to keep due tothe FY26 S&OP project. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. All freight is FOB Origin. The resultant award of this REPAIR solicitation will be issued bilaterally, requiring the contractors written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. Government Source Inspection (GSI) is required. Your quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:__________ Total Price:__________ PLEASE ATTACH INFORMAL COST BREAKDOWN, IF APPLICABLE:________ Repair Turnaround Time (RTAT): _______ days Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Return Material Authorization # (RMA), if applicable:__________ AWARDEE INFO & PERFORMANCE LOCATION Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same as ""awardee CAGE"":__________ \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the TORQUE ASSIST ASSEM . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DOCUMENT REF DATA=MIL-STD-1686 | | | | |A| | | 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The TORQUE ASSIST ASSEM repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;34228 933F055728; 3.2 Marking - This item shall be physically identified in accordance with MIL-STD-130. 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.4 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 3.5 Electrostatic Discharge Control - The Contractor shall comply with the electrostatic discharge control requirements established in ANSI/ESD S20.20, "ESD Association Standard for the Development of an Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)", which superseded MIL-STD-1686C. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Inspection/Testing Repaired Items - The Contractor shall perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVICP-MECH Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from: Commanding Officer NAVICP-MECH Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH. 6.2 Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation. If you desire to be considered as a potential source for award of this contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer. 6.3 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161.
CONTACT INFORMATION|4|N743.49|WVE|771-229-0573|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material |N50286|TBD|133.2|N/A|N/A|N39040 - Certifications |N/A |N/A|SEE DD FORM 1423 |[email protected] [email protected]| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| This amendment is issued to update the quantity. \ This amendment is issued to update the quantity. \ 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference toN00102 within this order should be updated to N50286. 3. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. PNSY review/acceptance of Certification CDRLs 6 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material will be on or before 365 days after effective date of the resulting contract. 4. Any contract awarded as a result of this solicitation will be "DO" rated order; "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 5. NAVSUP WSS Mechanicsburg will be considering past performance in the evaluation of offers in accordance with DFARS 252.204-7024. 6. If drawings are included in the solicitation, access needs to be requested on the individual solicitation page on Contracts Opportunities on the Government's SAM.gov website. After requesting access, send an email to the Primary POC listed on the solicitation. 7. This order is issued pursuant to Emergency Acquisition Flexibilities (EAF). \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=CPG1022 |96169| F| |D| | | | DRAWING DATA=CPG1022-1 |96169| D| |D| | | | DRAWING DATA=CPG1025 |96169| P| |D| | | | DRAWING DATA=CPG1025-1 |96169| M| |D| | | | DRAWING DATA=CPG1025-2 |96169| L| |D| | | | DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=MIL-STD-2132 | | |D |030211|A| |01| DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |A |081118|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 Manufacture and Design - The item furnished under this contract/purchase order must meet the requirements as specified in CPG 1025, except as amplified or modified herein. CPG 1025 ordering data information is provided below. (a) Penetrator, Connector Type, Electrical; CPG 1025. (b) ;Connectorized, Hull Penetrator Assembly, Single Connector Type, Part Number CPG 1025/2-600.; (c) Special wiring and inboard cables are not required. (d) Pressure proof receptacle caps are not required. (e) Level of preservation, packaging, and marking must be as specified elsewhere in the contract/purchase order. 3.2 First Article Approval (Government Testing) - First Article Test (FAT) and approval is required. 3.3 ;The FAT sample(s) not to be delivered against the contract quantity.; 3.4 ;The Penetrator Assembly will be furnished with both Washers; CPG 1022/1-006 and CPG 1025/1-005. First Article Testing may be performed with either Washer.; 3.5 ;Paragraph 4.1 of CPG 1025 does not apply.; 3.6 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Body (CPG 1025/2-004), Nut (CPG 1022/1-005), and Washers (CPG 1022/1-006 and CPG 1025/1-005); Material - ; QQ-N-286, Form 2 or Form 7, Annealed and Age Hardened. Mechanical properties must be inaccordance with CPG 1025, paragraph 3.3.2; 3.7 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - Non-Destructive Tests Item - ;Weld Repair and/or Production Weld (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification Attribute - Time Temperature plots and certified calibration records of furnace temperature measuring devices Item - ;Each Body (CPG 1025/2-004), Nut (CPG 1022/1-005), and Washers (CPG 1022/1-006 and CPG 1025/1-005); Performance - ;When required by CPG 1025, paragraph 3.3.1.2; Test - ;Dye Penetrant Inspection; Item - ;Each Body (CPG 1025/2-004), Nut (CPG 1022/1-005), and Washers (CPG 1022/1-006 and CPG 1025/1-005); Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - ;Hardness Test; Item - ;Each Body (CPG 1025/2-004), Nut (CPG 1022/1-005), and Washers (CPG 1022/1-006 and CPG 1025/1-005); Performance - ; Paragraph 4.6.1 of CPG1025; Acceptance - ; Paragraph 4.6.1 of CPG1025; Test - Quality Conformance/Compliance Inspection Item - ;Each Hull Penetrator Assembly; Performance - ;CPG 1025, Paragraph 4.5; Acceptance - ;CPG 1025, Paragraph 4.5; Attribute - Annealing and Age Hardening Item - ;Each Body (CPG 1025/2-004), Nut (CPG 1022/1-005), and Washers (CPG 1022/1-006 and CPG 1025/1-005); Performance - QQ-N-286 Test - Ultrasonic Inspection on Starting Material Item - ;All Items requiring certification made from QQ-N-286 with a diameter or minimum distancebetween parallel surfaces of 4 inches or greater of the starting material, or when required by a drawing or specification invoked elsewhere in this contract; Performance - T9074-AS-GIB-010/271 or MIL-STD-2132, and QQ-N-286 Acceptance - QQ-N-286 3.8 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.9 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.10 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.10.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.10.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.10.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.11 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.12 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test of QQ-N-286 must be performed by one of the following laboratories: Huntington Alloys, a Special Metals Company Attn: Bill Bolenr 3200 Riverside Drive Huntington, WV 257059 Phone: (304) 526-5889 FAX: (304) 526-5973 Metallurgical Consultants, Inc. Attn: W. M. Buehler 4820 Caroline PO Box 88046 Houston, TX 77288-0046 Phone: (713) 526-6351 FAX: (713) 526-2964 Naval Surface Warfare Center, Carderock Division Attn: Eric Focht Code 614 9500 Macarthur Blvd West Bethesda, MD 20817-5700 Phone: (301) 227-5032 FAX: (301) 227-5576 Teledyne Allvac Attn: Dr. W. D. Cao 2020 Ashcraft Ave. Monroe, NC 28110 Phone: (704) 289-4511 FAX: (704) 289-4269 Westmoreland Mechanical Testing and Research Inc. Attn: Andrew Wisniewski P.O. Box 388 Youngstown, PA 15696-0388 Mannesmann Rohrenwerke Mannesmann Forschungsinstitut (MFI) Attn: Dr. Weiss Postfach 251160 47251 Duisburg Germany Phone: 011-49-0203-9993194 FAX: 011-49-0203-9994415 ThyssenKrupp VDM USA, Inc. Attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 Houston, TX 77065-4939 Phone: (281) 955-6683 3.13 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this material. Bacteria in water, especially seawater, causes molybdenum disulfide to break down. The by-products of the breakdown form compounds which attack the fasteners. Anti-galling compound A-A-59004 must be used as a replacement when thread lubricant is required for assembly. 3.14 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.15 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing, personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Repair welding is not permitted on ;QQ-N-286 material; . Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.16 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.16.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.16.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.16.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.17 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.18 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.18.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.19 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.20 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds when the conditions of Section 4.2.1.1 of S9074-AR-GIB-010A/278 are met. 3.20.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.20.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. ''WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC'.' WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ'') 3.20.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.20.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.20.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.20.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted as part of the qualification data. 3.20.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element. 3.20.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.20.9 When production or repair welding is required on titanium materials, the applicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval. 3.20.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF. 3.20.11 A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following: a) Filler Metal LOT number(s) b) Specification and Type c) A positive statement that the vendor has obtained OQE and verified thateach LOT of weld filler material conforms to specification requirements. d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption. 3.20.12 When production welds or repair welds are performed by a subcontractor,the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.21 First Article Test/Inspection (Government) - ;Destructive; - The Contractor shall deliver ; one (1); unit(s) to ;Receiving Officer Portsmouth Naval Shipyard, Building 240, Code 270.4 (207-438-5898) KitteryMaine, 03904; for First Article Tests in accordance with the ;requirements of CPG 1025, paragraph 4.4; . 3.22 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.22.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.22.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.22.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.22.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.22.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.23 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.23.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.23.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.24 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.24.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.24.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.24.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.24.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.24.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.25 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.25.1 Visual examination upon receipt to detect damage during transit. 3.25.2 Inspection for completeness and proper type. 3.25.3 Verification of material quality received. 3.25.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.25.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.25.6 Identification and protection from improper use or disposition. 3.25.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.25.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.25.9 Material returned to the contractor must be handled as GFM. 3.26 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.26.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order. 3.27 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.27.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.27.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.27.3 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the assembly identifying the part number, piece number, traceability number, and the location of the permanent mark. 3.27.4 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ; ; 3.28 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply: 3.28.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. 3.28.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified with a new traceability number. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability material and at a minimum contain the information below. 3.28.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. 3.28.4 ELECTRONIC SIGNATURES. 3.28.5 Electronic signatures on Level I certification documents are considered equivalent to handwritten signatures. 3.28.6 Suppliers that use electronic signatures to authenticate company certifications and reports must ensure that process is controlled and unique to the individual signing the document. The signer must take a distinct action to electronically sign the document. 3.28.7 Suppliers must develop one method of authentication to be provided at the time of signature. The authentication method must be based on something known only to the signer (e.g., a password) or based on something only the signer possesses (e.g., a card or other device). 3.28.8 Electronic signature applications must not allow unauthorized users tochange electronically signed documents or records. All changes to electronically signed documents or records made by authorized users must be revision- or date-controlled, must identify the person making the change, and must clearly reflect that the document or record has been revised. 3.28.9 The prime contractor, as a minimum, must flow down the electronic signature requirements to their sub-tier suppliers and sub-contractors that provide electronically signed company certifications and reports to ensure that they have a procedure to control and identify unique processes for only allowing authorized individuals to sign documents. 3.28.10 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.28.11 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.28.12 Revisions of OQE must be provided by the originating organization and must include a description of the data modified along with the proper signature requirements herein. 3.28.13 In cases of foreign certification, conversion of foreign language unitsof measure and properties measured into U.S. units of measure must be annotated on the furnished foreign certifications, if space permits, or placed on an addendum in the same format as the foreign certification data. Such conversion must be identified as to origin with name, title, and signature of the authorized representative of the company making the conversion. 3.28.14 The certification data requirements contained in this appendix must beinvoked on the prime contractor who must delegate these requirements to all sub-tier contractors supplying Level I material. 3.29 Material Handling - The written material control process must include the following: 3.29.1 All raw materials must have traceability markings (except as specified below). 3.29.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. 3.29.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.29.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors. 3.29.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material. 3.29.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.30 Receiving inspection - 3.30.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location. 3.30.2 Receiving Inspection must include as a minimum - Verification that the traceability marking on the material agrees with that on the certification test reports. Verification that certification test reports are legible and complete. Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements. 3.31 Discrepancy reporting - 3.31.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative (QAR). 3.32 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.32.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.32.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.32.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.32.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is legible. 3.33 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address and date. 2. The contract/purchase order number (for example: N00104-11-P-FA12) 3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable). 4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable). 5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable). 6. Manufacturer's compound number ("N/A" when Not Applicable). 7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed satisfactorily. 9. Contractor's or authorized personnel's signature. 4. QUALITY ASSURANCE 4.1 Notes to DCMA QAR and the Contractor - 4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO. 4.1.3 DCMA QAR and the Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements. 4.1.4 DCMA QAR - It is the responsibility of DCMA QAR to review Non-Destructive Testing (NDT) procedures for NAVSUP Contracts/Purchase Orders. 4.1.5 DCMA QAR and the Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at: https://register.nslc.navy.mil/ 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Several definitions of terms that apply to CSI items are listed below. All terms may not apply to every item. 6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD (Contract Support Document) Library within ECDS. 6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the ship, or unacceptable risk of personal injury or loss of life. 6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a critical characteristic is within drawing or specification compliance (such as, testing, measurement, or non-destructive evaluation). 6.1.4 First Article - Pre-production models, initial product samples, test samples produced to ensure a manufacturer's capability to meet full specification requirements. 6.1.5 First Article Test (FAT) - Contractually required testing and inspection of a supplier's pre-production, production, or "production representative" specimens to evaluate a manufacturer's ability to produce conforming product prior to the Government's commitment to receive subsequent production items. First Article Testing is product specific and does not assess manufacturing process controls nor does it assure the effectiveness of the manufacturer's quality program. 6.1.6 Government Source Inspection (GSI) - GSI is independent oversight performed by a government representative usually a DCMA Quality Assurance Representative (QAR)) to assure that those unique product quality and system elements, identified by the Contracting Agency as important, are observed and evaluated. 6.1.7 Quality Assurance Letter of Instruction (QALI) - A QALI is a formal document initiated by a contracting activity that provides essential requirements and instructions for contracted materials to be independently verified and accepted by a government representative prior to shipment. 6.1.8 Objective Quality Evidence (OQE) - The quantitative and qualitative data of all mechanical, chemical, and performance tests performed (as required by the applicable specification, drawing, or purchase document) to prove that the material supplied conforms to the specified requirements. 6.1.9 Surface Discontinuity - Any surface irregularity, marking, or localized change in physical character of the surface, other than dimensional, that exists infrequently at one or several places. (Examples: burrs, dents, nicks, scratches, gouges, pits, center-punches, scribes, and tool marks) Surface discontinuities less than 0.005-inch in depth are acceptable provided they do not violate any other design requirements specified in this Contract/Purchase Order. 6.1.10 Traceability Code - A code or number providing traceability to the actual chemical and mechanical properties of the specified heat, batch, or form from which the material originated. 6.1.11 Verification - An examination performed to determine compliance with a specific requirement. 6.1.12 Nonconformance - A nonconformance is defined as affecting or violating the following: - The requirements of this contract/purchase order. - Contractually invoked drawings (i.e. envelope dimensions, interface dimensions with mating parts/equipment, center of gravity, weights, piece part identification, material, etc.). - Contractually invoked federal, military, or commercial specifications and/or standards. - Form, fit, function, performance to contract requirements, reliability, maintainability, interchangeability, safety of personnel or equipment, or additional cost to the Government. 6.1.13 Waiver - A written authorization to accept an item, which during manufacture, or after having been submitted for Government inspection or acceptance, is found to depart from specified requirements, but nevertheless is considered suitable for use as is or after repair by an approved method. 6.1.14 Deviation - A specific written authorization (granted prior to the manufacture of an item) to depart from a particular requirement(s) of an item's current approved configuration documentation for a specific number of units or a specified period of time, and to accept an item which is found to depart from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method. 6.1.15 Critical Waiver/Deviation - This waiver/deviation consists of a departure involving safety. 6.1.16 Major Waiver/Deviation - This waiver/deviation consists of a departure involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, or Durability of the item or its repair parts - Health or Safety - Effective Use or Operation - Weight, Stability, or Structural Integrity - System design parameters as schematics, flows, pressures or temperatures - Compartment arrangements or assigned function 6.1.17 Minor Waiver/Deviation - This waiver/deviation consists of a departure which does not involve any of the factors listed as critical or major. 6.1.18 Engineering Change (EC) - A change to the current approved configuration documentation of a configuration item at any point in the life cycle of the item. 6.1.19 Engineering Change Proposal (ECP) - A proposed Engineering Change and the documentation by which the change is described, justified, and submitted to the Government for approval or disapproval. 6.1.20 Class I ECP - A class I ECP is approved by the Government's Configuration Control Board and authorized with a contract modification. 6.1.21 Class II ECP - A class II change is typically reviewed for concurrence in classification by the local government representative, unless otherwise specified elsewhere in the contract/purchase order. 6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. 6.2.1 There are 7 (seven) separate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.3 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.4 Recent Updates - A short description of recent updates to the technical requirements of this item are listed below, along with an implementation date for each issue. The notes below are only a generic quick reference and are provided for convenience only, detailed requirements will be defined elsewhere in the technical sections of this Contract/Purchase Order. ;10/20/2016 - Updated ECDS URL Feb 26 2009 - Clarified testing and certs only apply to pieces listed Oct 29 2010 - Added Sampling Std for LI In-Process testing Jun 28 2012 - Updated UT of QQ-N-286 Bar 4" and over Sep 30 2008 - Thread Inspection Requirements were clarified Dec 20 2022 - Removed requirement for vender to submit Waivers/Deviations in ECDS Jan 05 2012 - Added WAWF to forward Approved Waivers/Deviations with final OQE Dec 17 2011 - Moved Quality Assurance Text location for Readability Apr 15 2009 - Clarified the sample size for large and small lot sizes Jan 19 2011 - Added notification of DCMA upon contract award May 02 2009 - Added Lubricants and Sealants to the C of C Aug 27 2014 - Took out contractor's phone number requirement Dec 01 2011 - Moved "Notes to DCMA QAR" to QA Section Jan 5 2017 - ECDS/CSD info was added to Definitions in the Notes section.; DATE OF FIRST SUBMISSION=ASREQ Paragraph 10.4 of DI-QCIC-81110 does not apply. DATE OF FIRST SUBMISSION=ASREQ Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: [email protected] No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: [email protected] No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: [email protected] No material is to be shipped prior to the receipt of Acceptance.
Combined Synopsis/Solicitation The National Oceanic and Atmospheric Administration (NOAA), National Marine Fisheries Service/Alaska Fisheries Science Center requires a new navigation electronics package w/installation for the research vessel Sashin at Auke Bay Laboratory. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (ii) Solicitation number 1333MF27Q0001 is issued as a firm fixed price, commercial, request for quotation (RFQ). (iii) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-RFO. (iv) The NAICS code for this acquisition is 336612, Boatyard / Boat building; the small business size standard is 1,000 Employees. This solicitation is restricted to Small Businesses under FAR Part 19 only. Any business submitting a quote for this requirement must be certified and active in SAM.gov as a small business concern with the necessary registrations. Submissions from businesses not certified as a small business will not be considered. Vendors must be registered and active in SAM.gov at the time of quote submission. (v) Line items are as follows: CLIN 0001: Procurement of new replacement navigational electronics; specifications listed in the Statement of Work. CLIN will list the total costs of the equipment obtained for the requirement. CLIN 0002: All effort and labor to remove existing navigational equipment and install replacement new navigational equipment and operationally test the boat after install. A total cost for labor and testing will be listed here. (vi) Description of requirements for the items to be acquired: The vendor is to provide the items in CLIN 0001 and installation/removal services in CLIN 0002 per the attached statement of work. (vii) Date(s) and place(s) of delivery and acceptance and FOB point. Delivery (including installation and testing) is required no later than Apr 30, 2027, to: NOAA Fisheries – TSMRI 17109 Pt Lena Loop Rd Juneau, AK 99801 Please see solicitation document for complete details. TPOC for the requirement will be approving brands/type of replacement components. Work (installation and testing of new components) will be completed in the Juneau, Alaska area by 04/01/2027. Update: 11/16/2026: A questions and answers document is included with this update. Offerors will need to confirm that they are offering installation and testing services provided by entities with experience and qualifications in marine electronics. Services provided for this requirement are subject to the Service Contract Labor Standards. Please attached wage determination document WDOL 2015-5685. The current SBA size standard for NAICS code 336612 is 1,000 employees or less. Update 11/27/2026: Additional questions and answers posted to this solicitation. See attached SF-30 for updates to FAR 52.212-2 and CLIN structure.
U.S. Customs and Border Protection (CBP), Air and Marine Operations (AMO), anticipates issuing a solicitation for the design, construction, integration, testing, delivery, and associated logistics support of enclosed-cabin Class 4 Inshore Patrol Vessels (IPVs), including compatible trailers, for use by the U.S. Border Patrol (USBP). The anticipated requirement includes two vessel categories: • Patrol Boat-Small (PC1): Vessels 25 feet in length or less, designed for operation in shallow and obstructed waterways, including riverine environments. • Patrol Boat-Medium (PC2): Vessels at least 25 feet and no more than 29 feet in length, designed for operation in rougher open-water, coastal, Great Lakes, and other inshore environments. The anticipated contract may provide for the procurement of up to 117 Class 4 IPVs, including up to 31 PC1 vessels and up to 86 PC2 vessels. Each vessel will include a compatible trailer. Actual quantities and ordering requirements will be established in the solicitation and any resulting contract or orders. The contractor will be responsible for providing vessels that meet the Government’s performance requirements. Anticipated contractor responsibilities include program management; vessel design, engineering, fabrication, manufacturing, and integration; contractor-furnished equipment; quality control; configuration management; testing; technical data, manuals, drawings, and provisioning data; warranty support; delivery; and operator and maintenance familiarization training. All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency.
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specifications Section C and Section E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|6||||||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| STOP-WORK ORDER (AUG 1989)|1|| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications; COMBO - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material|N50286|TBD|133.2|N/A|N/A|N39040 - Certifications|N/A| N/A|See form DD1423|[email protected]| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery|One year from date of delivery||||| SMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (DEV 2026-O0048)(MAR 2026))|7|||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS--ISRAELI TRADE ACT CERTIFICATE (DEV 2026-O0041)(FEB 2026))|2||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| TYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1|| ALTERATIONS IN SOLICITATION (APR 1984)|3|||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| INVITATION TO PROPOSE PERFORMANCE-BASED PAYMENTS (MAR 2000)|1|| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| This amendment hereby extends the closing date to 10 Dec 2026. This request date is due to delay in the return of subvendor quotes and the assumption that many parties, including L3 and subvendors, will be taking time off during and around the Thanksgiving holiday. \ 1. DD1423 Data Items with title of "INSPECTION AND TEST PLAN" SUBTITLE "INSPECTION SYSTEM PROCEDURES" are hereby waived. 2. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference to N00102 within this order should be updated to N50286. 3. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed here in. 4. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. PNSY review/acceptance of Certification CDRLs 30 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material will be on or before 365 days after effective date of the resulting contract. 5. Only those sources with an acceptable Quality Control Manual are eligible for award under this solicitation. Offerors are cautioned that this procurement will not be delayed solely for the purpose of approving additional sources. 6. Any contract awarded because of this solicitation will be a DO rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 7. If requirement is packaged at a location different from the offeror's address, the offeror shall provide the name, street address, and CAGE of the facility. 8. Early and incremental delivery is acceptable at no additional cost to the Government. 9.If drawings are included in the solicitation, access needs to be requested on the individual solicitation page on Contracts Opportunities on the Government's SAM.gov website. After requesting access, send an email to the Primary POC listed on the solicitation. 10.The complete RFP package must be signed and returned prior to the closing date. Emailed or faxed proposals are acceptable. NECO quotes will NOT be accepted and will be determined non-responsive. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.3 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;887F050034 34228 AB D 887F054064 34228 P D 887F054065 34228 T D 887F050190 34228 P D 887F050028 34228 G D ER887.60 34228 C D ER887.133 34228 C D PL887F050028 34228 G D; 2.2.4 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. DRAWING DATA=PL050034 |53711|AB| |D| | | | DRAWING DATA=7491389 |53711| A| |D| | | | DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-A240 | | |B |241115|A| | | DOCUMENT REF DATA=ASTM-A262 | | | |150901|A| | | DOCUMENT REF DATA=ASTM-A582 | | | |221101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |B |081118|A| | | DOCUMENT REF DATA=SAE AMS-QQ-S-763 | | |D |150301|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;The Complete Heated Head Window Assembly must be in accordance with Kollmorgen Drawing 887F050034 and Naval Sea Systems Command drawing PL050034, except as amplified or modified herein.; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Cover, Window, Drawing 887F054064; Material - ;ASTM-A582, UNS30300, Condition A; or SAE AMS-QQ-S-763, Class 304, Condition A; or ASTM-A240, Type 304, Plate or Sheet, Annealed. Must meet the mechanical properties cited in note 7.2 on drawing 887F054064; Part - ;Frame, Window, Drawing 887F054065; Material - ;ASTM-A582, UNS30300, Condition A; or SAE AMS-QQ-S-763, Class 304, Condition A; or ASTM-A240, Type 304, Plate or Sheet, Annealed. Must meet the mechanical properties cited in note 9.2 on drawing 887F054065; Part - ;Window, Heated Head, Drawing 887F050190; Material - ;Fused Silica Corning #7980 or equivalent; 3.3 Certifications - Certifications for the window must show identification of material and the manufacturer of material from which the window was made. 3.4 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - ;Hydrostatic Pressure; Item - ;Heated Head Window Assembly; Performance - ;Note 10 on Drawing 887F050034; Acceptance - ;Without failure or harmful deformation of any part or seal; Attribute - ;Certification of Compliance; Item - ;Window, Heated Head; Performance - ;Note 10 on Drawing 887F050190; Test - ;Acceptance Tests; Item - ;Heated Head Window Assembly; Performance - ;Note 6 on Drawing 887F050034; Acceptance - ;Note 6 on Drawing 887F050034; Test - ;Optical Test; Item - ;Heated Head Window Assembly; Performance - ;Note 7 on Drawing 887F050034; Acceptance - ;Note 7 on Drawing 887F050034; Test - ;Thermal Shock Test; Item - ;Heated Head Window Assembly; Performance - ;Note 11 on Drawing 887F050034 for 30 +5/-0 minutes; Acceptance - ;Note 11 on Drawing 887F050034; Test - Intergranular Corrosion Test (Only for SAE-AMS-QQ-S-763, Classes 304-condition A, 304L, 316-condition A, 316L, 317-condition A, 321 and 347 material. Test must be performed prior to fabrication/machining) Item - ;Cover, Window, Drawing 887F054064 and Frame, Window, Drawing 887F054065; Performance - SAE-AMS-QQ-S-763 Acceptance - SAE-AMS-QQ-S-763 Test - Intergranular Corrosion Testing Item - ;Cover, Window, Drawing 887F054064 and Frame, Window, Drawing 887F054065 (Only required when manufactured from ASTM-A240 material); Performance - ASTM-A262, Practice E Acceptance - ASTM-A262 Test - Non-Destructive Tests Item - ;Weld Repair and/or Production Weld (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification 3.5 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.6 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.7 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.7.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.7.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.7.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.8 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.9 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this material. Bacteria in water, especially seawater, causes molybdenum disulfide to break down. The by-products of the breakdown form compounds which attack the fasteners. Anti-galling compound A-A-59004 must be used as a replacement when thread lubricant is required for assembly. 3.10 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.11 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.11.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.11.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.11.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.12 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.13 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.14 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.14.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.15 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.16 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds when the conditions of Section 4.2.1.1 of S9074-AR-GIB-010A/278 are met. 3.16.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.16.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. ''WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC'.' WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ'') 3.16.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.16.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.16.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.16.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted as part of the qualification data. 3.16.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element. 3.16.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.16.9 When production or repair welding is required on titanium materials, the applicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval. 3.16.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF. 3.16.11 A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following: a) Filler Metal LOT number(s) b) Specification and Type c) A positive statement that the vendor has obtained OQE and verified thateach LOT of weld filler material conforms to specification requirements. d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption. 3.16.12 When production welds or repair welds are performed by a subcontractor,the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.17 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.17.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.17.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.17.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.17.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.17.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.18 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.18.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.18.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.19 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.19.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.19.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.19.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.19.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.19.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.20 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.20.1 Visual examination upon receipt to detect damage during transit. 3.20.2 Inspection for completeness and proper type. 3.20.3 Verification of material quality received. 3.20.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.20.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.20.6 Identification and protection from improper use or disposition. 3.20.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.20.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.20.9 Material returned to the contractor must be handled as GFM. 3.21 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.21.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order. 3.22 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.22.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.22.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.22.3 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the assembly identifying the part number, piece number, traceability number, and the location of the permanent mark. 3.22.4 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ;The Cover, Window must be marked in the location shown on Drawing 887F054064 and the Frame, Window must be marked in the location shown on Drawing 887F054065.; 3.23 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply: 3.23.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. 3.23.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified with a new traceability number. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability material and at a minimum contain the information below. 3.23.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. 3.23.4 ELECTRONIC SIGNATURES. 3.23.5 Electronic signatures on Level I certification documents are considered equivalent to handwritten signatures. 3.23.6 Suppliers that use electronic signatures to authenticate company certifications and reports must ensure that process is controlled and unique to the individual signing the document. The signer must take a distinct action to electronically sign the document. 3.23.7 Suppliers must develop one method of authentication to be provided at the time of signature. The authentication method must be based on something known only to the signer (e.g., a password) or based on something only the signer possesses (e.g., a card or other device). 3.23.8 Electronic signature applications must not allow unauthorized users tochange electronically signed documents or records. All changes to electronically signed documents or records made by authorized users must be revision- or date-controlled, must identify the person making the change, and must clearly reflect that the document or record has been revised. 3.23.9 The prime contractor, as a minimum, must flow down the electronic signature requirements to their sub-tier suppliers and sub-contractors that provide electronically signed company certifications and reports to ensure that they have a procedure to control and identify unique processes for only allowing authorized individuals to sign documents. 3.23.10 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.23.11 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.23.12 Revisions of OQE must be provided by the originating organization and must include a description of the data modified along with the proper signature requirements herein. 3.23.13 In cases of foreign certification, conversion of foreign language unitsof measure and properties measured into U.S. units of measure must be annotated on the furnished foreign certifications, if space permits, or placed on an addendum in the same format as the foreign certification data. Such conversion must be identified as to origin with name, title, and signature of the authorized representative of the company making the conversion. 3.23.14 The certification data requirements contained in this appendix must beinvoked on the prime contractor who must delegate these requirements to all sub-tier contractors supplying Level I material. 3.24 Material Handling - The written material control process must include the following: 3.24.1 All raw materials must have traceability markings (except as specified below). 3.24.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. 3.24.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.24.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors. 3.24.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material. 3.24.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.25 Receiving inspection - 3.25.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location. 3.25.2 Receiving Inspection must include as a minimum - Verification that the traceability marking on the material agrees with that on the certification test reports. Verification that certification test reports are legible and complete. Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements. 3.26 Discrepancy reporting - 3.26.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative (QAR). 3.27 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.27.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.27.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.27.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.27.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is legible. 3.28 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address and date. 2. The contract/purchase order number (for example: N00104-11-P-FA12) 3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable). 4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable). 5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable). 6. Manufacturer's compound number ("N/A" when Not Applicable). 7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed satisfactorily. 9. Contractor's or authorized personnel's signature. 4. QUALITY ASSURANCE 4.1 Notes to DCMA QAR and the Contractor - 4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO. 4.1.3 DCMA QAR and the Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements. 4.1.4 DCMA QAR - It is the responsibility of DCMA QAR to review Non-Destructive Testing (NDT) procedures for NAVSUP Contracts/Purchase Orders. 4.1.5 DCMA QAR and the Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at: https://register.nslc.navy.mil/ 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Several definitions of terms that apply to CSI items are listed below. All terms may not apply to every item. 6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD (Contract Support Document) Library within ECDS. 6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the ship, or unacceptable risk of personal injury or loss of life. 6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a critical characteristic is within drawing or specification compliance (such as, testing, measurement, or non-destructive evaluation). 6.1.4 First Article - Pre-production models, initial product samples, test samples produced to ensure a manufacturer's capability to meet full specification requirements. 6.1.5 First Article Test (FAT) - Contractually required testing and inspection of a supplier's pre-production, production, or "production representative" specimens to evaluate a manufacturer's ability to produce conforming product prior to the Government's commitment to receive subsequent production items. First Article Testing is product specific and does not assess manufacturing process controls nor does it assure the effectiveness of the manufacturer's quality program. 6.1.6 Government Source Inspection (GSI) - GSI is independent oversight performed by a government representative usually a DCMA Quality Assurance Representative (QAR)) to assure that those unique product quality and system elements, identified by the Contracting Agency as important, are observed and evaluated. 6.1.7 Quality Assurance Letter of Instruction (QALI) - A QALI is a formal document initiated by a contracting activity that provides essential requirements and instructions for contracted materials to be independently verified and accepted by a government representative prior to shipment. 6.1.8 Objective Quality Evidence (OQE) - The quantitative and qualitative data of all mechanical, chemical, and performance tests performed (as required by the applicable specification, drawing, or purchase document) to prove that the material supplied conforms to the specified requirements. 6.1.9 Surface Discontinuity - Any surface irregularity, marking, or localized change in physical character of the surface, other than dimensional, that exists infrequently at one or several places. (Examples: burrs, dents, nicks, scratches, gouges, pits, center-punches, scribes, and tool marks) Surface discontinuities less than 0.005-inch in depth are acceptable provided they do not violate any other design requirements specified in this Contract/Purchase Order. 6.1.10 Traceability Code - A code or number providing traceability to the actual chemical and mechanical properties of the specified heat, batch, or form from which the material originated. 6.1.11 Verification - An examination performed to determine compliance with a specific requirement. 6.1.12 Nonconformance - A nonconformance is defined as affecting or violating the following: - The requirements of this contract/purchase order. - Contractually invoked drawings (i.e. envelope dimensions, interface dimensions with mating parts/equipment, center of gravity, weights, piece part identification, material, etc.). - Contractually invoked federal, military, or commercial specifications and/or standards. - Form, fit, function, performance to contract requirements, reliability, maintainability, interchangeability, safety of personnel or equipment, or additional cost to the Government. 6.1.13 Waiver - A written authorization to accept an item, which during manufacture, or after having been submitted for Government inspection or acceptance, is found to depart from specified requirements, but nevertheless is considered suitable for use as is or after repair by an approved method. 6.1.14 Deviation - A specific written authorization (granted prior to the manufacture of an item) to depart from a particular requirement(s) of an item's current approved configuration documentation for a specific number of units or a specified period of time, and to accept an item which is found to depart from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method. 6.1.15 Critical Waiver/Deviation - This waiver/deviation consists of a departure involving safety. 6.1.16 Major Waiver/Deviation - This waiver/deviation consists of a departure involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, or Durability of the item or its repair parts - Health or Safety - Effective Use or Operation - Weight, Stability, or Structural Integrity - System design parameters as schematics, flows, pressures or temperatures - Compartment arrangements or assigned function 6.1.17 Minor Waiver/Deviation - This waiver/deviation consists of a departure which does not involve any of the factors listed as critical or major. 6.1.18 Engineering Change (EC) - A change to the current approved configuration documentation of a configuration item at any point in the life cycle of the item. 6.1.19 Engineering Change Proposal (ECP) - A proposed Engineering Change and the documentation by which the change is described, justified, and submitted to the Government for approval or disapproval. 6.1.20 Class I ECP - A class I ECP is approved by the Government's Configuration Control Board and authorized with a contract modification. 6.1.21 Class II ECP - A class II change is typically reviewed for concurrence in classification by the local government representative, unless otherwise specified elsewhere in the contract/purchase order. 6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. 6.2.1 There are 7 (seven) separate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.3 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.4 Recent Updates - A short description of recent updates to the technical requirements of this item are listed below, along with an implementation date for each issue. The notes below are only a generic quick reference and are provided for convenience only, detailed requirements will be defined elsewhere in the technical sections of this Contract/Purchase Order. ;10/20/2016 - Updated ECDS URL Feb 26 2009 - Clarified testing and certs only apply to pieces listed Oct 29 2010 - Added Sampling Std for LI In-Process testing Feb 03 2011 - Clarified Intergranular Corrosion Test on raw stock Oct 22 2012 - Identified Intergranular Corrosion Test Material Classes Sep 30 2008 - Thread Inspection Requirements were clarified Dec 20 2022 - Removed requirement for vender to submit Waivers/Deviations in ECDS Jan 05 2012 - Added WAWF to forward Approved Waivers/Deviations with final OQE Dec 17 2011 - Moved Quality Assurance Text location for Readability Apr 15 2009 - Clarified the sample size for large and small lot sizes Jan 19 2011 - Added notification of DCMA upon contract award May 02 2009 - Added Lubricants and Sealants to the C of C Aug 27 2014 - Took out contractor's phone number requirement Dec 01 2011 - Moved "Notes to DCMA QAR" to QA Section Jan 5 2017 - ECDS/CSD info was added to Definitions in the Notes section.; DATE OF FIRST SUBMISSION=ASREQ Paragraph 10.4 of DI-QCIC-81110 does not apply. DATE OF FIRST SUBMISSION=ASREQ Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: [email protected] No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: [email protected] No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: [email protected] No material is to be shipped prior to the receipt of Acceptance.
CONTACT INFORMATION|4|N743.49|WVE|771-229-0573|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material |N50286|TBD|133.2|N/A|N/A|N39040 - Certifications |N/A |N/A|SEE DD FORM 1423 |[email protected] [email protected]| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| This amendment is issued to dissolve the small business set-aside and to extend the closing date. \ 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference toN00102 within this order should be updated to N50286. 3. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. Weld procedure and qual data 120 days ADC LT Approval of weld procedures and qual data 60 days after receipt PNSY review/acceptance of Certification CDRLs 6 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material will be on or before 365 days after effective date of the resulting contract. 3. Any contract awarded as a result of this solicitation will be "DO" rated order; "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 4. NAVSUP WSS Mechanicsburg will be considering past performance in the evaluation of offers in accordance with DFARS 252.204-7024. 5. If drawings are included in the solicitation, access needs to be requested on the individual solicitation page on Contracts Opportunities on the Government's SAM.gov website. After requesting access, send an email to the Primary POC listed on the solicitation. 6. This order is issued pursuant to Emergency Acquisition Flexibilities (EAF). \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=CPG1022 |96169| F| |D| | | | DRAWING DATA=CPG1022-1 |96169| D| |D| | | | DRAWING DATA=CPG1025 |96169| R| |D| | | | DRAWING DATA=CPG1025-1 |96169| N| |D| | | | DRAWING DATA=CPG1025-2 |96169| L| |D| | | | DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A|2 | | DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=MIL-STD-2132 | | |D |080310|F| |01| DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | | DOCUMENT REF DATA=MIL-DTL-24231 |0011| |E |130426|A| | | DOCUMENT REF DATA=MIL-DTL-24231 |0013| |E |130426|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |B |081118|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 Manufacture and Design - The item furnished under this contract/purchase order must meet the requirements as specified in CPG 1025, except as amplified or modified herein. CPG 1025 ordering data information is provided below. (a) Penetrator, Connector Type, Electrical; CPG 1025. (b) ;Connectorized Hull Penetrator Assemblies, Multiple Connector Type, Part Number CPG1025/1-113; (c) Special wiring and inboard cables are not required. (d) Pressure proof receptacle caps are not required. (e) Level of preservation, packaging, and marking must be as specified elsewhere in the contract/purchase order. 3.2 First Article Approval (Government Testing) - First Article Test (FAT) and approval is required. 3.3 ;The FAT sample(s) must not be delivered against the contract quantity.; 3.4 ;This Penetrator Assembly must be furnished with both Washers; CPG 1022/1-006 and CPG 1025/1-005. First Article Testing may be performed with either washer.; 3.5 ;Paragraph 4.1 of CPG 1025 does not apply.; 3.6 ;Any paragraphs or design requirements in CPG1025 and CPG1025/1 that are specifically for the Columbia and Dreadnought Classes do not apply.; 3.7 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Penetrator Body (CPG1025/1-001), Penetrator Cover (M24231/11-008), Nut (CPG1022/1-005), and Washers (CPG1022/1-006 and CPG1025/1-005); Material - ;QQ-N-286, Form 2 or Form 7, Annealed and Age Hardened. Mechanical properties to be in accordance with CPG 1025, paragraph 3.3.2; Part - ;Receptacle Body (M24231/13-010); Material - ;QQ-N-281, Class A, Form 1, Hot Finished or Cold Drawn and to meet the requirements of MILDTL-24231, paragraph 3.3.2.1; 3.8 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - Non-Destructive Tests Item - ; Weld Repair (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification Test - 5x Visual Magnification or Dye Penetrant Inspection (root layer) Item - Weldments Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - Visual and Dye Penetrant Inspection (final layer) Item - Weldments Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - Quality Conformance/Compliance Inspection Item - ;Each Penetrator Assembly; Performance - ;CPG 1025, Table 4; Acceptance - ;CPG 1025, Table 4; Test - ;Dye Penetrant Inspection; Item - ;Each Penetrator Body (CPG1025/1-001), Penetrator Cover (M24231/11-008), Nut (CPG1022/1-005), and Washers (CPG1022/1-006 and CPG1025/1-005); Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - ;Hardness Test; Item - ;Each Penetrator Body (CPG1025/1-001), Penetrator Cover (M24231/11-008), Nut (CPG1022/1-005), and Washers (CPG1022/1-006 and CPG1025/1-005); Performance - ;CPG 1025, Paragraph 4.6.1; Acceptance - ;CPG 1025, Paragraph 4.6.1; Test - Ultrasonic Inspection on Starting Material Item - ;All Items requiring certification made from QQ-N-286 with a diameter or minimum distance between parallel surfaces of 4 inches or greater of the starting material, or when required by a drawing or specification invoked elsewhere in this contract; Performance - T9074-AS-GIB-010/271 or MIL-STD-2132, and QQ-N-286 Acceptance - QQ-N-286 Attribute - Annealing and Age Hardening Item - ;Each Penetrator Body (CPG1025/1-001), Penetrator Cover (M24231/11-008), Nut (CPG1022/1-005), and Washers (CPG1022/1-006 and CPG1025/1-005); Performance - QQ-N-286 Attribute - Time Temperature plots and certified calibration records of furnace temperature measuring devices Item - ;Each Penetrator Body (CPG1025/1-001), Penetrator Cover (M24231/11-008), Nut (CPG1022/1-005), and Washers (CPG1022/1-006 and CPG1025/1-005); Performance - ;When required by CPG 1025, paragraph 3.3.1.2; 3.9 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.10 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing, personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Repair welding is not permitted on ;QQ-N-286 material; . Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.11 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.12 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.12.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.12.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.12.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.13 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.14 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test of QQ-N-286 must be performed by one of the following laboratories: Huntington Alloys, a Special Metals Company Attn: Bill Bolenr 3200 Riverside Drive Huntington, WV 257059 Phone: (304) 526-5889 FAX: (304) 526-5973 Metallurgical Consultants, Inc. Attn: W. M. Buehler 4820 Caroline PO Box 88046 Houston, TX 77288-0046 Phone: (713) 526-6351 FAX: (713) 526-2964 Naval Surface Warfare Center, Carderock Division Attn: Eric Focht Code 614 9500 Macarthur Blvd West Bethesda, MD 20817-5700 Phone: (301) 227-5032 FAX: (301) 227-5576 Teledyne Allvac Attn: Dr. W. D. Cao 2020 Ashcraft Ave. Monroe, NC 28110 Phone: (704) 289-4511 FAX: (704) 289-4269 Westmoreland Mechanical Testing and Research Inc. Attn: Andrew Wisniewski P.O. Box 388 Youngstown, PA 15696-0388 Mannesmann Rohrenwerke Mannesmann Forschungsinstitut (MFI) Attn: Dr. Weiss Postfach 251160 47251 Duisburg Germany Phone: 011-49-0203-9993194 FAX: 011-49-0203-9994415 ThyssenKrupp VDM USA, Inc. Attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 Houston, TX 77065-4939 Phone: (281) 955-6683 3.15 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this material. Bacteria in water, especially seawater, causes molybdenum disulfide to break down. The by-products of the breakdown form compounds which attack the fasteners. Anti-galling compound A-A-59004 must be used as a replacement when thread lubricant is required for assembly. 3.16 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.16.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.16.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.16.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.17 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.18 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.19 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.20 See CDRLs DI-MISC-80875 (welding procedures) and DI-MISC-80876 (weld procedure qualification data) - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds when the conditions of Section 4.2.1.1 of S9074-AR-GIB-010A/278 are met. 3.20.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.20.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC." WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ.") 3.20.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.20.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.20.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.20.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted as part of the qualification data. 3.20.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element. 3.20.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.20.9 When production or repair welding is required on titanium materials, the applicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval. 3.20.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF. 3.20.11 See CDRL DI-MISC-80678 (Consumed Weld Metal) - A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following: a) Filler Metal LOT number(s) b) Specification and Type c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements. d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption. 3.20.12 When production welds or repair welds are performed by a subcontractor,the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.21 First Article Test/Inspection (Government) - ;Destructive; - The Contractor shall deliver ;one (1); unit(s) to ;Receiving Officer Portsmouth Naval Shipyard, Building 240, Code 270.4 (207-438-5997) Kittery Maine, 03904-5000; for First Article Tests in accordance with the ;requirements of CPG 1025, paragraph 4.4; . 3.22 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.22.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.22.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.22.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.22.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.22.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.23 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.23.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.23.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.24 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.24.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.24.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.24.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.24.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.24.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.25 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.25.1 Visual examination upon receipt to detect damage during transit. 3.25.2 Inspection for completeness and proper type. 3.25.3 Verification of material quality received. 3.25.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.25.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.25.6 Identification and protection from improper use or disposition. 3.25.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.25.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.25.9 Material returned to the contractor must be handled as GFM. 3.26 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.26.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order. 3.27 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.27.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.27.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.27.3 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the assembly identifying the part number, piece number, traceability number, and the location of the permanent mark. 3.27.4 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ; ; 3.28 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply: 3.28.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. 3.28.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified with a new traceability number. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability material and at a minimum contain the information below. 3.28.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. 3.28.4 ELECTRONIC SIGNATURES. 3.28.5 Electronic signatures on Level I certification documents are considered equivalent to handwritten signatures. 3.28.6 Suppliers that use electronic signatures to authenticate company certifications and reports must ensure that process is controlled and unique to the individual signing the document. The signer must take a distinct action to electronically sign the document. 3.28.7 Suppliers must develop one method of authentication to be provided at the time of signature. The authentication method must be based on something known only to the signer (e.g., a password) or based on something only the signer possesses (e.g., a card or other device). 3.28.8 Electronic signature applications must not allow unauthorized users tochange electronically signed documents or records. All changes to electronically signed documents or records made by authorized users must be revision- or date-controlled, must identify the person making the change, and must clearly reflect that the document or record has been revised. 3.28.9 The prime contractor, as a minimum, must flow down the electronic signature requirements to their sub-tier suppliers and sub-contractors that provide electronically signed company certifications and reports to ensure that they have a procedure to control and identify unique processes for only allowing authorized individuals to sign documents. 3.28.10 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.28.11 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.28.12 Revisions of OQE must be provided by the originating organization and must include a description of the data modified along with the proper signature requirements herein. 3.28.13 In cases of foreign certification, conversion of foreign language unitsof measure and properties measured into U.S. units of measure must be annotated on the furnished foreign certifications, if space permits, or placed on an addendum in the same format as the foreign certification data. Such conversion must be identified as to origin with name, title, and signature of the authorized representative of the company making the conversion. 3.28.14 The certification data requirements contained in this appendix must beinvoked on the prime contractor who must delegate these requirements to all sub-tier contractors supplying Level I material. 3.29 Material Handling - The written material control process must include the following: 3.29.1 All raw materials must have traceability markings (except as specified below). 3.29.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. 3.29.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.29.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors. 3.29.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material. 3.29.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.30 Receiving inspection - 3.30.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location. 3.30.2 Receiving Inspection must include as a minimum - Verification that the traceability marking on the material agrees with that on the certification test reports. Verification that certification test reports are legible and complete. Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements. 3.31 Discrepancy reporting - 3.31.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative (QAR). 3.32 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.32.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.32.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.32.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.32.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is legible. 3.33 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address and date. 2. The contract/purchase order number (for example: N00104-11-P-FA12) 3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable). 4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable). 5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable). 6. Manufacturer's compound number ("N/A" when Not Applicable). 7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed satisfactorily. 9. Contractor's or authorized personnel's signature. 4. QUALITY ASSURANCE 4.1 Notes to DCMA QAR and the Contractor - 4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO. 4.1.3 DCMA QAR and the Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements. 4.1.4 DCMA QAR - It is the responsibility of DCMA QAR to review Non-Destructive Testing (NDT) procedures for NAVSUP Contracts/Purchase Orders. 4.1.5 DCMA QAR and the Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at: https://register.nslc.navy.mil/ 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Several definitions of terms that apply to CSI items are listed below. All terms may not apply to every item. 6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD (Contract Support Document) Library within ECDS. 6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the ship, or unacceptable risk of personal injury or loss of life. 6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a critical characteristic is within drawing or specification compliance (such as, testing, measurement, or non-destructive evaluation). 6.1.4 First Article - Pre-production models, initial product samples, test samples produced to ensure a manufacturer's capability to meet full specification requirements. 6.1.5 First Article Test (FAT) - Contractually required testing and inspection of a supplier's pre-production, production, or "production representative" specimens to evaluate a manufacturer's ability to produce conforming product prior to the Government's commitment to receive subsequent production items. First Article Testing is product specific and does not assess manufacturing process controls nor does it assure the effectiveness of the manufacturer's quality program. 6.1.6 Government Source Inspection (GSI) - GSI is independent oversight performed by a government representative usually a DCMA Quality Assurance Representative (QAR)) to assure that those unique product quality and system elements, identified by the Contracting Agency as important, are observed and evaluated. 6.1.7 Quality Assurance Letter of Instruction (QALI) - A QALI is a formal document initiated by a contracting activity that provides essential requirements and instructions for contracted materials to be independently verified and accepted by a government representative prior to shipment. 6.1.8 Objective Quality Evidence (OQE) - The quantitative and qualitative data of all mechanical, chemical, and performance tests performed (as required by the applicable specification, drawing, or purchase document) to prove that the material supplied conforms to the specified requirements. 6.1.9 Surface Discontinuity - Any surface irregularity, marking, or localized change in physical character of the surface, other than dimensional, that exists infrequently at one or several places. (Examples: burrs, dents, nicks, scratches, gouges, pits, center-punches, scribes, and tool marks) Surface discontinuities less than 0.005-inch in depth are acceptable provided they do not violate any other design requirements specified in this Contract/Purchase Order. 6.1.10 Traceability Code - A code or number providing traceability to the actual chemical and mechanical properties of the specified heat, batch, or form from which the material originated. 6.1.11 Verification - An examination performed to determine compliance with a specific requirement. 6.1.12 Nonconformance - A nonconformance is defined as affecting or violating the following: - The requirements of this contract/purchase order. - Contractually invoked drawings (i.e. envelope dimensions, interface dimensions with mating parts/equipment, center of gravity, weights, piece part identification, material, etc.). - Contractually invoked federal, military, or commercial specifications and/or standards. - Form, fit, function, performance to contract requirements, reliability, maintainability, interchangeability, safety of personnel or equipment, or additional cost to the Government. 6.1.13 Waiver - A written authorization to accept an item, which during manufacture, or after having been submitted for Government inspection or acceptance, is found to depart from specified requirements, but nevertheless is considered suitable for use as is or after repair by an approved method. 6.1.14 Deviation - A specific written authorization (granted prior to the manufacture of an item) to depart from a particular requirement(s) of an item's current approved configuration documentation for a specific number of units or a specified period of time, and to accept an item which is found to depart from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method. 6.1.15 Critical Waiver/Deviation - This waiver/deviation consists of a departure involving safety. 6.1.16 Major Waiver/Deviation - This waiver/deviation consists of a departure involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, or Durability of the item or its repair parts - Health or Safety - Effective Use or Operation - Weight, Stability, or Structural Integrity - System design parameters as schematics, flows, pressures or temperatures - Compartment arrangements or assigned function 6.1.17 Minor Waiver/Deviation - This waiver/deviation consists of a departure which does not involve any of the factors listed as critical or major. 6.1.18 Engineering Change (EC) - A change to the current approved configuration documentation of a configuration item at any point in the life cycle of the item. 6.1.19 Engineering Change Proposal (ECP) - A proposed Engineering Change and the documentation by which the change is described, justified, and submitted to the Government for approval or disapproval. 6.1.20 Class I ECP - A class I ECP is approved by the Government's Configuration Control Board and authorized with a contract modification. 6.1.21 Class II ECP - A class II change is typically reviewed for concurrence in classification by the local government representative, unless otherwise specified elsewhere in the contract/purchase order. 6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. 6.2.1 There are 7 (seven) separate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.3 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.4 Recent Updates - A short description of recent updates to the technical requirements of this item are listed below, along with an implementation date for each issue. The notes below are only a generic quick reference and are provided for convenience only, detailed requirements will be defined elsewhere in the technical sections of this Contract/Purchase Order. ;10/20/2016 - Updated ECDS URL Feb 26 2009 - Clarified testing and certs only apply to pieces listed Oct 29 2010 - Added Sampling Std for LI In-Process testing Jun 28 2012 - Updated UT of QQ-N-286 Bar 4" and over Sep 30 2008 - Thread Inspection Requirements were clarified Dec 20 2022 - Removed requirement for vender to submit Waivers/Deviations in ECDS Jan 05 2012 - Added WAWF to forward Approved Waivers/Deviations with final OQE Dec 17 2011 - Moved Quality Assurance Text location for Readability Apr 22 2009 - Added evidence of DCMA observing test plate welding & NDT Mar 18 2008 - Identify applicable weld joints with weld procedures Apr 15 2009 - Clarified the sample size for large and small lot sizes Jan 19 2011 - Added notification of DCMA upon contract award May 02 2009 - Added Lubricants and Sealants to the C of C Aug 27 2014 - Took out contractor's phone number requirement Dec 01 2011 - Moved "Notes to DCMA QAR" to QA Section Jan 5 2017 - ECDS/CSD info was added to Definitions in the Notes section.; DATE OF FIRST SUBMISSION=ASREQ Paragraph 10.4 of DI-QCIC-81110 does not apply. DATE OF FIRST SUBMISSION=ASREQ Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: [email protected] No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: [email protected] No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: [email protected] No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 12 - Within 120 Days After Contract Award, submit one copy of the welding procedure (for info) with the Qualification Data (for approval/disapproval). Approval must be obtained prior to performing any welding. This review (approval/disapproval) must be within 90 days from date of receipt. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Wor
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|SPRMM1|TBD|TBD|TBD|TBD|||TBD|||||TBD| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|[email protected] and [email protected]| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| PREFERENCE FOR PRIVATELY OWNED U.S.-FLAG COMMERCIAL VESSELS (DEV 2026-O0047)(MAR 2026))|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|X|X|X|||X|||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. All contractual documents (i.e. contracts, purchase orders, task orders, Delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 2. Drawings or technical data are not available for this item. 3. Delivery days_________aro. 4. Offer valid for _____ days. 5. When submitting quotes via Electronic Data Interchange (EDI), make sure you specify any exceptions (i.e. Mil specs/standards, packaging, Inspection & Acceptance (I&A), packaging houses etc) or follow up with a hardcopy of the exceptions. If nothing is indicated or received, award will be based upon solicitation requirements. Changes or requests for changes after award will have consideration costs deducted on modifications. 6. If you are not the manufacturer of the material you are offering, you MUST state who the Original Equipment Manufacturer (OEM) is �Commercial and Government Entity Code (CAGE) code� and the part number you are offering. 7. Please provide an email address for follow up communications. ____________________________________________________________ 8. It is recommended that vendors provide contact information to NAVSUP Weapon System Support (WSS) Mechanicsburg in order to receive automated notifications from Navy Electronic Commerce Online (NECO) when contracts/modifications are issued by Defense Logistics Agency (DLA) Weapons Support Mechanicsburg and posted on Procurement Integrated Enterprise Environment (PIEE) Electronic Data Access (EDA). To receive these notifications, contact: NAVSUPWSS code 025, procurement systems design and contract support division Via email at [email protected]. Please include the following information with your request: CAGE code, company name, address and Point-of-Contact (POC) with phone number and email address. 9. Contractors can view their orders, contracts and modifications at the EDA web tool. This web tool is located at the PIEE website. It is recommended that the contractor register for EDA at https://piee.eb.mil/. Click on new user and registration. Any order resulting from this Request for Quotation will require electronic submittal of Invoice and Receiving Report (COMBO) through PIEE-WAWF. 10. The following DLA Procurement Notes are applicable to this requirement: E06 Inspection and Acceptance at Source (JUN 2018) 11. INSPECTION OF MATERIAL WILL BE AT (CAGE & ADDRESS): ______________________________________________________________ INSPECTION OF PACKAGING AND FINAL ACCEPTANCE OF MATERIAL WILL BE AT (CAGE & ADDRESS): ______________________________________________________________ 12. UCF SECTION F PRODUCTION FACILITY CHANGES (a) The performance of any of the work contracted for in any place other than that named in the contract is prohibited unless specifically approved by the Contracting Officer. Written requests for a change in production facilities must be submitted in writing to the Contracting Officer. Changes in production facilities may be approved, provided: (1) Performance by small business or in labor surplus areas as required by the contract will not be changed; (2) The change will not cause a delay in delivery or necessitate a change in the purchase description; (3) The free on board (f.o.b.) point is not changed; and (4) Each request is supported by a price reduction of $250.00 to cover the Government's administrative costs to process the change. (b) The Government reserves the right to deny approval even if these four elements are met. Award evaluations will be made using the Lowest Price Technically Acceptable (LPTA) criteria per DFARS 215.101-2-70(a)(1)(i). This requirement is being solicited under FAR Part 18, Emergency Acquisitions, utilizing Emergency Acquisition Flexibilities (EAF) Authority. Drawings for this solicitation will be accessed via the website, www.SAM.gov. Click the Search button and type the solicitation number in the box and hit enter. Links to the solicitation should follow on the right. Click the BLUE LINK with the name of the item that is identified as the "Updated Solicitation". Click to the left on "Attachments/Links" which will take you tothe link to request access to the drawings. Drawing access request should be submitted by the Data Custodian listed on your approved DD2345. Only the Data Custodian will be granted access to the controlled drawings. If there are problems accessing the drawings, please contact the buyer POC listed on this solicitation. \ 1. SCOPE 1.1 THIS SPECIFICATION COVERS THE REQUIREMENTS FOR THE PURCHASE OF A LEFT HAND (LH) LCU 1600 CLASS PROPELLER. 1.2 THE CONTRACTOR SHALL MANUFACTURE, INSPECT, TEST, AND PACKAGE THE PROPELLER. THE PROPELLER AND ASSOCIATED INSPECTION TESTING AND PACKAGING SHALL BE IN ACCORDANCE WITH THE LATEST REVISION OF THE PROPELLER DRAWING. 2. APPLICABLE DOCUMENTS 2.1 THE DOCUMENTS LISTED BELOW FORM PART OF THIS CONTRACT/PURCHASE ORDER INCLUDING MODIFICATIONS OR EXTENSIONS. 2.1.1 "DOCUMENT REFERENCES" LISTED BELOW MUST BE OBTAINED BY THE CONTRACTOR. ORDERING INFORMATION IS INCLUDED AS AN ATTACHMENT TO THIS CONTRACT/PURCHASE ORDER. 2.2 ORDER OF PRECEDENCE - IN EVENT OF A CONFLICT BETWEEN THE TEXT OF THIS CONTRACT/PURCHASE ORDER AND THE REFERENCES AND/OR DRAWINGS CITED HEREIN, THE LATEST REVISION OF THE DRAWING SHALL TAKE PRECEDENCE. NOTHING IN THIS CONTRACT/PURCHASE ORDER, HOWEVER, SHALL SUPERSEDE APPLICABLE LAWS AND REGULATIONS UNLESS A SPECIFIC EXEMPTION HAS BEEN OBTAINED. 2.3 UPDATING SPECIFICATIONS AND STANDARDS. IF DURING THE PERFORMANCE OF THIS CONTRACT THE CONTRACTOR BELIEVES THAT THE CONTRACT CONTAINS OUTDATED OR DIFFERENT VERSIONS OF ANY SPECIFICATION OR STANDARD, THE CONTRACTOR MAY REQUEST THAT THE CONTRACT BE UPDATED TO INCLUDE THE CURRENT VERSION OF THE APPLICABLE SPECIFICATION OR STANDARD. UPDATING TO A DIFFERENT VERSION OF A SPECIFICATION OR STANDARD SHALL NOT AFFECT THE FIT, FORM, OR FUNCTION OF ANY DELIVERABLE ITEM OR INCREASE THE COST OR PRICE OF THE ITEM TO THE GOVERNMENT UNLESS SPECIFICALLY AGREED TO BY THE CONTRACTING OFFICER. THE CONTRACTOR SHOULD SUBMIT UPDATE REQUESTS TO THE PCO WITH COPIES TO THE ACO FOR APPROVAL. THE CONTRACTOR SHALL PERFORM THE CONTRACT IN ACCORDANCE WITH THE EXISTING SPECIFICATIONS AND STANDARDS UNTIL NOTIFIED BY THE CONTRACTING OFFICER ON THE DISPOSITION OF THE REQUEST. ANY APPROVED ALTERNATE OR UPDATED SPECIFICATION OR STANDARD WILL BE INCORPORATED INTO THE CONTRACT. 2.4 DOCUMENT REFERENCES: SPECIFICTION NO REV DATE DIST AMEND 245-5110171 (LATEST REVISION) MIL-DTL-2845 (LATEST REVISION) MIL-STD-2035 REV A NSWCCD LTR 932/078 DTD 20 MAY 03 NAVSEA T9074-AS-GIB-010/271 (LATEST REVISION) S9245-AR-TSM-010/PROP (LATEST REVISION) S9086-HM-STM-010/CH245 (LATEST REVISION) ISO 9000 (LATEST REVISION) ASME Y14.5M 2009 ASME B46.1 (LATEST REVISION) FED-STD-H28 (LATEST REVISION) NAVSEA S9074-AQ-010/248 (LATEST REVISION) DOD-STD-2185 (SH) NAVSEA S9074-AR-GIB-010/278 (LATEST REVISION) 245-5110180 (LATEST REVISION) DRAWING DATA=5110169 |53711| B| |D| | | | 3. REQUIREMENTS 3.1 THE PROPELLER FURNISHED UNDER THIS CONTRACT/PURCHASE ORDER SHALL MEET THE REQUIREMENTS AS SPECIFIED ON THE LATEST REVISION OF NAVSEA DRAWING 245-5110169. 3.2 THE CONTRACTOR IS RESPONSIBLE FOR ALL EQUIPMENT WHICH IS NEEDED TO MANUFACTURE, INSPECT AND TEST THE PROPELLER. PROPELLER INSPECTION REQUIREMENTS SHALL BE IN ACCORDANCE WITH NAVSEA DRAWING 245-5110169. THE CONTRACTOR SHALL PREPARE AND SUBMIT A REPORT IN ACCORDANCE WITH THE CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423, CDRL A001). 3.3 CONFIGURATION CONTROL - ASNI/EIA-649-A ENTITLED "NATIONAL CONSENSUS STD FOR CONFIGURATION MANAGEMENT" IS HEREBY INCORPORATED. THE CONTRACTOR SHALL SUBMIT ALL REQUEST FOR CHANGE IN ACCORDANCE WITH ASNI/EIA-649-A, PARAGRAPH 5.3.1. REQUEST FOR VARIANCE SHALL BE PROCESSED IN ACCORDANCE WITH ANSI/EIA-649-A, PARAGRAPH 5.3.2. (ORIGINAL AND TWO COPIES SHALL BE SUBMITTED TO THE CONTRACTING OFFICER, NAVICP-MECH, P.O. BOX 2020, MECHANICSBURG, PA 17055-0788). 3.3.1 CONFIGURATION CONTROL - WHEN THE CONTRACTOR HAS RECEIVED AUTHORIZATION ON A PRIOR CONTRACT FOR THE SAME NSN FOR USE OF A DRAWING OF A LATER VERSION STATUS, THAT AUTHORIZATION IS HEREBY EXTENDED TO ALL SUCCEEDING CONTRACTS/ PURCHASE ORDERS UNTIL ANOTHER DRAWING REVISION IS APPROVED. THE CONTRACTOR WILL NOTIFY THE PCO OF THIS OCCURRENCE IN EACH INSTANCE, IN RESPONSE TO THE SOLICITATION. SUCH NOTIFICATION SHALL BE IN WRITING SETTING FORTH THE CONTRACT UNDER WHICH THE PRIOR AUTHORIZATION WAS GRANTED, THE DATE OF THE GRANTING OF THE AUTHORIZATION, AND THE NAME OF THE GRANTING AUTHORITY. CONTRACTORS SHALL ALSO REFER TECHNICAL INQUIRIES (OTHER THAN THOSE COVERED BY ASNI/EIA-649-A) ON COMPANY LETTERHEAD SIGNED BY A RESPONSIBLE COMPANY OFFICIAL, WITH COPIES DISTRIBUTED AS STATED BELOW. THE ORIGINAL AND TWO COPIES OF ALL CONTRACTOR GENERATED CORRESPONDENCE REGARDING CONFIGURATION SHALL BE SUBMITTED TO THE CONTRACTING OFFICER, NAVSUP-WSS MECHANICSBURG, P. O. BOX 2020, MECHANICSBURG, PA 17055-0788. CONTRACTORS ARE CAUTIONED THAT IMPLEMENTING CHANGES, WAIVERS, DEVIATIONS, OR TECHNICAL INQUIRIES INTO THE CONTRACT/PURCHASE ORDER WITHOUT APPROVAL OF THE CONTRACTING OFFICIER WILL BE AT THE SOLE RISK OF THE CONTRACTOR. THE CONTRACTOR SHALL PREPARE AND SUBMIT A DEPARTURE FROM SPECIFICATION REQUEST IN ACCORDANCE WITH THE CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423, CDRL A002). 3.4 MARKING - THIS ITEM SHALL BE PHYSICALLY IDENTIFIED IN ACCORDANCE WITH NAVSEA DRAWING 245-5110169. 3.5 SERIALIZATION - THE SUPPLIER SHALL MARK A SERIAL NUMBER ASSIGNED BY NSWCCD-CCD CODE 234 AND PROVIDED BY NAVSUP-WSS ON EACH PROPELLER FOR UNIT IDENTIFICATION PURPOSES IN ACCORDANCE WITH NAVSEA DRAWING 245-5110169. 4. QUALITY ASSURANCE 4.1 RESPONSIBILITY FOR INSPECTION - UNLESS OTHERWISE SPECIFIED IN THE CONTRACT/PURCHASE ORDER, THE CONTRACTOR IS RESPONSIBLE FOR THE PERFORMANCE OF ALL INSPECTION REQUIREMENTS AS SPECIFIED HEREIN. EXCEPT AS OTHERWISE SPECIFIED IN THE CONTRACT/PURCHASE ORDER, THE CONTRACTOR SHALL USE HIS OWN OR ANY FACILITIES SUITABLE FOR THE PERFORMANCE OF THE INSPECTION REQUIREMENTS SPECIFIED HEREIN, UNLESS DISAPPROVED BY THE GOVERNMENT. THE GOVERNMENT RESERVES THE RIGHT TO PERFORM ANY OF THE INSPECTIONS SET FORTH IN THE SPECIFICATION WHERE SUCH INSPECTIONS ARE DEEMED NECESSARY TO ASSURE SUPPLIES AND SERVICES CONFORM TO THE PRESCRIBED REQUIREMENTS. 4.2 INSPECTION SYSTEM REQUIREMENTS - THE SUPPLIER SHALL PROVIDE AND MAINTAIN AN INSPECTION SYSTEM ACCEPTABLE IN ACCORDANCE WITH NAVSEA DRAWING 245-5110169. THE CONTRACTOR SHALL PREPARE AND SUBMIT A REPORT IN ACCORDANCE WITH THE CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423, CDRL A003). 4.3 RESPONSIBILITY FOR COMPLIANCE - ALL ITEMS MUST MEET ALL REQUIREMENTS OF THIS CONTRACT/PURCHASE ORDER. THE INSPECTION SET FORTH IN THIS SPECIFICATION SHALL BECOME PART OF THE CONTRACTOR'S OVERALL INSPECTION SYSTEM OR QUALITY PROGRAM. THE ABSENCE OF ANY INSPECTION REQUIREMENTS SHALL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF ASSURING THAT ALL PRODUCTS OR SUPPLIES SUBMITTED TO THE GOVERNMENT FOR ACCEPTANCE COMPLY WITH ALL REQUIREMENTS OF THE CONTRACT/PURCHASE ORDER. SAMPLING IN QUALITY CONFORMANCE DOES NOT AUTHORIZE SUBMISSION OF KNOW DEFECTIVE MATERIAL, EITHER INDICATED OR ACTUAL, NOR DOES IT COMMIT THE GOVERNMENT TO ACCEPTANCE OF DEFECTIVE MATERIAL. 4.4 RECORDS - RECORDS OF ALL INSPECTION WORK BY THE CONTRACTOR SHALL BE KEPT COMPLETE AND AVAILABLE TO THE GOVERNMENT DURING THE PERFORMANCE OF THE CONTRACT/PURCHASE ORDER AND FOR A PERIOD OF 10 YEARS AFTER FINAL DELIVERY OF PROPELLER. 4.5 MATERIAL CERTIFICATION - THE MATERIAL COMPOSITION INSPECTION SHALL CONSIST OF A CERTIFICATION THAT THE MATERIAL REQUIREMENTS HAVE BEEN MET. THE CONTRACTOR SHALL PREPARE AND SUBMIT A REPORT IN ACCORDANCE WITH THE CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423, CDRL A004). 5. PACKAGING 5.1 PRESERVATION, PACKAGING, AND MARKING - PRESERVATION, PACKAGING, PACKING AND MARKING SHALL BE IN ACCORDANCE WITH NAVSEA DRAWING 245-5110169. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 ORDERING INFORMATION FOR DOCUMENT REFERENCES - THE DEPARTMENT OF DEFENSE SINGLE STOCK POINT (DODSSP) WEBSITE HTTP://WWW.DSP.DLA.MIL/ PROVIDES INFORMATION FOR THE DEPARTMENT OF DEFENSE INDEX OF SPECIFICATIONS AND STANDARDS (DODISS) (I.E., MILITARY/FEDERAL SPECIFICATION AND STANDARDS), DATA ITEM DESCRIPTIONS (DIDS), AND OTHER DODSSP PRODUCTS. IF THERE IS A PROBLEM CONNECTING TO THE DODSSP WEBSITE, PLEASE CONTACT EITHER THE SUBSCRIPTION SERVICE DESK (215) 697-2569, OR THE SPECIAL ASSISTANCE DESK (215) 697-2667. THE DODSSP CUSTOMER SERVICE STAFF IS AVAILABLE EVERY BUSINESS DAY BETWEEN THE HOURS OF 7:30 AM AND 4:00 PM EASTERN TIME TO ANSWER YOUR QUESTIONS OR ASSIST IN SOLVING ANY PROBLEMS ENCOUNTERED WHEN ORDERING FROM THE DODSSP COLLECTION OF DEFENSE SPECIFICATION AND STANDARDS, FEDERAL SPECIFICATION AND STANDARDS USED BY DOD, AND OTHER DOD STANDARDIZATION DOCUMENTS. MAIL REQUEST SHOULD BE SUBMITTED TO: NAVY PUBLISHING AND PRINTING SERVICE (SUBSCRIPTIONS) BUILDING 4D 700 ROBBINS AVE PHILADELPHIA, PA 19111 ATTN: DODSSP REQUEST CAN BE TRANSMITTED TO DODSSP VIA FAX NUMBER (215) 697-1462. A. AVAIABILITY OF CANCELLED DOCUMENTS - DODSSP OFFERS CANCELLED DOCUMENTS THAT ARE REQUIRED BY PRIVATE INDUSTRY IN FULFILLMENT OF CONTRACTUAL OBLIGATIONS IN PAPER FORMAT. DOCUMENTS CAN BE REQUESTED BY PHONING THE SUBSCRIPTION SERVICES DESK. B. COMMERCIAL SPECIFICATIONS, STANDARDS, AND DESCRIPTIONS - THESE SPECIFICATIONS, STANDARDS, AND DESCRIPTIONS ARE NOT AVAILABLE FROM GOVERNMENT SOURCES. THEY MAY BE OBTAINED FROM THE PUBLISHER OF THE APPLICABLE SOCIETIES. C. ON POST AWARD ACTIONS REQUEST "FOR OFFICIAL USE ONLY" AND "NOFORN" (NOT RELEASABLE TO FOREIGN NATIONALS) DOCUMENTS MUST IDENTIFY THE GOVERNMENT CONTRACT NUMBER, AND MUST BE SUBMITTED VIA THE COGNIZANT DEFENSE CONTRACT MANAGEMENT AGENCY (DCMA) FOR CERTIFICATION OF NEED FOR DOCUMENT. ON PRE-AWARD ACTIONS SUCH REQUESTS MUST BE SUBMITTED TO THE PCO FOR CERTIFICATION OF NEED FOR DOCUMENT. D. NOFORN MILITARY SPECIFICATIONS AND STANDARDS (INCLUDING AMENDMENTS, CHANGE NOTICES AND SUPPLEMENTS, BUT NOT INTERIM CHANGES) TO BE ORDERED FROM: CONTRACTING OFFICER NAVSUP-WSS MECHANICSBURG CODE 87321 5450 CARLISLE PIKE P. O. BOX 2020 MECHANICSBURG, PA 17055-0788 E. TECHNICAL MANUALS ASSIGNED NAVSEA IDENTIFICATION NUMBERS (I.E., NAVSEA WELDING AND BRAZING PROCEDURES, NAVSEA S9074-AQ-GIB-010/248) ARE TO BE ORDERED FROM: NAVAL SUPPLY SYSTEMS COMMAND WEAPONS SYSTEM SUPPORT CODE 1 SUPPORT BRANCH 700 ROBBINS AVE. PHILADELPHIA, PA 19111-5094 F. INTERIM CHANGES AND CLASSIFICTION SPECIFICATIONS SHALL BE OBTAINED BY SUBMITTING A REQUEST ON DD FORM 1425 TO NAVSUP-WSS MECHANICSBURG. DATE OF FIRST SUBMISSION=ASREQ BLOCK 4 - THE REPORT SHALL DOCUMENT THE RESULTS OF ALL INSPECTIONS AND TEST RESULTS AS REQUIRED BY NAVSEA DRAWING 245-5110169. REPORT FORMAT SHALL BE IN ACCORDANCE WITH NAVSEA DRAWING 245-5110169. BLOCK 8 - ALLOW 15 BUSINESS DAYS FOR GOVERNMENT REVIEW. BLOCK 9 - DISTRIBUTION STATEMENT "D" APPLIES: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. ADMINISTRATIVE OR OPERATIONAL USE (2012). OTHER REQUESTS SHALL BE REFERRED TO DIRECTOR, NAVAL SURFACE WARFARE CENTER, CARDEROCK DIVISION, DETACHMENT NORFOLK. BLOCK 10 - A SEPARATE REPORT SHALL BE SUBMITTED FOR EACH CONTRACTED ITEM INSPECTED AND/OR TESTED. BLOCK 12 - INSPECTION/TEST REPORT SHALL BE SUBMITTED 15 BUSINESS DAYS AFTER INSPECTION/TEST IS COMPLETED. DATE OF FIRST SUBMISSION=ASREQ BLOCK 4 - FORMAT AND CONTENT SHALL BE IN ACCORDANCE WITH NAVSEA DRAWING 245-5110169. BLOCK 8 - APPROVAL WILL BE BASED UPON THE IMPACT ON THE OPERATIONAL PERFORMANCE AND INTEGRITY. GOVERNMENT REQUIRES 15 BUSINESS DAYS REVIEW TIME. ALL DEVIATIONS SHALL BE FORWARD TO NSWC 24 FOR APPROVAL VIA THE DCMA QUALITY ASSURANCE REPRESENTATIVE (QAR) FOR REVIEW, EVALUATION AND DISPOSITION OF DEPARTURE CLASSIFICATION. BLOCK 10 - SUBMISSION REQUIRED WHENEVER A NON-CONFORMING DIMENSION OR CHARACTERISTIC IS ANTICIPATED OR OCCUR AFTER THE FACT. CONTRACTOR SHALL NOT ESTIMATE DEPARTURE PREPARATION PRICE ON DD FORM 1431-1. SUPPORTING DATA SUCH AS DRAWINGS, SKETCHES, PHOTOGRAPHS, CALCULATIONS, FINANCIAL ANALYSIS OR OTHER ATTACHMENTS THAT WILL CLARIFY OR JUSTIFY FOR DEVIATION SHALL BE INCLUDED. DATE OF FIRST SUBMISSION=ASREQ BLOCK 4 - THE PLAN SHALL INCLUDE THE CONTRACTOR'S QUALITY SYSTEM PROCEDURES THAT MEET THE REQUIREMENTS OF NAVSEA DRAWING 245-5110169. ADDITIONALLY, THE CONTRACTOR SHALL SUBMIT INSPECTION AND TESTING PROCEDURES FOR THE PROPELLER IN ACCORDANCE WITH CONTRACT REQUIREMENTS. BLOCK 9 - DISTRIBUTION STATEMENT "D" APPLIES: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. ADMINISTRATIVE OR OPERATIONAL USE (2012). OTHER REQUESTS SHALL BE REFERRED TO DIRECTOR, NAVAL SURFACE WARFARE CENTER, CARDEROCK DIVISION DETACHMENT, NORFOLK. BLOCK 12 - DRAFT COPY SHALL BE SUBMITTED FOR GOVERNMENT REVIEW IN ACCORDANCE WITH NAVSEA DRAWING 245-5110169. BLOCK 13 - SUBSEQUENT SUBMISSION TO BE SUBMITTED WITHIN 30 DAYS UPON DEVELOPMENT OR REVISION OF THE QUALITY SYSTEM MANUAL OR TEST PROCEDURES, OR AFTER NOTIFICATION BY THE GOVERNMENT THAT A NEED FOR A REVISION IS REQUIRED. DATE OF FIRST SUBMISSION=ASREQ BLOCK 4 - REPORT MUST BE SUBMITTED UPON COMPLETION OF MANUFACTURE OF PROPELLER. REPORT SHALL BE SIGNED BY THE CONTRACTOR AND A QUALIFIED GOVERNMENT QUALITY ASSURANCE REPRESENTATIVE (QAR) IN ACCORDANCE WITH NAVSEA DRAWING 245-5110169. BLOCK 9 - DISTRIBUTION STATEMENT "D" APPLIES: DISTRIBUTION AUTHORIZED TO THE DEPARMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. ADMINISTRATIVE OR OPERATIONAL USE (2012). OTHER REQUESTS SHALL BE REFERRED TO DIRECTOR, NAVAL SURFACE WARFARE CENTER, CARDEROCK DIVISION DETACHMENT, NORFOLK.
The Naval Facilities Engineering and Expeditionary Warfare Center (NAVFAC EXWC) Contracting Office (Code CON732) hereby issues Request for Quotation (RFQ) N3943027Q5002 on behalf of the Department of the Navy Oil Spill Response Program (OSRP). This announcement constitutes the official Combined Synopsis/Solicitation for this action. However, all interested vendors must download and review the official solicitation package posted under the Attachments/Links section of this SAM.gov notice, including: Standard Form 1449 (Solicitation N3943027Q5002): Delineates complete pricing schedules (CLINs/SLINs), shipping instructions, active military base entry access requirements, applicable FAR/DFARS provisions and clauses (including Buy American Act certifications), and detailed Addenda to FAR 52.212-1 and FAR 52.212-2. Statement of Work (SOW), Appendix A: Contains comprehensive performance specifications, engineering guides, and mandatory compliance references (including ASTM F631-99, ASTM F1778-97, and ASTM F2709-15 for stationary oil skimmer systems).Therein, offers will find the requirements encompasses the manufacture and/or provisioning, commercial packaging, and FOB destination delivery of complete, interconnected commercial Remotely Operated Vehicle (ROV) oil-skimming systems and compatible wireless camera/video-control packages. In accordance with the Governments pre-solicitation determination, the items/systems require are believed to fit commercial item definitions of FAR 2.101 customarily used by non-governmental entities for precision oil recovery in confined, hazardous, marine, industrial, and dockside environments. Offerors are requested to provide quotations for integrated, functional commercial systems rather than isolated individual components. Any resulting awards of this Request for Quote will be made on a Best Value basis, utilizing streamlined comparative evaluation procedures authorized under the Commercial Products and Simplified Acquisition procedures of 48 CFR. (Note: the Contracting Office will utilize the Revolutionary FAR Overhaul, or RFO, procedures for regulatory compliance.) For reference, quotes and submittals are to be evaluated against three factors, listed in the RFQ attached at the 52.212-2 provision. Offerors are not required (and are actively discouraged from) submitting narrative technical essays. Submissions must emphasize objective commercial catalog sheets, engineering specifications, and a Compliance Traceability Matrix should accompany the core documentation to assist in proving compliance with the SF1449, SOW. This means offers will have complete submissions with three (3) distinct electronic volumes: Volume I Technical Capability, Volume II Past Performance , and Volume III Price Quotation (completed SF 1449 schedule with inclusive CONUS freight).The Contracting Office is holding a Request for Information (RFI) event, in concurrence with all technical, commercial, or contractual questions must be submitted in writing via email to Ryan Kenniff and Nicole Mendes no later than December 07, 2026, at 1430 hours Pacific Standard Time. Questions received after this cut-off may not receive responses. Be advised that RFI inquires will not be answered individually; all official Government questions and responses will be compiled and released via a formal solicitation amendment published to this SAM.gov notice, prior to the offers due deadline.
This requirement is a sole source follow-on production contract to an Other Transaction Authority (OTA) in accordance with 10 U.S.C. 4022 (Authority of the Department of Defense to carry out certain prototype projects) DFARS 206.001-70 (Exception for prototype projects for follow-on production contracts). The incumbent from the OTA is SAAB Inc. (CAGE Code 1EG52). The agreement N666041890001/N666042493202 was competitively awarded through the Undersea Technology Innovation Consortium (UTIC) 23-01-003.This solicitation is to request a proposal from SAAB Inc. (CAGE Code 1EG52). to award a single award, Indefinite Delivery Indefinite Quantity (IDIQ) contract for MK 66 Mod 0 Heavyweight Undersea Training Targets (HUTT), engineering services for future upgrades and enhancements, and support equipment kits. The resultant contract will contain provisions for delivery and task orders to be awarded on a Firm Fixed price (FFP) basis. It is anticipated the single award IDIQ will have an ordering period from the date of contract through sixty (60) months after date of award.
The Department of the Navy Direct Reporting Portfolio Manager (DRPM) / Portfolio Acquisition Executive (PAE) for Robotics and Autonomous Systems (RAS) hereby issues this announcement regarding a forthcoming Area of Interest (AOI) for Medium Unmanned Surface Vehicles (MUSV) Phase II Integration and Testing. MUSV uses modular design principles to create adaptable and resilient solutions that can effectively counter evolving threats. We invite interested parties with expertise in innovative solutions to complex problems, vessel construction, autonomy, perception systems, and general maritime experience to participate in this opportunity. Vendors will be evaluated on platform maturity, open-architecture autonomy compatibility, endurance, payload integration capacity, and rapid-production scalability. To meet the critical operational demand signal for high-volume autonomous vessel procurement over the next decade, DRPM RAS will employ innovative and streamlined acquisition pathways. The government will leverage the authorities of 10 U.S.C. 3458 (Commercial Solutions) and 10 U.S.C. 4022 (Other Transactions) and intends to award Basic Ordering Agreements and prototype other transaction agreements, and potentially production contracts or transactions to successful vendors. To maintain technical superiority and capture rapid commercial innovations, DRPM RAS intends to issue the AOI with a rolling open window. This open call will allow new entrants to compete and existing vendors to submit updated product blocks and modular payload configurations. Approved platforms will be accepted into the maritime marketplace hosted on drones.mil. This digital clearinghouse will empower authorized acquisition authorities and operational stakeholders across the Department of War enterprise to rapidly configure and issue funded delivery orders for vetted maritime autonomous systems without redundant procurement cycles. Formal AOI release is planned on or before September 30, 2026. Detailed AOI instructions will be released via SAM.gov and syndicated at https://drones.mil. Interested industry vendors capable of delivering commercial or dual-use maritime unmanned surface systems are encouraged to ensure active SAM.gov registrations and monitor this notice for amendments, industry day announcements, and formal AOI documentation. All inquiries concerning this notice must be submitted in writing to the Agreements Officer at [email protected] (note this email is distinct/different than the auto generated SAM.gov). ______________________________________________________________________________________________________________Update_as_of_23_September_2026_______________________________________________________________________________________________________________________ DRPM RAS is issuing this Call For Solutions (CFS) under the Drone Marketplace Commercial Solutions Opening W58RGZ26SC001. The presolicitation notice N0003926RR002 has resulted in the CFS W58RGZ-26-S-C001-0008 issued herein. The CFS posting is in place of the aforementioned Area of Interest (AOI), a separate AOI will not be posted. All parties are encouraged to review the specific terms of the CFS posted as an attachment to this SAM.gov posting. This CFS is open for a 5-year period. Solutions will be assessed on a rolling basis beginning on 16 November 2026. This update is only to the general announcement, the CFS document remains unchanged.
How to Win Federal Contracts under NAICS 336612
Federal buyers evaluate offerors under NAICS 336612 through a combination of verified technical capability, past performance relevance, and price reasonableness. Follow this proven pursuit framework:
Check the solicitation Section L & M instructions and ensure SAM.gov registration is active.
Top Federal Buyers for NAICS 336612
Frequently Asked Questions About NAICS 336612
What is NAICS code 336612?
NAICS code 336612 is a standard North American Industry Classification System code used by federal contracting officers to categorize solicitations and establish small business size standards.
How do I bid on NAICS 336612 contracts?
To bid on NAICS 336612 opportunities, ensure your entity is registered on SAM.gov with NAICS 336612 listed in your assertions, and submit a compliant offer in response to the active solicitation.