SAM.GOV SOLICITATIONNoneCombined Synopsis/SolicitationPSC 9130

Amendment 0003 for 1.3B PACOM Bunkers Solicitation

Official federal contracting solicitation issued by DEPT OF DEFENSE.

Notice IDSPE608-27-R-0201-0003Official solicitation number
Response Deadline2026-12-04Proposal submission cutoff
NAICS & PSC324110 / 9130View NAICS Hub →
Set-Aside StatusNoneCompetition designation
⚡ Shred RFP & Draft Proposal with AI →View Authoritative Notice on SAM.gov ↗
PURSUIT QUALIFICATION BRIEF · NOTICE SPE608-27-R-0201-0003

Analyze Solicitation & Generate Compliant Proposal Draft

BidGovAI automatically analyzes Section C (Statement of Work), extracts Section L & M scoring criteria, and tailors a win-themed technical response.

Pursuit Fit Score88% MATCHBased on 324110 & None
RFP Shredder & Matrix

Extracts all Section L & M compliance requirements into a traceable response matrix in ~45 seconds.

FAR Clause Scanner

Detects flow-down clauses, limitation on subcontracting (52.219-14), and CMMC cybersecurity mandates.

Turnaround Acceleration

Cuts proposal production from 30+ manual hours to under 4 hours with tailored technical narratives.

⚡ Start 14-Day Free Trial — Shred this RFP Now →🔒 $0.00 due today • Includes full Solicitation Shredder, Compliance Matrix & 1-click proposal workspace

Contracting Officer & Buyer Contact Information

Official government points of contact registered for this procurement. Use for pre-proposal questions, capability statements, and formal inquiries.

Primary Contracting Officer
Joseph Teye-Kofi
Contracting Officer
Secondary Point of Contact / Specialist
Kimberly Morgan
Contract Specialist

Contract Classification & Agency Hierarchy

DEPARTMENTDEPT OF DEFENSE
PLACE OF PERFORMANCE📍 Fort Belvoir, VA, 22060, USA
PRODUCT SERVICE CODE (PSC)9130
NAICS CODE324110
SET-ASIDE PROGRAMNone
Official Attachments: Download Solicitation Package & Attachments from SAM.gov ↗

Solicitation Statement of Work & Requirements

Scope of Work & Buyer Summary

1. This amendment is hereby executed to provide answers to questions from potential vendors. 2. The email address for the submission of proposals is changed from [email protected] to [email protected]. Questions and Answers Posted Below: // 1.Item 0026 – Singapore: Please confirm the correct delivery port/location, as Attachment A incorrectly references South Korea. Answer: Port of Singapore, Singapore. 2.Item 0012 – Lautoka, Fiji: Please confirm the minimum delivery quantity: 341 MT or 20 MT? Answer: Minimum delivery quantity is 20 MT. 3.Item 0018 – Sattahip, Thailand: Please confirm the minimum delivery quantity: 100 MT or 20 MT? Answer: Minimum delivery quantity is 20 MT. 4.Item 0011 – Laem Chabang, Thailand: Please confirm the minimum delivery quantity: 25 MT or 20 MT? Answer: Minimum delivery quantity is 20 MT. 5.In Attachment A1 Schedule of Supplies, estimated quantities are indicated per line item number as a total quantity within the contract term of 3 years. Is DLA able to provide an estimated annual volume lifting or a committed annual volume range per year? Answer: In a requirements-type contract, the estimated quantity is a realistic projection or good faith estimate of the total supplies or services the buyer will need during the contract period. Therefore, it is basically for planning purposes and based on data. There is no guarantee and therefore, If the buyer's actual needs turn out to be much higher or lower than the estimate, the contractor generally cannot claim an equitable price adjustment just because the estimate was not met. 6.As some taxes/fees vary based on percentage, is Offeror able to submit a price for 2027 and indicative numbers for the remainder of the term years to be revisited as the taxes/fees change? Answer: No. Potential vendors shall submit one price. This price shall escalate according to the Platts escalator to reflect market conditions. 7.Given Majuro’s planned implementation of a new tax system in January 2027, may the Offeror submit its initial bid based on the current tax structure and revise its pricing once the new tax schedule in officially released? Answer: No. Potential vendors shall submit one price. This awarded price shall escalate according to the Platts escalator to reflect market conditions over the length of the contract period. A fixed-price contract with economic price adjustment. After-imposed taxes may be covered under FAR 52.229-6. 8.In Attachment E, Delivery conditions 1.i, Offerors are required to provide “line handlers” for pipeline deliveries. Please clarify the specific responsibilities and scope of this requirement. Answer: Refers to personnel lifting the hose from the pipeline to the ship for delivery. This is part of the delivery process. 9.Are vessels receiving fuel under this requirement expected or permitted to berth inside Cam Ranh Port? Answer: All deliveries are at port side. No anchorage deliveries. 10.If fueling may occur at anchorage outside the port, can DLA provide the anticipated anchorage area or approximate offshore distance from Cam Ranh Port? This information is needed to determine the appropriate fuel depot, bunker barge/tanker, transit distance, travel time, and associated delivery costs. Answer: All deliveries are at port side. No anchorage deliveries. 11.We understand the solicitation includes a 24-hour response/delivery requirement. For planning purposes, can DLA provide the anticipated order frequency or any available historical ordering pattern for Cam Ranh, such as the approximate number of deliveries per month or year or typical interval between orders? This would assist the supplier in determining appropriate fuel inventory, storage capacity, replenishment planning, and bunker-vessel availability. We understand that actual orders may vary and that any historical information would be for planning purposes only. Answer: In a requirements-type contract, the estimated quantity is a realistic projection or good faith estimate of the total supplies or services the buyer will need during the contract period. Therefore, it is basically for planning purposes and based on data. There is no guarantee and therefore, If the buyer's actual needs turn out to be much higher or lower than the estimate, the contractor generally cannot claim an equitable price adjustment just because the estimate was not met. 12.Alternative Delivery Methods: Is barge delivery strictly mandatory for CLINs designated as such, or would DLA consider alternative methods, including shore-based pipeline delivery, direct fueling from terminal facilities, or truck-to-vessel bunkering while the receiving vessel is alongside a berth? Answer: Alternate delivery methods can be submitted. 13.Operational Requirements: If alternative methods are permissible, would they need to meet specific pumping rates, metering, hose, safety, or vessel-access requirements? Answer: A pre-award survey shall determine if it is acceptable. 14.Technical Acceptability: Would a supplier proposing an alternative delivery method remain technically acceptable, or would a formal solicitation amendment be required before such an offer could be considered? Answer: Our DLA Energy Quality shall make that determination. A formal amendment shall not be issued before an award is made on alternate delivery methods. 15.Are vessels receiving fuel under this requirement expected or permitted to berth inside Cam Ranh Port? Answer: All deliveries are at port side. No anchorage deliveries. 16.If fueling may occur at anchorage outside the port, can DLA provide the anticipated anchorage area or approximate offshore distance from Cam Ranh Port? This information is needed to determine the appropriate fuel depot, bunker barge/tanker, transit distance, travel time, and associated delivery costs. Answer: All deliveries are at port side. No anchorage deliveries. 17.We understand the solicitation includes a 24-hour response/delivery requirement. For planning purposes, can DLA provide the anticipated order frequency or any available historical ordering pattern for Cam Ranh, such as the approximate number of deliveries per month or year or typical interval between orders? This would assist the supplier in determining appropriate fuel inventory, storage capacity, replenishment planning, and bunker-vessel availability. We understand that actual orders may vary and that any historical information would be for planning purposes only. Answer: In a requirements-type contract, the estimated quantity is a realistic projection or good faith estimate of the total supplies or services the buyer will need during the contract period. Therefore, it is basically for planning purposes and based on data. There is no guarantee and therefore, If the buyer's actual needs turn out to be much higher or lower than the estimate, the contractor generally cannot claim an equitable price adjustment just because the estimate was not met. 18.Suva, Fiji – CLIN 0005 a.The listed delivery method is ex Barge. There are no barges in Suva and the preferred delivery method is Ex Pipeline. Ex Truck is also available. b.Can you adjust the requested delivery method accordingly? Answer: Vendors can state if the requested delivery mode is not available at a location. Proposals can be submitted based on what is available at a location as an exception to what was originally solicited. 19.Lautoka, Fiji – CLIN 0012 a.The listed delivery method is ex Barge. There are no barges in Lautoka, the only delivery method is Ex Truck. b.Can you adjust the requested delivery method accordingly? Answer: Vendors can state if the requested delivery mode is not available at a location. Proposals can be submitted based on what is available at a location as an exception to what was originally solicited. 20.Koror, Palau – CLIN 0008 a.The listed delivery method is ex Barge. There are no barges in Palau and the preferred delivery method is Ex Pipeline. Ex Truck is also available. b.Can you adjust the requested delivery method accordingly? Answer: Vendors can state if the requested delivery mode is not available at a location. Proposals can be submitted based on what is available at a location as an exception to what was originally solicited. 21.Are there any small business set-asides or preferences for this solicitation? Answer: This solicitation is unrestricted. It is open to all business types. No set-asides. End // 3. All other terms and conditions of Solicitation SPE608-27-R-0201 remained unchanged.

Ready to Respond to this Solicitation?

BidGovAI extracts all compliance criteria, flags dangerous contract clauses (FAR 52.219-14, CMMC, Buy American), and drafts win themes aligned directly with the evaluator.