SAM.GOV SOLICITATIONNoneJustificationPSC Y1PZ

Remediation Services at Tobyhanna

Official federal contracting solicitation issued by DEPT OF DEFENSE.

Notice IDW912BU26RADERPOfficial solicitation number
Response DeadlineOpenProposal submission cutoff
NAICS & PSC562910 / Y1PZView NAICS Hub →
Set-Aside StatusNoneCompetition designation
⚡ Shred RFP & Draft Proposal with AI →View Authoritative Notice on SAM.gov ↗
PURSUIT QUALIFICATION BRIEF · NOTICE W912BU26RADERP

Analyze Solicitation & Generate Compliant Proposal Draft

BidGovAI automatically analyzes Section C (Statement of Work), extracts Section L & M scoring criteria, and tailors a win-themed technical response.

Pursuit Fit Score88% MATCHBased on 562910 & None
RFP Shredder & Matrix

Extracts all Section L & M compliance requirements into a traceable response matrix in ~45 seconds.

FAR Clause Scanner

Detects flow-down clauses, limitation on subcontracting (52.219-14), and CMMC cybersecurity mandates.

Turnaround Acceleration

Cuts proposal production from 30+ manual hours to under 4 hours with tailored technical narratives.

⚡ Start 14-Day Free Trial — Shred this RFP Now →🔒 $0.00 due today • Includes full Solicitation Shredder, Compliance Matrix & 1-click proposal workspace

Contracting Officer & Buyer Contact Information

Official government points of contact registered for this procurement. Use for pre-proposal questions, capability statements, and formal inquiries.

Primary Contracting Officer
Brian Cox
Contracting Officer
Secondary Point of Contact / Specialist
Cherita Williams
Contract Specialist

Contract Classification & Agency Hierarchy

DEPARTMENTDEPT OF DEFENSE
PLACE OF PERFORMANCE📍 Tobyhanna, PA, 18466, USA
PRODUCT SERVICE CODE (PSC)Y1PZ — Construction of Other Hospital Buildings
NAICS CODE562910
SET-ASIDE PROGRAMNone
Official Attachments: Download Solicitation Package & Attachments from SAM.gov ↗

Solicitation Statement of Work & Requirements

Scope of Work & Buyer Summary

In general, the Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to complete the contract requirements specified in Table 1 of this Performance Work Statement (PWS) except for those items specified as Government furnished property and services (see Part 3). The Contractor shall perform to the standards in this PWS and the Basic Contract. 1.1.1 The Contractor shall be responsible for fully executing this firm fixed price contract under a Performance-Based Acquisition (PBA). Work to be accomplished includes, but is not limited to, conducting required environmental remediation services for which the United States Department of the Army (the “Army”) is statutorily responsible; addressing any and all environmental, explosive safety, scheduling, and regulatory issues; and assuming contractual liability and responsibility for the achievement of the contract requirements identified in the PWS. All the contamination associated with these sites shall be addressed including any that has migrated off the installation. 1.1.2 The Contractor shall comply with all applicable Federal, state and local laws and regulations and achieve the contract requirements of this PWS in a manner that is consistent with any applicable orders or permits, all existing cleanup agreements or guidance for the Installation, and relevant DOD and Army regulations, policies, and procedures, for the duration of the contract. 1.1.3 The Contractor shall perform all the necessary environmental remediation work required to meet the contract requirements of this PWS in a manner that is consistent with Comprehensive Environmental Response Compensation and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act (SARA), the National Oil and Hazardous Substances Contingency Plan (NCP) and the CERCLA Section 120 Federal Facility Agreement (FFA).non-severable environmental remediation services required to resolve mandatory Pennsylvania Department of Environmental Protection (PADEP) regulatory comments, install additional sentinel and boundary groundwater monitoring wells, complete downhole borehole geophysics/packer testing, execute quarterly sampling of new wells, prepare addenda to the Quality Assurance Project Plan (QAPP) and Conceptual Site Model (CSM), and conduct one year of sitewide annual groundwater monitoring and fence inspections/repairs. Please see the Scope of Work attached to the notice for each of the required tasks for this requirement.

Ready to Respond to this Solicitation?

BidGovAI extracts all compliance criteria, flags dangerous contract clauses (FAR 52.219-14, CMMC, Buy American), and drafts win themes aligned directly with the evaluator.

Start Free 14-Day Trial — Analyze this Opportunity →