SAM.GOV SOLICITATIONNoneJustificationPSC R425

R--Technical Support for Assessment and Watershed Protection-3

Official federal contracting solicitation issued by DEPT OF DEFENSE.

Notice ID68HERW26Q0086Official solicitation number
Response DeadlineOpenProposal submission cutoff
NAICS & PSC541620 / R425View NAICS Hub →
Set-Aside StatusNoneCompetition designation
⚡ Shred RFP & Draft Proposal with AI →View Authoritative Notice on SAM.gov ↗
PURSUIT QUALIFICATION BRIEF · NOTICE 68HERW26Q0086

Analyze Solicitation & Generate Compliant Proposal Draft

BidGovAI automatically analyzes Section C (Statement of Work), extracts Section L & M scoring criteria, and tailors a win-themed technical response.

Pursuit Fit Score88% MATCHBased on 541620 & None
RFP Shredder & Matrix

Extracts all Section L & M compliance requirements into a traceable response matrix in ~45 seconds.

FAR Clause Scanner

Detects flow-down clauses, limitation on subcontracting (52.219-14), and CMMC cybersecurity mandates.

Turnaround Acceleration

Cuts proposal production from 30+ manual hours to under 4 hours with tailored technical narratives.

⚡ Start 14-Day Free Trial — Shred this RFP Now →🔒 $0.00 due today • Includes full Solicitation Shredder, Compliance Matrix & 1-click proposal workspace

Contracting Officer & Buyer Contact Information

Official government points of contact registered for this procurement. Use for pre-proposal questions, capability statements, and formal inquiries.

Primary Contracting Officer
Jones-Banks, Dionna
Contracting Officer

Contract Classification & Agency Hierarchy

DEPARTMENTDEPT OF DEFENSE
PLACE OF PERFORMANCE📍 [object Object], [object Object], [object Object]
PRODUCT SERVICE CODE (PSC)R425 — Support — Professional: Engineering/Technical
NAICS CODE541620
SET-ASIDE PROGRAMNone
Official Attachments: Download Solicitation Package & Attachments from SAM.gov ↗

Solicitation Statement of Work & Requirements

Scope of Work & Buyer Summary

R425-Call Order for US Virgin Islands Basic Water Quality Monitoring Program (USVI BWQMP) The purpose of this justification is to notify the public of the sole source award to Research Triangle Institute for the Water and OITA Branch /Water Tribal Science Division BPA Contract (Award # 68HERC22A0020/68HERW26F0244). Authority Cited: The statutory authority permitting other than full and open competition is 41 U.S.C. 253(c) (2) in accordance with GSAM/R 538.7104-3(b)(iii) as this is a logical follow to an FSS order already issued on a competitive basis. Need & Justification: Under GSAM/R 538.7104-3(b)(iii) this Call Order has been issued on a sole-source basis to provide support for the US Virgin Islands Basic Water Quality Monitoring Program (USVI BWQMP). In the interest of efficiency, awarding this call order to RTI would allow work to continue without the need for additional planning time that would be required if a new/different vendor was awarded this call order. The relationship between the current order and the follow-on is logical in scope and technical expertise. This new call order will allow the continuation of highly technical work that needs to be restarted under the new call order. The Contracting Officer and the Program Office are confident that the anticipated cost to the government will be fair and reasonable. The Total Maximum Daily Load (TMDL) technical projects are inherently complex, multi-year endeavors that require extensive scientific analysis before reports can be authored and results organized within the Clean Water Act regulatory frameworks. These projects are large and complex in several ways: they cover expansive geographic areas, require detailed technical analyses, and involve the integration of multiple Clean Water Act programs. Due to their complexity, TMDL projects often span multiple years and are divided into different phases to effectively organize and manage the workload. Moreover, these projects involve comprehensive administrative processes, including public comment periods and hearings, before the TMDLs can be officially established. The complexity and specificity of these projects necessitate an uninterrupted continuation of work to ensure compliance with the court-mandated schedule. Introducing a new contractor at this stage would risk significant delays and increased costs, potentially jeopardizing the EPA's ability to meet critical deadlines and fulfill its legal obligations.

Ready to Respond to this Solicitation?

BidGovAI extracts all compliance criteria, flags dangerous contract clauses (FAR 52.219-14, CMMC, Buy American), and drafts win themes aligned directly with the evaluator.

Start Free 14-Day Trial — Analyze this Opportunity →