SAM.GOV SOLICITATIONNoneJustificationPSC 3910

Logistics Modernization Integration Support (LMIS) for Defense Logistics Agency (DLA) Distribution, Pool 1, Enterprise Facility Modernization, EDC Equipment Modernization

Official federal contracting solicitation issued by DEPT OF DEFENSE.

Notice IDSP3300-20-F-1300-P00041Official solicitation number
Response DeadlineOpenProposal submission cutoff
NAICS & PSC333922 / 3910View NAICS Hub →
Set-Aside StatusNoneCompetition designation
⚡ Shred RFP & Draft Proposal with AI →View Authoritative Notice on SAM.gov ↗
PURSUIT QUALIFICATION BRIEF · NOTICE SP3300-20-F-1300-P00041

Analyze Solicitation & Generate Compliant Proposal Draft

BidGovAI automatically analyzes Section C (Statement of Work), extracts Section L & M scoring criteria, and tailors a win-themed technical response.

Pursuit Fit Score88% MATCHBased on 333922 & None
RFP Shredder & Matrix

Extracts all Section L & M compliance requirements into a traceable response matrix in ~45 seconds.

FAR Clause Scanner

Detects flow-down clauses, limitation on subcontracting (52.219-14), and CMMC cybersecurity mandates.

Turnaround Acceleration

Cuts proposal production from 30+ manual hours to under 4 hours with tailored technical narratives.

⚡ Start 14-Day Free Trial — Shred this RFP Now →🔒 $0.00 due today • Includes full Solicitation Shredder, Compliance Matrix & 1-click proposal workspace

Contracting Officer & Buyer Contact Information

Official government points of contact registered for this procurement. Use for pre-proposal questions, capability statements, and formal inquiries.

Primary Contracting Officer
Melanie Morris
Contracting Officer
Secondary Point of Contact / Specialist
Joshua Woodworth
Contract Specialist

Contract Classification & Agency Hierarchy

DEPARTMENTDEPT OF DEFENSE
PLACE OF PERFORMANCE📍 New Cumberland, PA, 17070, USA
PRODUCT SERVICE CODE (PSC)3910
NAICS CODE333922
SET-ASIDE PROGRAMNone
Official Attachments: Download Solicitation Package & Attachments from SAM.gov ↗

Solicitation Statement of Work & Requirements

Scope of Work & Buyer Summary

In accordance with FAR 6.302-1, the Defense Logistics Agency (DLA) anticipates issuing modifications to existing EDC Modernization Delivery Order SP3300-20-F-1300 on a sole source basis to Advantaged Solutions, Inc. for additional software development due to design gaps, and additional OCM support. Advantage Solutions Inc. has a general contractor on site to make modifications to the facility, to include the requirements listed above. Awarding to another vendor would add unwarranted complexity to the integration of systems. Additional vendors would require them to mobilize multiple times at an increased cost. ASI is already contracted to perform the installation and integration requirements listed above, which need to be appropriately coordinated for the work to be performed. In accordance with FAR 6.302-1, Advantage Solutions, Inc. is the only responsible source capable of providing these requirements at this time. The J&A for the modifications are being posted as part of this notice. This is not a solicitation for proposals or an invitation for bids. The Government does not anticipate receiving responses to this notice of a non-competitive action.

Ready to Respond to this Solicitation?

BidGovAI extracts all compliance criteria, flags dangerous contract clauses (FAR 52.219-14, CMMC, Buy American), and drafts win themes aligned directly with the evaluator.

Start Free 14-Day Trial — Analyze this Opportunity →