Analyze Solicitation & Generate Compliant Proposal Draft
BidGovAI automatically analyzes Section C (Statement of Work), extracts Section L & M scoring criteria, and tailors a win-themed technical response.
Extracts all Section L & M compliance requirements into a traceable response matrix in ~45 seconds.
Detects flow-down clauses, limitation on subcontracting (52.219-14), and CMMC cybersecurity mandates.
Cuts proposal production from 30+ manual hours to under 4 hours with tailored technical narratives.
Contracting Officer & Buyer Contact Information
Official government points of contact registered for this procurement. Use for pre-proposal questions, capability statements, and formal inquiries.
Contract Classification & Agency Hierarchy
Solicitation Statement of Work & Requirements
Scope of Work & Buyer Summary
A.3 PRICE/COST SCHEDULE ITEM INFORMATION ITEM NUMBER DESCRIPTION OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0001 1.00 JB $1,999,112.00 $1,999,112.00 516-26-117 Repair Steam Piping in Manhole Near Building 1 - This project shall repair/replace the jacked steam line and or compromised condensate lines in the manhole near building 1. The objective of this work is three-fold. First is to order long lead time Rovanco Underground steam piping. Second is to install two (2) rental boilers in B71 and 101 to provide hot water for these buildings during the repair once the long lead pipes are delivered. These are the only buildings fed by this steam leg that houses patients overnight and therefore the primary focus of heating requirements. Even with preordering the exterior piping before shutting down the steam to this manhole, this repair will take weeks to complete. These boilers will need to be powered from diesel powered generator(s) as there is not sufficient available electrical power in the buildings. Third is to purchase, install and test/commission all required steam piping to repair this leak including the Rovanco piping sections. This will include digging up the ground at least 6 foot away from this manhole to replace 2 sets of pipes that go into and come out of this manhole as well as replacing all piping and fittings inside the manhole. Contract Period: Base POP Begin: 10/16/2026 POP End: 07/30/2027 PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Z1DA - Maintenance of Hospitals and Infirmaries GRAND TOTAL $1,999,112.00