SAM.GOV SOLICITATIONNoneSpecial NoticePSC Y1FB

Fort McCoy Multipurpose Athletic Field Design-Build-to-Budget Industry Day / Pre-Solicitation Conference & Site Visit

Official federal contracting solicitation issued by DEPT OF DEFENSE.

Notice IDW912QR-27-McCoy-MPAFOfficial solicitation number
Response Deadline2026-10-14Proposal submission cutoff
NAICS & PSC236220 / Y1FBView NAICS Hub →
Set-Aside StatusNoneCompetition designation
⚡ Shred RFP & Draft Proposal with AI →View Authoritative Notice on SAM.gov ↗
PURSUIT QUALIFICATION BRIEF · NOTICE W912QR-27-McCoy-MPAF

Analyze Solicitation & Generate Compliant Proposal Draft

BidGovAI automatically analyzes Section C (Statement of Work), extracts Section L & M scoring criteria, and tailors a win-themed technical response.

Pursuit Fit Score88% MATCHBased on 236220 & None
RFP Shredder & Matrix

Extracts all Section L & M compliance requirements into a traceable response matrix in ~45 seconds.

FAR Clause Scanner

Detects flow-down clauses, limitation on subcontracting (52.219-14), and CMMC cybersecurity mandates.

Turnaround Acceleration

Cuts proposal production from 30+ manual hours to under 4 hours with tailored technical narratives.

⚡ Start 14-Day Free Trial — Shred this RFP Now →🔒 $0.00 due today • Includes full Solicitation Shredder, Compliance Matrix & 1-click proposal workspace

Contracting Officer & Buyer Contact Information

Official government points of contact registered for this procurement. Use for pre-proposal questions, capability statements, and formal inquiries.

Primary Contracting Officer
Bonny Dylewski
Contracting Officer

Contract Classification & Agency Hierarchy

DEPARTMENTDEPT OF DEFENSE
PLACE OF PERFORMANCE📍 Fort McCoy, WI, 54656, USA
PRODUCT SERVICE CODE (PSC)Y1FB
NAICS CODE236220 — Commercial and Institutional Building Construction
SET-ASIDE PROGRAMNone
Official Attachments: Download Solicitation Package & Attachments from SAM.gov ↗

Solicitation Statement of Work & Requirements

Scope of Work & Buyer Summary

***THIS POSTING HAS BEEN UPDATED TO ATTACH THE INDUSTRY DAY PRESENTATION & SIGN-IN SHEETS*** The U.S. Army Corps of Engineers is hosting an Industry Day/Pre-Solicitation Conference on Wednesday, 14 October 2026. The conference will offer a venue to provide information for an upcoming contracting opportunity, as well an opportunity for a Site Visit. This event is open to Large, Small and Socio-Economic Businesses who are registered in System for Award Management (SAM.gov) for the NAICS Code 236220 (Commercial and Institutional Building Construction). The Government is planning on issuing a construction solicitation for the design and construction of the Fort McCoy Multipurpose Athletic Field using the Design-Build-to-Budget delivery method. The Project Description is provided under the "Project Information” section of this announcement. This is not a Request for Proposal, an Invitation for Bid, or a Request for Quotation. Therefore, this event is not to be construed as a commitment by the Government to enter into a contract nor will the Government pay for information provided to the Government in a response nor pay for administrative costs incurred attending the Industry Day event. No reimbursement will be made for any costs associated with travel or providing information in response to this announcement. EVENT INFORMATION: Pre-Solicitation Conference Time: 9:00 a.m. Central Daylight Time (CDT) - Informational Meeting followed by Site Visit The Pre-Solicitation Conference informational presentation will be conducted on Wednesday, 14 October 2026 at the following location: (Building) 2113 South J Street, Fort McCoy, WI 54656-5148 – Classroom 133 Note: An aerial map is provided for reference under the "Attachments/Links" section of this announcement. Microsoft Teams (Virtual Participation): https://dod.teams.microsoft.us/meet/993484250583?p=GyrYlw9YrMGl2gaSOU Meeting ID: 993 484 250 583 Passcode: KB25c38S Dial in by phone: +1 601-262-2433, 317074905# United States, Vicksburg Phone conference ID: 317 074 905# Base Access All interested in-person attendees must provide the following information to the Sponsor/POC below no later than (NLT) Thursday, 08 October 2026 -- First Name, Last Name, and email address. SPONSOR/POC: Kyle Burwitz | [email protected] | (402) 660-6419 (NOTE: The Sponsor/POC provided is only to be contacted in reference to submitting required information for base access. He shall NOT be contacted with questions to obtain information concerning the project and the solicitation, which will be addressed at the Pre-Solicitation Conference.) Please bring a valid driver's license or valid photo ID for each person attending, vehicle registration and proof of insurance in the vehicle to gain access to the base. QUESTIONS: For questions regarding this announcement, please email [email protected] with the subject line "Fort McCoy Multipurpose Athletic Field – Industry Day". Please note that two (2) days following the conclusion of the Industry Day, this posting will be updated to include the Industry Day/Pre-Solicitation Conference Presentation. Please “follow” this announcement for any future updates. PROJECT INFORMATION: Multipurpose Athletic Field – Army Combat Fitness Testing This project utilizes a Design-Build-to-Budget delivery method to design and construct a new facility to contain a 54,600 SF multipurpose athletic field at Fort McCoy, Wisconsin. The facility shall consist of a 200 meter rubberized running track and an artificial turf infield (sized according to Army Techniques Publication (ATP) 7-22.01 Holistic Health and Fitness Training requirements) for completing the annual Army Fitness Testing (AFT). Supporting facilities include site development, modification to existing improvements, utilities and connections, lighting, paving, sidewalks, storm drainage, information systems, landscaping and signage. Consistent temperature control inside the facility shall be provided by self-contained systems. ATFP measures in accordance with the Department of Defense (DoD) Antiterrorism for Buildings will be provided. A life safety analysis of the facility shall be conducted to determine compliance with UFC, IBC, and NFPA codes and standards. A new addressable fire alarm system shall be installed in the facility that is compatible with the existing base fire alarm reporting system. Comprehensive building design services shall be required. Accessibility for individuals with disabilities shall be required. The multipurpose athletic field will be periodically occupied and shall require adequate clearance and circulation for personnel, maintenance and operations. Utility connections and telecommunications system(s)shall be coordinated. The facility shall be designed to a minimum life of 40 years and in accordance with DoD's Unified Facilities Criteria (UFC) 1-200-02 High Performance and Sustainable Building Requirements including energy efficiencies, building envelope, and integrated building systems performance. This is not a continuously used facility, and during periods of non-use utilities will be reduced or disconnected to conserve energy. PARTNERING WITH US: https://www.usace.army.mil/Business-With-Us/Partnering/

Ready to Respond to this Solicitation?

BidGovAI extracts all compliance criteria, flags dangerous contract clauses (FAR 52.219-14, CMMC, Buy American), and drafts win themes aligned directly with the evaluator.

Start Free 14-Day Trial — Analyze this Opportunity →