Analyze Solicitation & Generate Compliant Proposal Draft
BidGovAI automatically analyzes Section C (Statement of Work), extracts Section L & M scoring criteria, and tailors a win-themed technical response.
Extracts all Section L & M compliance requirements into a traceable response matrix in ~45 seconds.
Detects flow-down clauses, limitation on subcontracting (52.219-14), and CMMC cybersecurity mandates.
Cuts proposal production from 30+ manual hours to under 4 hours with tailored technical narratives.
Contracting Officer & Buyer Contact Information
Official government points of contact registered for this procurement. Use for pre-proposal questions, capability statements, and formal inquiries.
Contract Classification & Agency Hierarchy
Solicitation Statement of Work & Requirements
Scope of Work & Buyer Summary
The U.S. Army Corps of Engineers, Kansas City District is procuring a Multiple Award Task Order Contract (MATOC) for Environmental Remediation Services (ERS) in support of United States Army Corps of Engineers (USACE) Northwestern Division (NWD) and the Environmental Protection Agency (EPA) Region 2. The MATOC will be procured on a competitive basis as a total small business (SB) set-aside under North American Industry Classification System (NAICS) code 562910 Environmental Remediation Services. The scope of the SB ERS MATOC includes in-situ thermal remediation, in-situ chemical oxidation, and other chemical stabilization of contamination; operations and maintenance of remediation systems including large scale groundwater treatment plants, soil vapor extraction systems, and air sparge systems; preparation of work plans; studies with associated reports; multiple phases of field investigations; preliminary assessments; site inspections and remedial site inspections; remedial investigations; feasibility studies; Engineering Evaluation Cost Analysis; monitoring well installation and sampling; short and long term monitoring/long term operations or Long Term Response Action (LTRA); data management; data interpretation; engineering evaluation and corrective actions; optimization studies; ground-water modeling; geophysical surveys; remediation cost estimates; management of non-hazardous and hazardous investigative derived waste; environmental and human health risk assessments; risk based remediation; air emission issues including vapor intrusion; surface water discharge; applying for environmental permits; remedial design; well abandonment; meetings; public meeting participation; preparation of presentation material both written and visual; hydrological, sediment and soil studies; project reports; engineering support and/or design; value engineering studies; operations and maintenance for hazardous, toxic, and radioactive waste (HTRW) sites; energy evaluations for remediation systems; remedial action plans; remedial actions; removal action plans; removal actions; construction support; site closeout/decision documents; abandoned mines program support; and future project programming and scheduling support. The solicitation will be made available no earlier than 15 days after this presolicitation notice. All responsible sources may submit a proposal in response to the solicitation, which the government will consider in the award decision. This notice does not constitute a commitment on the part of the Government to award a contract, nor to pay for any costs incurred as a result in replying to this notice. This notice should not be construed as a commitment by the Government for any purpose.