SAM.GOV SOLICITATIONNONESources SoughtPSC R499

Ground Systems and Mission Operations-4 (GSMO-4)

Official federal contracting solicitation issued by NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA GODDARD SPACE FLIGHT CENTER).

Notice IDRFI-GSMO4-2027Official solicitation number
Response Deadline2026-10-26Proposal submission cutoff
NAICS & PSC541330 / R499View NAICS Hub →
Set-Aside StatusNONECompetition designation
⚡ Shred RFP & Draft Proposal with AI →View Authoritative Notice on SAM.gov ↗
PURSUIT QUALIFICATION BRIEF · NOTICE RFI-GSMO4-2027

Analyze Solicitation & Generate Compliant Proposal Draft

BidGovAI automatically analyzes Section C (Statement of Work), extracts Section L & M scoring criteria, and tailors a win-themed technical response.

Pursuit Fit Score88% MATCHBased on 541330 & NONE
RFP Shredder & Matrix

Extracts all Section L & M compliance requirements into a traceable response matrix in ~45 seconds.

FAR Clause Scanner

Detects flow-down clauses, limitation on subcontracting (52.219-14), and CMMC cybersecurity mandates.

Turnaround Acceleration

Cuts proposal production from 30+ manual hours to under 4 hours with tailored technical narratives.

⚡ Start 14-Day Free Trial — Shred this RFP Now →🔒 $0.00 due today • Includes full Solicitation Shredder, Compliance Matrix & 1-click proposal workspace

Contracting Officer & Buyer Contact Information

Official government points of contact registered for this procurement. Use for pre-proposal questions, capability statements, and formal inquiries.

Primary Contracting Officer
Daniel Han
Contracting Officer
Secondary Point of Contact / Specialist
Jerry Edmond
Contract Specialist
Contracting Office Physical Address: GREENBELT MD 20771, GREENBELT, MD, 20771, USA

Contract Classification & Agency Hierarchy

DEPARTMENTNATIONAL AERONAUTICS AND SPACE ADMINISTRATION
SUB-TIER / AGENCYNATIONAL AERONAUTICS AND SPACE ADMINISTRATION
MAJOR COMMANDNASA GODDARD SPACE FLIGHT CENTER
CONTRACTING OFFICENASA GODDARD SPACE FLIGHT CENTER
PLACE OF PERFORMANCE📍 USA
PRODUCT SERVICE CODE (PSC)R499 — Support — Professional: Other
NAICS CODE541330 — Engineering Services
SET-ASIDE PROGRAMNONE
INACTIVE / ARCHIVE DATE2026-11-10
Official Attachments: Download Solicitation Package & Attachments from SAM.gov ↗

Solicitation Statement of Work & Requirements

Scope of Work & Buyer Summary

This RFI is for informational purposes only. It is not a request for proposals or a solicitation for a contract or grant award and it does not obligate the Government in any way. The Government will not reimburse respondents for any costs associated with responding to this request. Introduction The National Aeronautics and Space Administration (NASA), Goddard Space Flight Center (GSFC) is seeking information from qualified vendors capable of supporting science and Earth science missions including, but not limited to: Earth Observing System; Earth Observing System Data and Operations System; Magnetospheric Multi-Scale mission; Global Precipitation Measurement mission; Lunar Reconnaissance Orbiter; James Webb Space Telescope; Fermi Gamma-ray Space Telescope; Geostationary Operational Environmental Satellites (built by NASA for the National Oceanic and Atmospheric Administration); Nancy Grace Roman Space Telescope; and Solar Dynamics Observatory. This RFI is intended to gather market intelligence, technical approaches, and rough-order-of-magnitude (ROM) considerations to inform a potential future procurement. Background The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) currently acquires mission operations support through the Goddard Space Mission Operations (GSMO‑3) contract. GSMO‑3 provides comprehensive, end‑to‑end mission operations services spanning the entire mission life cycle. The scope of work includes systems and facility engineering; launch and early‑orbit operations support; flight operations and flight dynamics services; sustaining engineering; and mission operations studies, design, integration, and testing of ground systems. Additional services include mission data collection and distribution, system administration, and information technology security and engineering analyses. The GSMO‑3 contract supports a broad portfolio of NASA science and Earth science missions, including the Earth Observing System (EOS), Magnetospheric Multi‑Scale (MMS), Global Precipitation Measurement (GPM), Lunar Reconnaissance Orbiter (LRO), James Webb Space Telescope (JWST), Fermi Gamma‑ray Space Telescope, Geostationary Operational Environmental Satellites (GOES), Nancy Grace Roman Space Telescope, and the Solar Dynamics Observatory (SDO). These services are essential to sustaining and advancing NASA’s ground data systems and mission operations infrastructure, ensuring reliable communication, data processing, and mission control capabilities for ongoing and future missions. The contract also supports mission decommissioning and long‑term sustaining engineering required to maintain operational readiness for systems with multidecade lifespans. The scope also increasingly encompasses cloud infrastructure management, continuous cybersecurity monitoring, DevSecOps automation, and advanced collision avoidance/conjunction assessment activities. Functions FUNCTION 1- Mission Ground System Support Services A. Ground Systems Engineering and Engineering Studies B. Ground Systems Support Services C. Ground Systems Integration and Test Services FUNCTION 2 - Mission Operations System Support Services A. Operations Systems Engineering B. Launch and Early Operations Support C. Flight Operations D. Flight Dynamics Support Services E. Mission Data Collection and Distribution F. Mission Systems Sustaining Engineering G. Systems Administration and IT Security H. Database Administration RFI Response Instructions The Government is seeking feedback from contractors with relevant mission capabilities and experience. Responses should include the vendor implementation approach and rough order magnitude costs of performing the functions listed below. Responses should be limited to no more than 30 pages . Transition from Cost-Plus-Award-Fee (CPAF) to Firm-Fixed-Price (FFP) The Government is evaluating the feasibility of transitioning the follow-on GSMO-4 requirement from a Cost-Plus-Award-Fee (CPAF) contract to a Firm-Fixed-Price (FFP) contract, either in whole or in part, including the use of Performance Based Payments for FFP Tasks. The Government seeks industry feedback regarding the practicality of such an approach. Specifically, respondents are requested to address the following: • Is the current GSMO-4 scope sufficiently defined and stable to support an FFP contract? If not, identify the areas of uncertainty. • What technical, programmatic, schedule, or cost risks would your organization associate with transitioning this requirement from CPAF to FFP? • Which portions of the requirement, if any, do you believe are well-suited for FFP, and which portions would be more appropriately performed under another contract type (e.g., Time-and-Materials)? Please explain your rationale. • What assumptions or Government-provided information (e.g., historical workload, staffing profiles, performance metrics, technical baseline, service level agreements, demand forecasts, configuration data) would be necessary for your organization to develop a realistic fixed-price proposal? • What contract incentives or performance metrics would improve the viability of an FFP approach? • What acquisition or contract structure would best balance cost control, performance, innovation, and risk allocation for this requirement? • Please identify any lessons learned or best practices from similar transitions from Cost-Reimbursement to Firm-Fixed-Price contracts. • Are there specific contract provisions or performance requirements that should be modified to enable a successful transition to FFP? • Catalog Pricing Structure: The Government is exploring a 'Catalog-style' pricing structure for routine Firm-Fixed-Price (FFP) operations, where missions are priced based on their Risk Classification (e.g., Class B, C, D). What are the benefits, risks, and potential cost-drivers your firm would associate with pricing mission operations by Class? What specific parameters, boundaries, or Service Level Agreements (SLAs) would be required in the catalog definitions to make this pricing model viable. • Core vs. IDIQ Structure: The Government is considering a contract structure that establishes highly stable, long-term flagship missions as the baseline 'Core' requirement, with all other missions and development efforts issued as IDIQ task orders. How would this Core-plus-IDIQ structure impact your pricing, workforce retention, and risk allocation strategies compared to a 100% IDIQ structure. Requirements/Specifications Available Government Furnished Equipment (GFE) Resources: The Government maintains operations resources listed below. RFI responses may include the use of these GFE resources. For any GFE resources incorporated in their response, the vendor should include any GSMO implementation costs and the cost differences/savings as compared to the vendor providing all ground resources.

Ready to Respond to this Solicitation?

BidGovAI extracts all compliance criteria, flags dangerous contract clauses (FAR 52.219-14, CMMC, Buy American), and drafts win themes aligned directly with the evaluator.

Start Free 14-Day Trial — Analyze this Opportunity →