SAM.GOV SOLICITATIONNoneCombined Synopsis/SolicitationPSC C222

SR Power Supplies Rack Detailed Design for ALS-U

Official federal contracting solicitation issued by DEPT OF DEFENSE.

Notice IDAA-2027-01Official solicitation number
Response Deadline2026-10-20Proposal submission cutoff
NAICS & PSC541330 / C222View NAICS Hub →
Set-Aside StatusNoneCompetition designation
⚡ Shred RFP & Draft Proposal with AI →View Authoritative Notice on SAM.gov ↗
PURSUIT QUALIFICATION BRIEF · NOTICE AA-2027-01

Analyze Solicitation & Generate Compliant Proposal Draft

BidGovAI automatically analyzes Section C (Statement of Work), extracts Section L & M scoring criteria, and tailors a win-themed technical response.

Pursuit Fit Score88% MATCHBased on 541330 & None
RFP Shredder & Matrix

Extracts all Section L & M compliance requirements into a traceable response matrix in ~45 seconds.

FAR Clause Scanner

Detects flow-down clauses, limitation on subcontracting (52.219-14), and CMMC cybersecurity mandates.

Turnaround Acceleration

Cuts proposal production from 30+ manual hours to under 4 hours with tailored technical narratives.

⚡ Start 14-Day Free Trial — Shred this RFP Now →🔒 $0.00 due today • Includes full Solicitation Shredder, Compliance Matrix & 1-click proposal workspace

Contracting Officer & Buyer Contact Information

Official government points of contact registered for this procurement. Use for pre-proposal questions, capability statements, and formal inquiries.

Primary Contracting Officer
Arielle Anoop
Contracting Officer

Contract Classification & Agency Hierarchy

DEPARTMENTDEPT OF DEFENSE
PLACE OF PERFORMANCE📍 Berkeley, CA, USA
PRODUCT SERVICE CODE (PSC)C222
NAICS CODE541330 — Engineering Services
SET-ASIDE PROGRAMNone
Official Attachments: Download Solicitation Package & Attachments from SAM.gov ↗

Solicitation Statement of Work & Requirements

Scope of Work & Buyer Summary

This RFP has been revised 10/12/26 to include a Questions & Clarifications (QA) document No. 5. All other terms and conditions of this RFP remain the same. ______________________________________________________________________ This RFP has been revised 10/8/26 to include (3) updated documents - SOW Rev. B, Sample Subcontract & ACL. A video recording of our 10/8/26 pre-proposal conference is also attached hereto. All other terms and conditions of this RFP remain the same. ______________________________________________________________________ LBNL will host an optional pre-proposal conference on 10/8/26 at 9AM PST where our Technical Team will walk through the SOW and clarify any information. Attendance is optional and will not be evaluated negatively against any submitted proposal. The conference is intended to be recorded and publicized after it concludes. Zoom Link to Join: https://lbnl.zoom.us/j/96572122335?pwd=bnvAr1SDfR0cMsTkh0ZnPYeLnAAseM.1 All other terms and conditions of this RFP remain the same. ______________________________________________________________________ This RFP has been revised 10/1/26 to extend the proposal due date until Monday October 19, 2026. All other terms and conditions of this RFP remain the same. ______________________________________________________________________ This RFP has been revised 9/25/26 to include a Questions & Clarifications (QA) document No. 4. All other terms and conditions of this RFP remain the same. ______________________________________________________________________ This RFP has been revised 9/23/26 to include a Questions & Clarifications (QA) document No. 3. All other terms and conditions of this RFP remain the same. ______________________________________________________________________ This RFP has been revised 9/22/26 to include a Questions & Clarifications (QA) document No. 2. All other terms and conditions of this RFP remain the same. ______________________________________________________________________ This RFP has been revised 9/20/26 to include a Questions & Clarifications (QA) document. All other terms and conditions of this RFP remain the same. ______________________________________________________________________ Dear Prospective Offeror, The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in Request for Proposal (RFP) No. AA-2027-01 for ALS-U ​Storage Ring Power Supplies Rack Designs. The RFP and associated documents (listed below) are attached hereto: 0. RFP and Proposal Preparation Instructions 1. ​ ​ Statement of Work; inclusive of all ​r​eferenced documents. Please view the following Google Drive for complete Technical documentation: https://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj 2. Sample Subcontract 3. ​ALS-U Quality Evaluation Survey (required with submission) ​4. ​​​Rep Cert Form (required with submission) Timeline of Events: Questions for Clarification - no later than ​S​eptember 24, 2026 Pre-Proposal Conference - Week of September 28, 2026, if necessary Submissions due - no later than ​October 2, 2026.

Ready to Respond to this Solicitation?

BidGovAI extracts all compliance criteria, flags dangerous contract clauses (FAR 52.219-14, CMMC, Buy American), and drafts win themes aligned directly with the evaluator.

Start Free 14-Day Trial — Analyze this Opportunity →