Building 510 Substation Upgrade - Phase I

Official federal contracting solicitation issued by DEPT OF DEFENSE.

Notice IDMH484019Official solicitation number
Response Deadline2026-10-23Proposal submission cutoff
NAICS & PSC238210 / Z2NZView NAICS Hub →
Set-Aside StatusNoneCompetition designation
⚡ Shred RFP & Draft Proposal with AI →View Authoritative Notice on SAM.gov ↗
PURSUIT QUALIFICATION BRIEF · NOTICE MH484019

Analyze Solicitation & Generate Compliant Proposal Draft

BidGovAI automatically analyzes Section C (Statement of Work), extracts Section L & M scoring criteria, and tailors a win-themed technical response.

Pursuit Fit Score88% MATCHBased on 238210 & None
RFP Shredder & Matrix

Extracts all Section L & M compliance requirements into a traceable response matrix in ~45 seconds.

FAR Clause Scanner

Detects flow-down clauses, limitation on subcontracting (52.219-14), and CMMC cybersecurity mandates.

Turnaround Acceleration

Cuts proposal production from 30+ manual hours to under 4 hours with tailored technical narratives.

⚡ Start 14-Day Free Trial — Shred this RFP Now →🔒 $0.00 due today • Includes full Solicitation Shredder, Compliance Matrix & 1-click proposal workspace

Contracting Officer & Buyer Contact Information

Official government points of contact registered for this procurement. Use for pre-proposal questions, capability statements, and formal inquiries.

Primary Contracting Officer
Megan Howard
Contracting Officer
Secondary Point of Contact / Specialist
Chad Wilson
Contract Specialist

Contract Classification & Agency Hierarchy

DEPARTMENTDEPT OF DEFENSE
PLACE OF PERFORMANCE📍 NY, 11973, USA
PRODUCT SERVICE CODE (PSC)Z2NZ
NAICS CODE238210
SET-ASIDE PROGRAMNone
Official Attachments: Download Solicitation Package & Attachments from SAM.gov ↗

Solicitation Statement of Work & Requirements

Scope of Work & Buyer Summary

Notice of Interest: BSA is seeking interested contractors capable of performing the work describled below and interested in receiving the forthcoming solicitation. The formal solicitation will be issued at a later date and will also be posted on SAM.gov at that time. Note that switchgear and transformers are being provided to the contractor as Government Furnished Equipment (GFE). Interested contractors are invited to submit a statement of interest along with a capabilities statement to BSA's Contract Specialist, Megan Howard, at [email protected]. Please include your Sam.gov Unique Entity Identifier (UEI). Project Description: The Physics Building was constructed in 1962 and much of the electrical system, original to the building, is beyond its useful life. These systems are also not compliant with current building codes, contain hazardous materials and need complete upgrades. The existing protective devices may not operate as specified, increasing the potential for arc-flash hazards and system damaging electrical faults. Repairs are cost prohibitive and may lead to extended unplanned outages in this mission critical facility. The Contractor shall provide all labor, supervision, materials (except as noted below), equipment, and services necessary for complete removal and upgrading of the existing Building 510 electrical substation equipment that feeds the newly replaced electrical distribution switchgear. This project includes the removal of two medium voltage substation transformers, one medium voltage oil switch and medium voltage distribution cabling. The project also includes the installation of a new exterior substation with two new medium voltage transformers, one pad mounted medium voltage switchgear and medium voltage feeders in a new concrete encased duct bank. The new substation will be constructed in the north-loading dock parking lot, complete with new transformer and switchgear pads, grounding and crushed stone. Long lead electrical equipment procurements are planned early in the project and construction of the substation infrastructure can be completed in parallel. Once the cutovers are completed the old transformers and oil switch will be removed from the equipment vault in the basement of Building 510. The Contractor shall not procure the switchgear or transformers under this contract. Installation will be executed in a phased approach in order to minimize electric service disruptions to the building and will provide provisions for future redundant circuit configuration.