SAM.GOV SOLICITATIONNoneSources SoughtPSC 5826

Repair, Spares, & Engineering Services Enterprise Contract Embedded Global Positioning System (GPS)/Inertial Navigation System (EGI)

Official federal contracting solicitation issued by DEPT OF DEFENSE.

Notice IDFA8524-27-D-0602Official solicitation number
Response Deadline2026-11-03Proposal submission cutoff
NAICS & PSC334511 / 5826View NAICS Hub →
Set-Aside StatusNoneCompetition designation
⚡ Shred RFP & Draft Proposal with AI →View Authoritative Notice on SAM.gov ↗
PURSUIT QUALIFICATION BRIEF · NOTICE FA8524-27-D-0602

Analyze Solicitation & Generate Compliant Proposal Draft

BidGovAI automatically analyzes Section C (Statement of Work), extracts Section L & M scoring criteria, and tailors a win-themed technical response.

Pursuit Fit Score88% MATCHBased on 334511 & None
RFP Shredder & Matrix

Extracts all Section L & M compliance requirements into a traceable response matrix in ~45 seconds.

FAR Clause Scanner

Detects flow-down clauses, limitation on subcontracting (52.219-14), and CMMC cybersecurity mandates.

Turnaround Acceleration

Cuts proposal production from 30+ manual hours to under 4 hours with tailored technical narratives.

⚡ Start 14-Day Free Trial — Shred this RFP Now →🔒 $0.00 due today • Includes full Solicitation Shredder, Compliance Matrix & 1-click proposal workspace

Contracting Officer & Buyer Contact Information

Official government points of contact registered for this procurement. Use for pre-proposal questions, capability statements, and formal inquiries.

Primary Contracting Officer
(PCO) Leigh Ann Taylor
Contracting Officer
Secondary Point of Contact / Specialist
Teresa Smith
Contract Specialist

Contract Classification & Agency Hierarchy

DEPARTMENTDEPT OF DEFENSE
PLACE OF PERFORMANCE📍 Warner Robins, GA, 31098, USA
PRODUCT SERVICE CODE (PSC)5826
NAICS CODE334511
SET-ASIDE PROGRAMNone
Official Attachments: Download Solicitation Package & Attachments from SAM.gov ↗

Solicitation Statement of Work & Requirements

Scope of Work & Buyer Summary

This follow-on effort is planned for a nine-year Period of Performance (PoP) spanning 10 September 2029 through 9 September 2038. The initial forecasted repair requirements are detailed in the attached RFI_Master List of NSNs, though the government reserves the right to modify specific NSN requirements in future correspondence. The government does not possess nor have rights to the technical data for these items. Furthermore, the government has designated these systems as commercial items. Prospective sources are advised that physical samples of these items are not available for evaluation. The contractor shall furnish all material, support equipment, tools, test equipment, and services. The contractor is responsible for providing, maintaining, and calibrating all support equipment required at their facility or a subcontractor’s facility. Contractor furnished material or parts used for replacement shall equal or exceed the quality of the original material or parts Contractors/Institutions responding to this RFI are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The government will not reimburse participants for any expenses associated with their participation in this survey.

Ready to Respond to this Solicitation?

BidGovAI extracts all compliance criteria, flags dangerous contract clauses (FAR 52.219-14, CMMC, Buy American), and drafts win themes aligned directly with the evaluator.

Start Free 14-Day Trial — Analyze this Opportunity →