Analyze Solicitation & Generate Compliant Proposal Draft
BidGovAI automatically analyzes Section C (Statement of Work), extracts Section L & M scoring criteria, and tailors a win-themed technical response.
Extracts all Section L & M compliance requirements into a traceable response matrix in ~45 seconds.
Detects flow-down clauses, limitation on subcontracting (52.219-14), and CMMC cybersecurity mandates.
Cuts proposal production from 30+ manual hours to under 4 hours with tailored technical narratives.
Contracting Officer & Buyer Contact Information
Official government points of contact registered for this procurement. Use for pre-proposal questions, capability statements, and formal inquiries.
Contract Classification & Agency Hierarchy
Solicitation Statement of Work & Requirements
Scope of Work & Buyer Summary
The Government intends to solicit from Small Business sources the ability to pick up, transport, and offload vehicles and equipment using a flatbed trailer configuration. The pickups will be at Arlington National Cemetery and the dropoffs / Unloads will be at the Defense Logistics Agency (DLA) Center located at Defense Supply Center Richmond, 6090 Strathmore Road, Bldg. 60C or Bldg 6C, Richmond, Virginia 23237. The typical trip is +/- 125 miles each way from Arlington National Cemetery (ANC) the Center. The responding entities shall be insured and maintain both Department of Transportation certifications as well as any state and local vehicular requirements. At this time this posting is not a formal solicitation nor does a respone by one of more entities constitute a competitive determination of such. Please provide a capability statement and a fully burdened hourly rate or rate per mile as an alternative as a rough order of magnitude and not an offical pricing proposal. No phone calls will be accepted. Please submit Request for Information not later than 11/23/2026 12:00PM Eastern Standard Time. RFI submitted after that will not be honored. Before responding to this solicitation please keep in mind that the Limitations of Subcontracting require the entity to perform 51% or more of the actual work. With this being said subcontracting opportunities do not exist and non-towing / hauling companies or expiditers and brokers need not respond.