Solicitation W912QR26PA077 for COOP House Furnace Replacement at West Fork Lake published by DEPT OF DEFENSE. Prospective offerors must consult official solicitation documents on SAM.gov for full instructions, specifications, and submission deadlines.
Active Federal Solicitations in Kentucky
30 Open NoticesThis scope of work includes replacing two (2) uninterruptible power supplies (UPS), and two (2) external battery packs at the locations identified below. Prices shall include mobilization & de-mobilization, fuel, labor, material, equipment, disposal, and all applicable permits and licenses required to replace the components identified below. Replace UPS at John T Myers Locks and Dam The contractor shall provide all means necessary to remove and discard existing nonfunctional UPS and install one (1) new UPS with associated equipment rack. Replace UPS at Newburgh Locks and Dam The contractor shall provide all means necessary to remove and discard existing nonfunctional UPS, and install one (1) new UPS with associated equipment rack.
Subject: Notice of Contract Award - STS TACH TIME1. Description of Supplies/Services: KYANG STS TACH TIME 30 HOURS2. Contracting Office: KYANG 1101 GRADE LANE, LOUISVILLE, KY. 402133. Awarded Contractor: WIN AVIATION4. Total Award Amount: $170,100.005. Award Date: 25 SEPT 2026
Solicitation W912QR26CA043 for McAlpine Locks and Dam Life Safety and Canal Entrance Sign Installation published by DEPT OF DEFENSE. Prospective offerors must consult official solicitation documents on SAM.gov for full instructions, specifications, and submission deadlines.
Solicitation W912QR-61034642 for FTC CDC Renovate B3069 published by DEPT OF DEFENSE. Contractors must submit responses conforming to the requirements in the official SAM.gov solicitation notice and associated attachments.
PROJECT TITLE: MCALPINE LOCK AND DAM CONTROL TOWER HVAC REPLACEMENT PROJECT LOCATION: MCALPINE LOCKS AND DAM, 805 NORTH 27TH STREET, LOUISVILLE, KY 40212 THE SCOPE OF WORK INCLUDES THE REMOVAL OF THE EXISTING 3-TON RESIDENTIAL CENTRAL HEAT PUMP SYSTEM, REPLACING IT WITH A NEW 3-TON SYSTEM, REPLACE THE EXISTING THERMOSTAT WITH A NEW PROGRAMMABLE THERMOSTAT, INSTALL NEW THERMOSTAT CONTROL WIRING FROM THE AIR HANDLER/FURNACE TO THE THERMOSTAT LOCATION. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE CODES, STANDARDS, AND MANUFACTURER’S RECOMMENDATIONS. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR, EQUIPMENT, MATERIALS, AND TOOLS TO COMPLETE THE WORK. PRICES SHOULD INCLUDE MOBILIZATION & DE-MOBILIZATION, FUEL, LABOR, MATERIAL AND EQUIPMENT. THIS PROCUREMENT IS 100% SET-ASIDE FOR SMALL BUSINESS UNDER NAICS 238220, SIZE STANDARD $19,000,000.00. IN LIEU OF BOTH PERFORMANCE AND PAYMENT BONDS, PER RFO 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (2000) AND RFO 28.102-1(B), ONLY A PAYMENT BOND OR IRREVOCABLE LETTER OF CREDIT IS REQUIRED.
Sources Sought Notice Sources Sought Notice Page 6 of 6 Sources Sought Notice *= Required Field Sources Sought Notice Page 1 of 6 Sources Sought Notice Courier Services Disclaimer: This Request for Information (RFI) is issued solely for market research information and planning purposes and does not constitute a solicitation. All information received in response to this RFI that is marked as proprietary will be handled accordingly. Responses to this notice are NOT offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this RFI. Information Requested from Industry: In response to the Sources Sought, interested Contractors shall submit the following information and any Capabilities/Qualifications Statement to include but not limited to an overview of proposed solution(s) and a description of the product your company possesses in accordance with the attached Statement of Work draft / Salient Characteristics List. Responses to market research table questionnaire shall be submitted. If this information is not provided, then it will be assumed the entire requirement cannot be met. Description of Requirement: The Department of Veterans Affairs, Veterans Health Administration (VHA), Network Contracting Office 19 (NCO 19) is conducting a market survey and is seeking potential sources for Hydronic Radiant Heating Panel Replacement at the Rocky Mountain Regional VA Medical Center. This Sources Sought Notice is issued for information and planning purposes only. This is not a solicitation or a request for proposal and shall not be construed as an obligation or commitment by the Government. An award will not be made on any offer submitted in response to this notice, and it shall not be implied that the Government is committed to providing any solicitation or award following this notice. The Government will not pay for any information received in response to this request, nor will the Government compensate a respondent for any costs incurred in developing the information provided. Requirement Services: Item No. Item Description 0001 vulcan hydronic panel radiator 0002 Hig pressure rating 0003 3/4 connections 0004 Labor See attached statement of work In response to this announcement, please provide the information requested below requested in this market research table questionnaire. If this information is not provided, then it will be assumed the entire requirement cannot be met: NAICS Code: Company Name: Address: UEI (Unique Entity ID) Number: Contact Name: Phone No.: Email: Business Size Information - Select all that applies: Small Business Emerging Small Business Small Disadvantaged Business Certified under Section 8(a) of the Small Business Act HUBZone Woman Owned Certified Service-Disabled Veteran Owned Small Veteran Owned Small Business Large Business FSS/GSA Contract Holder: Yes No FSS/GSA Contract Number: Effective Date/ Expiration Date: Proposed solution is listed and available on the above FSS/GSA Contract: Yes No Available pricing structure of proposed solution (select all that are applicable below, or remove to fit your requirement): Pricing Model Please Indicate Availability Below: (Yes / No / NA) All on FSS Open Market only Mix of FSS & Open Market Firm-Fixed Price Federal Acquisition Regulation (FAR) Market Rearch Questions: Buy American Act RFO 52.225-1 and RFO 52.225-2 Buy American Certificate What percentage of the proposed product (including leases and rentals) is a: Domestic end product? _____________ (%) Foreign end product? _______________ (%) Country of Origin: Questions for Small Businesses ONLY: Limitations on Subcontracting RFO 52.219-14 What percentage of the work would be subcontracted to another company? ________ What is the business size of the subcontractor?______ Per RFO 52.219-14 the following conditions must be met: Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract; Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract; If subcontracting, what added value do you offer (RFO 52.215-23): Nonmanufacturer Rule (RFO 52.219-33): Does your company manufacturer these proposed items? [Â ] yes [Â ] no Does your company exceed 500 employees? [Â ] yes [Â ] no If yes, list # of employees: _________ Does your company primarily engaged in the retail or wholesale trade and normally sells the type of item being supplied? [Â ] yes [Â ] no Does your company take ownership or possession of the item(s) with its personnel, equipment or facilities in a manner consistent with industry practice? [Â ] yes [Â ] no Does your company supply the end item of a small business manufacturer, processor or producer made in the United States, or obtains a waiver of such requirement pursuant to paragraph (b)(5) CFR 121.406. [Â ] yes [Â ] no If yes, what is the manufacturer s name? ________________ Response Instructions: Do not provide more than 8 pages, including cover letter page. Submit your response via email to [email protected] Submit your response NLT 14:00 (ET) on Friday, October 16, 2026; Mark your response as Proprietary Information if the information is considered business sensitive. VA has identified the appropriate North American Industry Classification System (NAICS) Code as 238220 Plumbing, Heating, and Air-Conditioning Contractors with a Small Business size of $19.0 Million or less. Please identify and explain any NAICS codes your company believes would better represent the predominant work included in the attached Statement of Work draft / Salient Characteristics List. (End of Sources Sought)
SOLID WASTE LANDFILL DISPOSAL SERVICES - FCI ASHLAND EFFECTIVE DATE OF AWARD: OCTOBER 01, 2026 ONE BASE OPTION YEAR WITH FOUR ADDITIONAL OPTION YEARS: $118,800.00
Solicitation W912P527PA001 for Wolf Creek Seasonal Supply of Liquid Oxygen published by DEPT OF DEFENSE. Contractors must submit responses conforming to the requirements in the official SAM.gov solicitation notice and associated attachments.
SOURCES SOUGHT NOTICE MILL SPRINGS NATIONAL CEMETERY GRAVESITE EXPANSION PROJECT NO. 861CM3012 This is a Sources Sought Notice for market research purposes only. This notice is not a solicitation, request for proposal, invitation for bid, or commitment by the Government. The Government will not reimburse respondents for any costs associated with responding to this notice. The Department of Veterans Affairs, National Cemetery Administration, is seeking Service-Disabled Veteran-Owned Small Business (SDVOSB) construction concerns capable of performing the Mill Springs National Cemetery Gravesite Expansion project in Nancy, Kentucky. The applicable North American Industry Classification System code is 237990, Other Heavy and Civil Engineering Construction. The construction magnitude is between $5,000,000 and $10,000,000. Project Summary The contractor shall provide all labor, materials, equipment, supervision, and other resources necessary to complete the gravesite expansion. The work includes approximately 834 double-depth pre-placed crypt burial sites and 657 in-ground cremation burial sites; site grading and earthwork; new roadways connecting to the existing road network; stormwater management infrastructure, including a new storm drain system and crypt underdrains; irrigation system expansion; flower watering stations and other site furnishings; sod and tree planting; and new and replacement cemetery signage, section markers, gravesite grid monuments, and related work. Response Requirements SDVOSB concerns interested in this requirement shall provide a brief response containing the following: • Company name, address, UEI, point of contact, telephone number, and email address. • Confirmation that the firm is an eligible SDVOSB concern under NAICS code 237990. • A positive statement that the firm intends to submit a bid or proposal if a solicitation is issued. • A brief description of one to three completed or substantially completed projects demonstrating relevant experience similar in scope and magnitude to this requirement. For each project, provide: • Project title and general scope; • Contract value; • Completion date or current status; and • Customer or agency. Responses shall be limited to three pages, including attachments. Marketing materials, brochures, and lengthy capability packages are not requested. Responses must be submitted by email to [email protected] no later than 11/05/2026. The email subject line shall state: Sources Sought Response – Mill Springs National Cemetery Gravesite Expansion – 861CM3012 The information received will be used solely to determine whether sufficient competition exists among eligible SDVOSB concerns. A response to this notice will not be considered an offer and will not be accepted by the Government to form a binding contract.
Solicitation 3KY0241 for Government awarded lease in Fort Mitchell, KY published by DEPT OF DEFENSE. Contractors must submit responses conforming to the requirements in the official SAM.gov solicitation notice and associated attachments.
Solicitation 15BRRC27D00000008 for Award Notice - Residential Reentry Services and Home Confinement Services within one of the following Kentucky Counties: Clay, Jackson, Laurel, Owsley, Perry, Leslie, Knox. published by DEPT OF DEFENSE. Contractors must submit responses conforming to the requirements in the official SAM.gov solicitation notice and associated attachments.
The United States Coast Guard has awarded a firm twenty (20) year lease contract for approximately 23,986 Usable Square Feet (USF) of contiguous commercial office space across Floors 11 and 12, along with 11 reserved/secure parking spaces located at 1930 Bishop Lane, Louisville, KY (Watterson Tower - Option B). The procurement was conducted utilizing competitive negotiation procedures pursuant to GSAM Part 570 / FAR Part 15. The award was made to the responsible offeror whose proposal conformed to the solicitation requirements, met all technical and operational agency criteria), and offered fair and reasonable pricing representing best value to the Government.
Louisville District Janitorial MATOC Contractors • Crico Enterprise, LLC - W912QR27DA001 • Greenfield International Corp - W912QR27DA002 • Reliance Contracting INC - W912QR27DA003 • Roku Management Consulting LLC - W912QR27DA004 • Yenrub Consulting Group, LLC - W912QR27DA005
Louisville District Janitorial MATOC Contractors • Crico Enterprise, LLC - W912QR27DA001 • Greenfield International Corp - W912QR27DA002 • Reliance Contracting INC - W912QR27DA003 • Roku Management Consulting LLC - W912QR27DA004 • Yenrub Consulting Group, LLC - W912QR27DA005
Louisville District Janitorial MATOC Contractors • Crico Enterprise, LLC - W912QR27DA001 • Greenfield International Corp - W912QR27DA002 • Reliance Contracting INC - W912QR27DA003 • Roku Management Consulting LLC - W912QR27DA004 • Yenrub Consulting Group, LLC - W912QR27DA005
Louisville District Janitorial MATOC Contractors • Crico Enterprise, LLC - W912QR27DA001 • Greenfield International Corp - W912QR27DA002 • Reliance Contracting INC - W912QR27DA003 • Roku Management Consulting LLC - W912QR27DA004 • Yenrub Consulting Group, LLC - W912QR27DA005
Louisville District Janitorial MATOC Contractors • Crico Enterprise, LLC - W912QR27DA001 • Greenfield International Corp - W912QR27DA002 • Reliance Contracting INC - W912QR27DA003 • Roku Management Consulting LLC - W912QR27DA004 • Yenrub Consulting Group, LLC - W912QR27DA005
Construction of the Barkley Elementary School Stairwells Replacement at Fort Campbell, KY. A market survey is being conducted to determine if there are a reasonable number of interested business concerns to determine any future set-asides for this project. If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business, Service-Disabled Veteran Owned Small Business, or Large Business and you are interested in this project please respond appropriately. The intent of this future solicitation will be to select one contractor for the design-bid-build construction of the Barkley Elementary School Stairwells Replacement at Fort Campbell, KY. Project Location: Fort Campbell, KY 37042 Project Description: Construction of four (4) 357 square foot exterior stairwells totaling 1,428 Square Feet at Barkley Elementary School at Ft. Campbell, KY. Barkley Elementary School has four exterior stairwells that have been damaged by snow removal salt. These stairwells are painted steel beams and steel pans (pans are concrete filled steps), that have rust damage. A recent project to sandblast and epoxy paint the steel portions of the stairwells was unsuccessful; severe rusting and degradation of the steel stairwells continued after the next salt placement for snow removal. Contract duration is estimated at 180 calendar days. In accordance with FAR 36.204, the estimated cost range is $500,000.00-$1,000,000. The NAICS code is 238190 - Other Foundation, Structure, and Building Exterior Contractors with a Size Standard of $19M. All interested Small Businesses, certified HUBZONE, 8A, Woman-Owned Small Businesses, and Service-Disabled Veteran Owned Small Business contractors should respond to this survey via the Microsoft Forms link NLT 30 November 2026 by 11:00 AM Eastern Time. This project will be solicitated as a single-phase design-bid-build project. Responses should include: 1. Identification and verification of the company’s small business status. 2. Contractor’s Unique Identifier Number and CAGE Code(s). 3. Documentation from the firm’s bonding company showing current single and aggregate performance and payment bond limits. 4. Descriptions of Experience – Interested construction firms must provide no more than three (3) example projects with greater than 95 percent completion or projects completed in the past five (5) years in which the interested firm served as the prime contractor. Example projects must be of similar size and scope to be considered. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference that may be contacted to verify project size, scope, dollar value, self-performance percentage, percent complete, and quality of performance.. a. Projects considered similar in scope to this project would include Steel fabrication and erection above single-story height or similar exterior stairwell replacement or new installation. b. Projects considered similar in size to this project would include: Steel Fabrication over 800 sq. ft.. c. Based on the information above, for each project submitted, include: 1. Current percentage of construction complete and the date when it was or will be completed. 2. Scope of the project. 3. Size of the project. 5. The dollar value of the construction contract and whether it was design-bid build, design-build or design-build to budget. 6. The percentage of work that was self-performed as project and/or construction management services or physical construction type work. 7. Identify the number of subcontractors by construction trade utilized for each project. 8. Documentation from the firm’s bonding company showing current single and aggregate performance and payment bond limits. 9. Small Businesses are reminded under RFO 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished. Submission Requirement: The only authorized transmission method of responses is via filling out the survey form. No other transmission method will be accepted. Please limit your capability statement to the space provided within the form. The Market Survey Form can be accessed at https://forms.osi.apps.mil/Pages/DesignPageV2.aspx?origin=ShareFormPage&subpage=design&m2=1&id=unZN_HzxUEy5p48xY9J1gs_kFZkiSvdBsl16R5WGbRZUM1Q5TFhIVElUWFJDNDBOMFdSNFBDTEVLSS4u or via the QR Code provided below: This is NOT a Request for Proposal and does not constitute any commitment by the Government. Responses to this sources sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately for responses to this market survey. NOTICE: The following information is provided for situational awareness and is not required to respond to this Sources Sought. All contractors must be registered in the System for Award Management (www.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from http://www.SAM.gov. Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg. Please begin the registration process immediately to avoid delay of the contract award should your firm be selected. ALERT: You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration. Effective 29 June 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM. Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM. To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).
Construction of the Barkley Elementary School Stairwells Replacement at Fort Campbell, KY. A market survey is being conducted to determine if there are a reasonable number of interested business concerns to determine any future set-asides for this project. If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business, Service-Disabled Veteran Owned Small Business, or Large Business and you are interested in this project please respond appropriately. The intent of this future solicitation will be to select one contractor for the design-bid-build construction of the Barkley Elementary School Stairwells Replacement at Fort Campbell, KY. Project Location: Fort Campbell, KY 37042 Project Description: Construction of four (4) 357 square foot exterior stairwells totaling 1,428 Square Feet at Barkley Elementary School at Ft. Campbell, KY. Barkley Elementary School has four exterior stairwells that have been damaged by snow removal salt. These stairwells are painted steel beams and steel pans (pans are concrete filled steps), that have rust damage. A recent project to sandblast and epoxy paint the steel portions of the stairwells was unsuccessful; severe rusting and degradation of the steel stairwells continued after the next salt placement for snow removal. Contract duration is estimated at 180 calendar days. In accordance with FAR 36.204, the estimated cost range is $500,000.00-$1,000,000. The NAICS code is 238190 - Other Foundation, Structure, and Building Exterior Contractors with a Size Standard of $19M. All interested Small Businesses, certified HUBZONE, 8A, Woman-Owned Small Businesses, and Service-Disabled Veteran Owned Small Business contractors should respond to this survey via the Microsoft Forms link NLT 30 November 2026 by 11:00 AM Eastern Time. This project will be solicitated as a single-phase design-bid-build project. Responses should include: 1. Identification and verification of the company’s small business status. 2. Contractor’s Unique Identifier Number and CAGE Code(s). 3. Documentation from the firm’s bonding company showing current single and aggregate performance and payment bond limits. 4. Descriptions of Experience – Interested construction firms must provide no more than three (3) example projects with greater than 95 percent completion or projects completed in the past five (5) years in which the interested firm served as the prime contractor. Example projects must be of similar size and scope to be considered. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference that may be contacted to verify project size, scope, dollar value, self-performance percentage, percent complete, and quality of performance.. a. Projects considered similar in scope to this project would include Steel fabrication and erection above single-story height or similar exterior stairwell replacement or new installation. b. Projects considered similar in size to this project would include: Steel Fabrication over 800 sq. ft.. c. Based on the information above, for each project submitted, include: 1. Current percentage of construction complete and the date when it was or will be completed. 2. Scope of the project. 3. Size of the project. 5. The dollar value of the construction contract and whether it was design-bid build, design-build or design-build to budget. 6. The percentage of work that was self-performed as project and/or construction management services or physical construction type work. 7. Identify the number of subcontractors by construction trade utilized for each project. 8. Documentation from the firm’s bonding company showing current single and aggregate performance and payment bond limits. 9. Small Businesses are reminded under RFO 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished. Submission Requirement: The only authorized transmission method of responses is via filling out the survey form. No other transmission method will be accepted. Please limit your capability statement to the space provided within the form. The Market Survey Form can be accessed at https://forms.osi.apps.mil/Pages/DesignPageV2.aspx?origin=ShareFormPage&subpage=design&m2=1&id=unZN_HzxUEy5p48xY9J1gs_kFZkiSvdBsl16R5WGbRZUM1Q5TFhIVElUWFJDNDBOMFdSNFBDTEVLSS4u or via the QR Code provided below: This is NOT a Request for Proposal and does not constitute any commitment by the Government. Responses to this sources sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately for responses to this market survey. NOTICE: The following information is provided for situational awareness and is not required to respond to this Sources Sought. All contractors must be registered in the System for Award Management (www.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from http://www.SAM.gov. Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg. Please begin the registration process immediately to avoid delay of the contract award should your firm be selected. ALERT: You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration. Effective 29 June 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM. Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM. To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).
The Department of Veterans Affairs, Network Contracting Office 9, anticipates issuing a competitive solicitation for medical courier services supporting the Robley Rex VA Medical Center in Louisville, Kentucky, its associated Community-Based Outpatient Clinics (CBOCs), and other Government-designated locations. The contractor shall furnish all personnel, vehicles, equipment, supervision, and resources necessary to provide scheduled, supplemental, and on-demand courier services, including 24-hour, seven-day-per-week STAT/emergency services. Services include the pickup, transportation, and delivery of laboratory specimens, pharmaceuticals, medical records, medical supplies, interoffice mail, and other authorized Government materials. The Government anticipates awarding a single, firm-fixed-price requirements contract with a three-year ordering period. This acquisition will be conducted in accordance with FAR Part 12, Acquisition of Commercial Products and Commercial Services, and is anticipated to be set aside 100% for SBA-certified SDVOSBs. The solicitation, including the Performance Work Statement, pricing schedule, submission requirements, evaluation criteria, and award methodology, will be made available on SAM.gov upon issuance. Anticipated Solicitation Release Date: Early to Mid-November 2026. Interested parties are responsible for monitoring SAM.gov for the solicitation and any amendments. This notice is for informational purposes only and does not constitute a solicitation. No bids, quotations, or proposals are being requested or accepted at this time.
The Contractor shall provide YT706 lifecycle support services. Services include program support; engineering and technical support, including Quality Deficiency Report (QDR) and warranty support; technical-publication source-data updates; and Field Service Representative (FSR) support. The Contractor shall provide all personnel, management, facilities, equipment, and other resources necessary to perform YT706 Llifecycle support services. This is a commercial requirement, FAR 12 procedures will be utilized. Anticipated period of performance is 1 year plus two option periods. No Request for Quote will be issued, Interested vendors should contract indivifuals listed for additional information.
This amendment is to address typographical errors regarding offer due date and the site visit information on RFQ 36C24927Q0038 page 2, replaced entirely below: Offer due date: 11/30/2026 @11:00am CT Site visits are scheduled on Monday 11/16/2026 at 08:30am ET for the Lexington Sousley Campus 2250 Leestown Road, Lexington, KY 40511, Bldg. 20 and Tuesday 11/17/2026 at 08:30 AM ET for the Lexington Troy Bowling Campus, 1101 Veterans Dr., Lexington, KY 40502 in the main lobby. No other changes are made at this time.
Vendors will find requirement details and shall submit quotes through UNISON; no bids outside UNISON will be acknowledged or accepted. The link to relevant solicitation on UNISON is provided in the Attachments block.
This amendment is to publish Questions and Answers as submitted in accordance with instruction on RFQ 36C24927Q0038 and also to extend the offer due date: 12/03/2026 @ 11:00 (CT). No other changes are made at this time. Questions and Answers Q.1. Page 1 of the solicitation lists November 30, 2027, at 11:00 AM CST, which is also the deadline currently displayed on SAM.gov. However, page 20 of the solicitation states November 30, 2026, at 11:00 AM CT. Could you please confirm the correct quote submission deadline? A.1. See Amendment 36C24927Q0038_0001, offer due date corrected. The date and time shown on page 1 are system-generated, the solicitation deadline remains 11:00 a.m. local time for the contracting office in Murfreesboro, Tennessee. Currently (in November), CT (Central Time) or CST (Central Standard Time) are both used, but CST is technically accurate right now because Daylight Saving Time ended in early November, putting the region on Central Standard Time. The offer due date and time is 10/30/2026 @11:00 CT. Q.2. VAAR 852.219-75 is incorporated by reference, and the requirement is solicited under NAICS 238210. Please confirm which limitation on subcontracting applies to this award: services at 50 percent, or special trade construction contractors at 75 percent. Please also confirm whether the signed certificate is to be returned with the quote. A.2. Yes, the clause is included and will be included in the order in full text for completion prior to award. Q.3. For the technical subfactors and for past performance, please confirm whether the Government will consider the personnel, certifications, experience, references and prior studies of a proposed first-tier subcontractor together with those of the prime. A.3. Submit the information in detail as “prime” or subcontractor. FAPIIS (Federal Awardee Performance and Integrity Information System) reports will be evaluated. Q.4. Please confirm that attendance at the November 16 and 17 site visits is optional and is not a condition of submitting a quote. A.4. Attendance is optional. Q.5. Line item 1002 covers emergency repair work if circuits cannot be energized after inspection. Please advise the pricing basis the Government wants for this line item, for example a not-to-exceed amount set by the Government, hourly rates with an estimated quantity, or a single lump sum, so that all quotes are priced on the same basis. A.5. CLIN 1002 provides an estimated amount for emergency repair funding. If emergency repairs become necessary, all repair costs and funding must be approved by the Station and the Contracting Officer (CO) before work is performed. Although the total cost of such repairs cannot be determined in advance, including this CLIN and associated funding is necessary because the Statement of Work (SOW) requires the Contractor to perform emergency repairs when needed and supports the award of the contract. Q.6. Please confirm whether the Government will accept a partial invoice after acceptance of field testing at each campus and a final invoice after acceptance of the studies and final report. A.6. Invoicing is in arrears, no partial invoices are to be accepted prior to all work is completed and final acceptance. Q.7. We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number? A.7. This is a new requirement, although this study is completed triennially the contract does not have any options. Q.8. Can our references be for work our owner performed or managed while at a prior employer? A.8. No employee references are requested. The vendors Past performance is requested. Q.9. Is a Kentucky electrical license required, or will licenses from another state work? A.9. Need to have a master electrician on shift while work is being performed. Kentucky license is required. Q.10. SOW Section 7 calls for oil and coolant samples on "three existing generators." The attachments show at least three at Bowling and six at Sousley. Which three are included? A.10. The VA requests oil and coolant samples on all generators. Q.11. SOW Section 6, item k says emergency repairs are paid by change order or separate PO. What should we put in CLIN 1002? Is connector replacement found during the IR scan in the base price? A.11. See A.5 for CLIN 1002. Yes, connector replacement found during the IR scan is part of the base scope. SOW Section 7 (Infra-Red Scanning) says problem connections shall be replaced with new connectors and/or tightened to the manufacturer's specifications. Q.12. Who approves the consultant for the short-circuit, coordination and arc flash studies, and when? A.12. Technical review by the COR/Engineering Service, will approve the consultant as part of the technical acceptability evaluation. Q.13. SOW Section 6, item h asks for every worker's OEM training documents at the time of offer. With the 5-file, 8 MB limit, can we send a summary with the quote and the full documents before work starts? A.13. SOW Section 6, item h requires OEM training documentation to be submitted at the time of offer. Per SOW Section 2, NFPA 70E qualified person certifications shall be submitted to the Contracting Officer before work begins. Q.14. Is the 4-hour test date set? A.14. TBD Q.15. Will the site visit sign-in sheets and minutes be posted? A.15. No notes or sign in sheet will be posted. Q.16. Scope – Panelboards - SOW Section 3 lists "Distribution Panels" among the equipment to be maintained and tested, while the Equipment List paragraph applies the procedures to all equipment in the attached electrical studies, which include several hundred branch panelboards. Is hands-on maintenance and testing (e.g., torque verification, breaker testing) required on every branch panelboard, or is an energized infrared scan and visual inspection sufficient for branch panelboards, with full testing limited to distribution panels? A.16. Full maintenance and testing in accordance with SOW Section 7 and NETA MTS, including breaker testing and connection torque verification, is required for the switchboards and distribution panels listed in SOW Section 3. For branch panelboards the required scope is an energized infrared scan, a visual inspection and exercising of the breakers. Branch-panel connections or breakers with thermal anomalies or visual defects shall be investigated and corrected per SOW Section 7 (Infra-Red Scanning). Routine de-energized torque verification and breaker testing are not required on every branch panelboard. Q.17. Scope – Panelboards - The Infra-Red Scanning section references bus plugs, panelboards, MCCs and transformers in the Main, Tower and Chiller buildings. Does the infrared scan also apply to the panelboards in the Sousley Division buildings? A.17.Yes it does. Q.18 . Scope – Equipment Inventory - The SOW references a Government-furnished inventory of equipment to be maintained, inspected and tested. Is there an inventory beyond the arc flash study data files and 2023 test reports attached to the RFQ? If so, can it be provided? A.18. The SOW lists a Government-furnished inventory as an attachment. Per the SOW Equipment List paragraph, any equipment in the facility that is not shown in the attached studies shall also be tested and maintained. Mark its information and location on a hard copy of the studies and turn it in with the report. Q.19. Scope – Equipment Inventory - The 2023 test reports include medium-voltage equipment not shown in the arc flash study data files (for example, Bowling Tower and Main Hospital transformers T2–T6, MV switches T1–T4 and network protectors, and the Sousley Building 68 medium-voltage switchgear). Please confirm this equipment is included in both the maintenance/testing scope and the arc flash and coordination study. A.19. Yes. SOW Section 3 includes medium-voltage switches, medium-voltage circuit breakers, liquid-filled transformers and switchgear. The Equipment List paragraph requires testing of equipment that exists in the facility even if it is not shown in the attached studies. The arc flash study covers high- and low-voltage systems, with field-verified data, for the Bowling Chiller, Main and Tower buildings and all Sousley buildings. The short circuit and coordination study covers each protective device back to the utility and generator sources. Q.20. Scope – Generators and Transfer Switches - The Power Generators section calls for oil and coolant sample testing of "the three existing generators." The study data shows generators serving multiple buildings at both divisions. Please identify the three generators (division, building and unit ID) included in this requirement. A.20. The Va requests oil and coolant samples on all generators. Q.21. Scope – Generators and Transfer Switches - The SOW requires ASCO transfer switches to be tested and maintained by ASCO technicians. Can the VA provide a list of the ASCO units at each division? A.21. The majority of ATS on both campuses are from ASCO. Q.22. Schedule and Deliverables - Normal working hours are listed as 7:00 AM–4:30 PM ET in SOW Section 5 and 8:00 AM–4:30 PM ET in the Work Hours section. Please confirm which applies. A.22. 7:30 AM–4:30 PM is normal business hours. Outages should occur after hours. Q.23. Schedule and Deliverables - The general test report calls for four (4) hard copies, while the arc flash study report calls for three (3). Please confirm the required number of hard copies for each deliverable. A.23. These are separate deliverables. Maintenance and testing report: one (1) hard copy to the Contracting Officer, plus software copy, four (4) hard copies and one (1) CD-ROM/DVD (Microsoft Word) to the Chief of Engineering Service, within seven (7) calendar days. Arc flash study report: software copy, three (3) hard copies and one (1) electronic copy on CD or DVD. Protective device study certification: four (4) copies to the Resident Engineer two weeks before final inspection. Q.24. Evaluation - Section (ix) describes a Lowest Price Technically Acceptable process, while other language references best value and price and other factors considered (FAR 12.204). Please confirm which evaluation method will be used. A.24. "Best Value" is not an evaluation method used under Simplified Acquisition Procedures. For this acquisition, award will be made using the Lowest Price Technically Acceptable (LPTA) methodology. “Best value” is a general procurement concept that means the Government seeks the proposal that provides the greatest overall benefit in accordance with the requirements and evaluation criteria established in the solicitation. Under FAR Part 12 Simplified Acquisition Procedures, proposals are evaluated as either technically acceptable or unacceptable. Once a proposal is determined to be technically acceptable, additional technical superiority generally does not provide added value in the evaluation. As a result, award is made to the lowest-priced, technically acceptable offeror. I believe the confusion may stem from the term "Best Value Tradeoff" found in FAR / RFO Part 15. Which does not apply to this acquisition. Q.25. The Statement of Work lists a Government-furnished inventory of electrical equipment. Can the inventory or equipment counts by campus be provided to quoters? A.25. See A.18. The SOW does not give equipment counts by campus. Q.26. Price Schedule line 1001 lists only the Bowling Campus, but the Statement of Work covers Bowling and Sousley. Please confirm both campuses are included, and whether they should be priced as one line or separately. A.26. Yes, SOW Section 1 covers both the Bowling Campus and the Sousley Campus. Q.27. Line 1002 (emergency repair) states additional payment is by change order. May quoters price this line as hourly rates? A.27 See A.5 Q.28. The Statement of Work makes the contractor responsible for utility company costs for the 4-hour EES test and fees for main feeder outages. Can the Government share estimated or historical utility charges for these? A.28. The Government does not have historical utility charge data available for release. Offerors are responsible for coordinating with the utility company (KU) to determine applicable charges and must include all utility costs in their pricing, as required by the SOW. Q.29. Section 7 requires UL 96A certification where lightning protection systems exist. Which buildings at each campus have lightning protection systems? A.29. Building 39, 1, CLCs (201, 202, 204, 205), and Building 67 chiller plant at the Sousley Campus. Main and Tower Buildings at the troy bowling campus., Contractor to confirm. Q.30. The protective device study must be prepared by the 15 kV switchgear manufacturer or an “approved consultant.” What is the approval process, and will a PE-stamped study from a qualified engineering firm be accepted? A.30. Yes. A study prepared by a qualified independent engineering firm is acceptable in lieu of the 15 kV switchgear manufacturer, provided the study is prepared under the supervision of, and sealed by, a licensed Professional Engineer (electrical). To obtain approval, submit the following with the offer: the firm name, the responsible PE's name and license, the software to be used, and at least two references for comparable short circuit, coordination and arc flash studies completed within the past [5] years. The Contracting Officer, with input from the COR/Engineering Service, will review the submission as part of the technical acceptability evaluation. The final study shall bear the PE seal and meet all requirements of the SOW.. Q.31. The label requirements cite ANSI Z535.4-2002 and a prohibited approach distance. May labels follow current NFPA 70E, IEEE 1584-2018, and current ANSI Z535.4? A.31. Yes Q.32. The report deliverables say 4 hard copies in one section and 3 in another. Please confirm the count, and whether a USB drive is acceptable in place of CD/DVD. A.32. See A.23. The SOW specifies the electronic copy on CD-ROM or DVD. Can also send a file share link to download as long as the VA can access the files. Q.33. Will the Government accept a schedule with field work concentrated in January and February, finishing by 3/1/2027? A.33. Per SOW Section 6, all maintenance shall be completed within 90 calendar days of the contract start date. The proposed schedule submitted with the quote will be reviewed by VAMC Engineering Service, and the Contractor shall incorporate any adjustments. Outages must be scheduled at least 2 weeks in advance and done during off-hours or weekends. The VA would like to complete all outages before 3/1/27 if possible. Q.34. Will site visit sign-in sheets or notes be provided? A.34 See A.15. Q.35. In the Sousley Campus documentation, there are arc flash study data files in PDF format and there are arc flash study one-lines. o Is the arc flash study final report available? A.35. Yes it is uploaded. o Is the arc flash study software model available? A.35. Not available. o Does the VA want to own the software model for the 2027 study update? A.35. Per the SOW Records Management Obligations, LVAHCS owns the rights to all data produced under this contract. The VA would like to request a copy. Q.36. In the Sousley Campus documentation, there is a one-line of CLC Phase 2. Is this the only change since the last arc flash study? A.36. Building 39 was updated around the time of the last study. At the bowling campus Tower critical ATS has been updated. 3 ATS serving the tower elevators have been replaced. There could be some other changes as well. Q.37. In the Sousley Campus documentation, there is a maintenance report: o Have any of the recommendations from the report been implemented? A.37. Some have been implemented, contractor to confirm. Panel 2 main switchboard has been replaced. Main Vault building 3 electrical room has been replaced and has conditioned air. Main Vault B29 has been corrected. Has a new split unit. Buildings 2,3, 22, 25 switchgears have been replaced. PMT-75 has been repaired. o Should this report be used as a guideline for the scope of the maintenance this cycle? A.37. Maintenance scope is defined by SOW Sections 3 and 7 and the latest edition of the NETA Maintenance Testing Specifications. o The report includes a lot of additional information: white papers, instruction manuals, technical articles, etc. Are those expected in the new report? A.37. SOW Section 4 requires reference materials, such as manufacturer's specifications and the coordination study, in both the hard copy and electronic reports. White papers and technical articles are required when applicable. o It appears that the low voltage circuit breaker trip units/devices were tested via primary current injection testing. Will primary current injection testing be required? A.37. Yes, SOW Section 7 requires a high-current test and calibration to the manufacturer's time-current characteristic curves for switchgear and distribution circuit breakers. Primary current injection testing is required for all low-voltage power circuit breakers and for molded case circuit breakers rated [225] Amp and above in switchboards and distribution panels. Breakers with electronic trip units may be tested by secondary injection where the manufacturer provides a test port, with primary injection used to verify the CT/sensor path. Motor circuit protectors shall be tested only per the manufacturer's recommendations. o Assuming primary current injection testing will be required, will the VA provide a power source for the test set (480V, single-phase, 60A or higher), or will we need to provide a generator to power the test set? A.37. Per SOW Sections 5 and 6.i, the Contractor shall provide all tools, instruments and equipment. The VA will not furnish tools or equipment for the inspections. Q.38. For the Sousley Campus, when is the maintenance expected to be done – starting month, days of the week, hours onsite per day, day shift or night shift? A.38. The SOW does not set a starting month. Per SOW Sections 5 and 6, most work will be done at night and after normal working hours. All power outages shall be on off-hours or weekends, and some non-disruptive work may be approved during normal hours by the COR. All work and outages must be scheduled with the COR at least 2 weeks in advance and finished within 90 calendar days of the contract start date. Q.39. For the Bowling Campus, all the same questions above apply. In addition, it was mentioned that 5-10 LV transformers have been added since the last arc flash study. Is that all that is expected to be different since the last study? A.39. See A.37 and A.38. Per the SOW Equipment List paragraph, any equipment not shown in the attached studies shall be tested and maintained. Mark its information and location on a hard copy of the studies and turn it in with the report. Q.40. Who is responsible for ATS and Generator testing? Is that part of the maintenance scope, or were those reports included in the documentation just for informational purposes? A.40. The Contractor. Engine generators and automatic transfer switches are listed in SOW Section 3 as equipment to be maintained and tested. SOW Section 7 includes oil and coolant sample testing of the three existing generators and full transfer switch testing. ASCO transfer switches must be tested and maintained by ASCO technicians. Q.41. The reports from the successful bidder 3 years ago seem very thorough and professional. Why would the VA want to go with someone else this time? A. 41. There is no justification for a Sole Source Acquisition. Q.42 Can we get a bid extension? A.42. Yes, I will revise the closing date and time to 12/03/2026 @11:00 AM (CT).
The Blue Grass Army Depot, CCRI-MII-B Depot Support Branch/Munitions and Industrial Base Directorate Army Contracting Command - Rock Island intends to establish a Blanket Purchase Agreement (BPA) under the modernized authority of the Revolutionary Federal Acquisition Regulation Overhaul (RFO), specifically leveraging RFO 12.201-1(e)(3) and Class Deviation RFO-2025-16. The BPA will facilitate the streamlined, repetitive procurement of services to perform diagnostic troubleshooting, emergency and routine repairs, preventative maintenance, software programming, and operator/programmer training and parts if needed for CNC machines with an average age of 15 to 20 years old for covered systems that include: CNC Machinery: 3 Axis CNC Mill, 2 or 3 axis CNC Lathe, 5 Axis CNC Lathe Robotic Motion Systems & Controllers: FANUC Robots (M-20iA, R-2000iB); FANUC Controllers (M-20iA, R-30iA). Programmable Logic Controllers (PLCs): Allen-Bradley, Mitsubishi, Siemens (all variants utilizing industrial ladder/logic software). This combined synopsis and solicitation serves as the official public notice of the Government's intent to establish a BPA. The primary objective is to create a flexible “charge account” with a qualified, responsible source to fulfill anticipated repetitive needs efficiently. This requirement utilizes the North American Industry Classification System Code (NAICS) 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance with a size standard of $12.5 Million. This BPA shall not obligate any funds. A BPA is not a Contract. In accordance with FAR 12.201-1-3(e)(3)(iv)(B), the Government is obligated only to the extent of authorized purchases made via properly executed BPA Call Orders made under the BPA. The BPA Master Limit is $750,000. No single BPA Call Order shall exceed $250,000 in total cost. Please note, there is no guarantee that any or all requirements for the services described herein will be issued using an established BPA. The full details and applicable provisions and clauses are available in the attachments of this notice.
The Blue Grass Army Depot, CCRI-MII-B Depot Support Branch/Munitions and Industrial Base Directorate Army Contracting Command - Rock Island intends to establish a Blanket Purchase Agreement (BPA) under the modernized authority of the Revolutionary Federal Acquisition Regulation Overhaul (RFO), specifically leveraging RFO 12.201-1(e)(3) and Class Deviation RFO-2025-16. The BPA will facilitate the streamlined, repetitive procurement of services to perform diagnostic troubleshooting, emergency and routine repairs, preventative maintenance, software programming, and operator/programmer training and parts if needed for CNC machines with an average age of 15 to 20 years old for covered systems that include: CNC Machinery: 3 Axis CNC Mill, 2 or 3 axis CNC Lathe, 5 Axis CNC Lathe Robotic Motion Systems & Controllers: FANUC Robots (M-20iA, R-2000iB); FANUC Controllers (M-20iA, R-30iA). Programmable Logic Controllers (PLCs): Allen-Bradley, Mitsubishi, Siemens (all variants utilizing industrial ladder/logic software). This combined synopsis and solicitation serves as the official public notice of the Government's intent to establish a BPA. The primary objective is to create a flexible “charge account” with a qualified, responsible source to fulfill anticipated repetitive needs efficiently. This requirement utilizes the North American Industry Classification System Code (NAICS) 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance with a size standard of $12.5 Million. This BPA shall not obligate any funds. A BPA is not a Contract. In accordance with FAR 12.201-1-3(e)(3)(iv)(B), the Government is obligated only to the extent of authorized purchases made via properly executed BPA Call Orders made under the BPA. The BPA Master Limit is $750,000. No single BPA Call Order shall exceed $250,000 in total cost. Please note, there is no guarantee that any or all requirements for the services described herein will be issued using an established BPA. The full details and applicable provisions and clauses are available in the attachments of this notice.
SOURCES SOUGHT / REQUEST FOR INFORMATION (RFI) MARKET RESEARCH FOR WOLF CREEK POWERHOUSE BRIDGE CRANE REHABILITATION DISCLAIMER: THIS IS A REQUEST FOR INFORMATION (RFI) / SOURCES SOUGHT NOTICE BEING RELEASED PURSUANT TO THE REVOLUTIONARY FEDERAL ACQUISITION REGULATION OVERHAUL (RFO) PART 10: MARKET RESEARCH. This RFI is issued solely for informational, market research, and planning purposes. It does not constitute an Invitation for Bid (IFB), Request for Quote (RFQ), or Request for Proposal (RFP), nor does it constitute a promise to issue an IFB, RFQ, or RFP in the future. No solicitation document exists at this time. Issuance of this notice does not constitute any obligation on the part of the Government and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. Respondents are advised that the United States Government will not pay for any information or administrative costs incurred in response to this RFI. Proprietary information is not being requested, and respondents should refrain from submitting proprietary or business-sensitive data. Detailed technical specifications and drawings will only be made available upon issuance of a formal solicitation. 1. PURPOSE The Government is conducting this Sources Sought / RFI in support of market research to identify potential qualified and capable industry partners, including small businesses (Small Businesses, 8(a), HUBZone, Service-Disabled Veteran-Owned Small Businesses [SDVOSB], and Women-Owned Small Businesses [WOSB]). The purpose of this notice is to gain knowledge regarding industry interest, capabilities, technical qualifications, and potential subcontracting arrangements to assist the Government in determining the appropriate acquisition strategy and competition basis. 2. PROJECT SCOPE OF WORK The contemplated requirement is for a firm-fixed-price standalone contract for the complete rehabilitation of the existing powerhouse bridge crane and incidental related work at the Wolf Creek Powerhouse in Jamestown, Kentucky. Crane Description: The existing powerhouse bridge crane is a 250-ton, top-running bridge type crane consisting of two bridge girders and two independent trolleys. Each existing trolley features: • One (1) Main Hoist rated at 125 tons • One (1) Auxiliary Hoist rated at 25 tons Major Work Items: The Contractor will be responsible for furnishing all labor, materials, supervision, engineering, tooling, and equipment required to complete the rehabilitation, which includes, but is not limited to, the following major items: • Safety & Access: Modify personnel access and implement safety improvements to the bridge crane walkways, ladders, and maintenance platforms. • Couplings & Seals: Replace hoist motor output shaft brake wheel coupling seals. • Braking Systems: Replace hoist brake pads and perform comprehensive service to restore proper brake gap and operational torque. • Gearboxes & Lubrication: Clean speed reducers (main hoist, auxiliary hoist, bridge drive, and trolley drive) and replace all lubricating oil; inspect and repair grease lubrication lines; replace main hoist open gear oil. • Wheel & Axle Assemblies: Modify bridge and trolley wheel assemblies to replace original wheel bushings with new anti-friction roller bearings. (Note: The Contractor may have the option to replace entire wheel and axle assemblies or modify and reuse existing wheels and axles). • Below-the-Hook Devices: Provide new, and perform non-destructive inspection, proof-load testing, and painting of below-the-hook lifting devices. • Drives & Automation: Upgrade all variable frequency drives (VFDs) to Magnetek Series 5 VFDs (or approved system equal). • Electrification & Grounding: Furnish and install a new fourth conductor bar dedicated as a continuous ground conductor; modify existing collectors to connect to the fourth conductor bar. • Operator Cab & Controls: Provide and install a new ergonomic operator’s chair, wireless radio remote controllers, absolute hoist encoders, and high-efficiency LED bridge crane lights. • Safety Instrumentation & Limits: Install load cell weighing devices and displays for both main and auxiliary hoists, along with new heavy-duty limit switches for bridge and trolley travel. • Auxiliary Hoists: Furnish and install a new auxiliary tool hoist and a dedicated personnel rescue hoist. • Testing & Commissioning: Perform full operational testing of all mechanical and electrical features of the crane, followed by 100% rated and 125% rated load tests in accordance with CMAA and OSHA requirements. • Documentation: Develop and deliver a comprehensive new Operation and Maintenance (O&M) Manual integrating all legacy data from the existing manual with new equipment data to serve as a complete standalone guide. • Blocks, Sheaves & Lifting Beams: • Provide new main and auxiliary lower load block assemblies. • Provide new main and auxiliary upper sheaves and pins. • Provide new main hoist lifting beam, rotor lifting device, and turbine shaft lifting device. 15.Crane Runway Rails: Survey and modify existing runway crane rails to correct rail span, elevation, and straightness along the entire runway length. 3. CAPABILITY STATEMENT AND CONTRACTOR SURVEY Interested firms capable of performing the work described herein are requested to submit a capability package containing the following information: A. General Information • Company Name: • Physical Address / Mailing Address: • Point(s) of Contact: (Name, Title, Phone Number, and Email Address) • CAGE Code: • Unique Entity Identifier (UEI): • Company Website: B. Business Size and Socioeconomic Classification • Under NAICS Code 333923 (Size Standard: 1,250 employees), is your firm categorized as a: • ☐ Large Business • ☐ Small Business • If certified as a Small Business, identify any applicable socioeconomic designations: • ☐ Small Disadvantaged Business (SDB) / 8(a) • ☐ Historically Underutilized Business Zone (HUBZone) • ☐ Service-Disabled Veteran-Owned Small Business (SDVOSB) • ☐ Veteran-Owned Small Business (VOSB) • ☐ Woman-Owned Small Business (WOSB) • ☐ Economically Disadvantaged Woman-Owned Small Business (EDWOSB) C. Relevant Past Performance / Technical Experience Submit a minimum of two (2) and up to three (3) relevant projects completed within the past ten (10) years demonstrating experience as a Prime Contractor or Subcontractor performing major rehabilitation, modernization, or installation on heavy industrial hoisting machinery (minimum 100-ton capacity). Provide the following details for each reference project: • Project Title: • Contract Number (if applicable): • Client / Agency / Customer Point of Contact (Name, Title, Phone, Email): • Role (Prime or Subcontractor): • Contract Value / Final Dollar Amount: • Period of Performance / Completion Date: • Self-Performed Work: (Identify the scope/type and percentage of work self-performed based on contract value) • Detailed Project Narrative: Include details highlighting specific experience with: • Heavy lifting machinery rehabilitation (brakes, gears, sheaves, and wheel assemblies) • Crane electrification, Magnetek or modern crane-duty VFD retrofits, encoders, and radio controls • Runway rail realignment/surveying and proof-load testing up to 100% and 125% D. Subcontracting and Execution Strategy • In accordance with RFO 52.219-14 (Limitations on Subcontracting), what estimated percentage of the total contract value would your firm perform directly (self-perform)? 2. What specific scopes of work do you anticipate subcontracting out (e.g., rail surveying, machining, electrical, painting, testing)? 3. If your firm is a Small Business, do you anticipate subcontracting primarily to other Small Businesses or utilizing specialty Large Business manufacturers for specialized hardware? E. Bonding Capacity • Single Project Bonding Capacity:________________ • Aggregate Bonding Capacity:________________ F. Project Interest • If a formal solicitation (Request for Proposal) is advertised for this requirement using a Best Value Tradeoff (BVTO) source selection process, does your firm anticipate submitting a proposal? • ☐ Yes • ☐ No 4. SUBMISSION INSTRUCTIONS Responses to this Sources Sought notice must be submitted electronically via email to the Contract Specialist and Contracting Officer identified below. • Submission Deadline: December 4th, 2026 at 11:00 AM Central Time • Subject Line: Response to Sources Sought - Wolf Creek Powerhouse Bridge Crane Rehab (NAICS 333923) • Points of Contact: • Contract Specialist: Diana Namara / [email protected] • Contracting Officer: Bridget Passatore / [email protected] Please limit capability statements to no more than seven (7) pages (excluding standard certifications and cover pages). All responses must be transmitted in PDF format.
Sources Sought Notice Sources Sought Notice Page 6 of 6 Sources Sought Notice *= Required Field Sources Sought Notice Page 1 of 6 Sources Sought Notice Boiler Maintenance Disclaimer: This Request for Information (RFI) is issued solely for market research information and planning purposes and does not constitute a solicitation. All information received in response to this RFI that is marked as proprietary will be handled accordingly. Responses to this notice are NOT offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this RFI. Information Requested from Industry: In response to the Sources Sought, interested Contractors shall submit the following information and any Capabilities/Qualifications Statement to include but not limited to an overview of proposed solution(s) and a description of the product your company possesses in accordance with the attached Statement of Work draft / Salient Characteristics List. Responses to market research table questionnaire shall be submitted. If this information is not provided, then it will be assumed the entire requirement cannot be met. Description of Requirement: The Department of Veterans Affairs, Veterans Health Administration (VHA), Network Contracting Office 19 (NCO 19) is conducting a market survey and is seeking potential sources for Boiler Maintenance at the Rocky Mountain Regional VA Medical Center. This Sources Sought Notice is issued for information and planning purposes only. This is not a solicitation or a request for proposal and shall not be construed as an obligation or commitment by the Government. An award will not be made on any offer submitted in response to this notice, and it shall not be implied that the Government is committed to providing any solicitation or award following this notice. The Government will not pay for any information received in response to this request, nor will the Government compensate a respondent for any costs incurred in developing the information provided. Requirement Services: Item No. Item Description 0001 Annual Boiler Maintenance (Base +4 Option Years) 0002 Unscheduled Maintenance and Parts (Base +4 Option Years) See attached statement of work In response to this announcement, please provide the information requested below requested in this market research table questionnaire. If this information is not provided, then it will be assumed the entire requirement cannot be met: NAICS Code: Company Name: Address: UEI (Unique Entity ID) Number: Contact Name: Phone No.: Email: Business Size Information - Select all that applies: Small Business Emerging Small Business Small Disadvantaged Business Certified under Section 8(a) of the Small Business Act HUBZone Woman Owned Certified Service-Disabled Veteran Owned Small Veteran Owned Small Business Large Business FSS/GSA Contract Holder: Yes No FSS/GSA Contract Number: Effective Date/ Expiration Date: Proposed solution is listed and available on the above FSS/GSA Contract: Yes No Available pricing structure of proposed solution (select all that are applicable below, or remove to fit your requirement): Pricing Model Please Indicate Availability Below: (Yes / No / NA) All on FSS Open Market only Mix of FSS & Open Market Firm-Fixed Price Federal Acquisition Regulation (FAR) Market Rearch Questions: Buy American Act RFO 52.225-1 and RFO 52.225-2 Buy American Certificate What percentage of the proposed product (including leases and rentals) is a: Domestic end product? _____________ (%) Foreign end product? _______________ (%) Country of Origin: Questions for Small Businesses ONLY: Limitations on Subcontracting RFO 52.219-14 What percentage of the work would be subcontracted to another company? ________ What is the business size of the subcontractor?______ Per RFO 52.219-14 the following conditions must be met: Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract; Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract; If subcontracting, what added value do you offer (RFO 52.215-23): Nonmanufacturer Rule (RFO 52.219-33): Does your company manufacturer these proposed items? [Â ] yes [Â ] no Does your company exceed 500 employees? [Â ] yes [Â ] no If yes, list # of employees: _________ Does your company primarily engaged in the retail or wholesale trade and normally sells the type of item being supplied? [Â ] yes [Â ] no Does your company take ownership or possession of the item(s) with its personnel, equipment or facilities in a manner consistent with industry practice? [Â ] yes [Â ] no Does your company supply the end item of a small business manufacturer, processor or producer made in the United States, or obtains a waiver of such requirement pursuant to paragraph (b)(5) CFR 121.406. [Â ] yes [Â ] no If yes, what is the manufacturer s name? ________________ Response Instructions: Do not provide more than 8 pages, including cover letter page. Submit your response via email to [email protected] Submit your response NLT 4:00pm (ET) on Friday, December 4, 2026; Mark your response as Proprietary Information if the information is considered business sensitive. VA has identified the appropriate North American Industry Classification System (NAICS) Code as 238220 Plumbing, Heating, and Air-Conditioning Contractors with a Small Business size of $19.0 Million or less. Please identify and explain any NAICS codes your company believes would better represent the predominant work included in the attached Statement of Work draft / Salient Characteristics List. (End of Sources Sought)
Project Title: CAMP NELSON NATIONAL CEMETERY, KY Project Location: Camp Nelson National Cemetery, 6980 Danville Road, Nicholasville, Kentucky 40356. NAICS code 237990 is applicable for this procurement with the small business size standard of $45,000,000. The magnitud of construction for this project is estimated between $10,000,000.00 and $20,000,000.00. NOTICE OF SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE IN ACCORDANCE WITH PUBLIC LAW 109-461 Contractor is to provide all construction services necessary to complete this project in accordance with the attached statement of work, construction drawings, construction specifications, and all other applicable supporting documents. There will be an organized site visit conducted on September 25, 2026, at 10:00 EST. Attendees will meet at the Camp Nelson National Cemetery Administration Building located at 6980 Danville Road, Nicholasville, KY 40356 11/10/2026 - Amendment 0004 published extending hour and date offerors are due. See attached amendment for details and all associated attachement to the Amendment.
Federal Procurement Landscape in Kentucky
Major federal military bases, research labs, and federal centers driving contract awards in Kentucky include:
Local Contracting Assistance & APEX Counseling
The Kentucky APEX Accelerator assists small businesses in Kentucky with free one-on-one technical assistance, SAM.gov registration, and certification reviews. Visit our comprehensive Kentucky APEX Accelerator Directory & Intake Guide → or their direct portal at https://kentuckyapex.org.
Proven Pursuit Blueprint
Frequently Asked Questions About Federal Contracting in Kentucky
How much federal contracting money is spent in Kentucky?
Federal agencies award approximately $9.4 Billion annually to prime contractors and subcontractors performing work across Kentucky.
What military bases or federal facilities operate in Kentucky?
Major federal installations in Kentucky include: Fort Campbell (101st Airborne / 160th SOAR), Fort Knox (Army Human Resources Command), Blue Grass Army Depot.
How can local businesses in Kentucky get free procurement counseling?
The Kentucky APEX Accelerator provides free, federally funded counseling to help businesses in Kentucky navigate SAM.gov registration, certifications, and proposal preparation.