Solicitation 1240LT26P0049 for Big Piney Office Interior Sewer Line Replacement published by DEPT OF DEFENSE. Contractors must submit responses conforming to the requirements in the official SAM.gov solicitation notice and associated attachments.
Active Federal Solicitations in Wyoming
14 Open NoticesUpdate 10/5/2026: QA_10-05-2026.pdf posted to attachments. PROJECT: WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3 LOCATION: 0.4 miles SW of Mammoth, WY WORK: The work consists of 4R roadway reconstruction, excavation, blasting, rock scaling, embankment, draining improvements, parking area improvements, roadside improvements, retaining wall construction, stone masonry, utility relocation, waterline construction, boardwalk construction, obliteration, base aggregate, asphalt paving, concrete curb and gutter, striping, and signage. See “Project Description” posted under Attachments for additional details. LENGTH: 0.7 miles and parking lot TENTATIVE COMPLETION DATE: Fall 2028 CONTRACT TYPE: Firm-Fixed-Price Task Order Contract ESTIMATED PRICE RANGE: Between $ 45,000,000 and $55,000,000 . INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. NOTICE OF SUBCONTRACTING OPPORTUNITY This project will be solicited to the Yellowstone/Grand Teton MATOC contractors. Information on the MATOC contractors may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/yellowstone-grand-teton (linked under Attachments/Links) This project is anticipated to be solicited Winter 2026/2027 PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link.
This Firm Fixed Unit Price per student Task Order for six (6) integrated, five-day Wilderness Upgrade for Medical Professionals (WUMP) training classes was awarded to NATIONAL OUTDOOR LEADERSHIP SCHOOL on a sole source basis in accordance with Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) Part 8.4, Part 6.103-1 Only one responsible source and no other supplies or services will satisfy agency requirements, and General Services Administration Regulation (GSAR) Part 538.7104-3(a) and (3)(i). Justification is attached.
Update 10/20/2026: QA_10-20-2026.pdf posted to attachments. Update 10/5/2026: QA_10-05-2026.pdf posted to attachments. PROJECT: WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3 LOCATION: 0.4 miles SW of Mammoth, WY WORK: The work consists of 4R roadway reconstruction, excavation, blasting, rock scaling, embankment, draining improvements, parking area improvements, roadside improvements, retaining wall construction, stone masonry, utility relocation, waterline construction, boardwalk construction, obliteration, base aggregate, asphalt paving, concrete curb and gutter, striping, and signage. See “Project Description” posted under Attachments for additional details. LENGTH: 0.7 miles and parking lot TENTATIVE COMPLETION DATE: Fall 2028 CONTRACT TYPE: Firm-Fixed-Price Task Order Contract ESTIMATED PRICE RANGE: Between $ 45,000,000 and $55,000,000 . INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. NOTICE OF SUBCONTRACTING OPPORTUNITY This project will be solicited to the Yellowstone/Grand Teton MATOC contractors. Information on the MATOC contractors may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/yellowstone-grand-teton (linked under Attachments/Links) This project is anticipated to be solicited Winter 2026/2027 PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link.
Solicitation W9128F27PA002 for F.E. Warren Resident Office Janitorial Service published by DEPT OF DEFENSE. Contractors must submit responses conforming to the requirements in the official SAM.gov solicitation notice and associated attachments.
PROJECT DESCRIPTION: The Office of Missile Air Defense Program (OMAD) is a Defense Access Road (DAR) program used by the Department of Defense (DoD) to fund the annual maintenance and improvements on certified gravel roads. FHWA works with the Military Surface Deployment and Distribution Command (SDDC) to support the Air Force Intercontinental Ballistic Missile Program (Minuteman). These Minuteman Missile Access Roads are located in southwestern Wyoming, southeastern Nebraska, and northeastern Colorado. SCOPE OF THE WORK: The work includes roadway reconditioning and adding four inches of aggregate surface course as well as the replacement of culverts. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations.
PROJECT DESCRIPTION: The Office of Missile Air Defense Program (OMAD) is a Defense Access Road (DAR) program used by the Department of Defense (DoD) to fund the annual maintenance and improvements on certified gravel roads. FHWA works with the Military Surface Deployment and Distribution Command (SDDC) to support the Air Force Intercontinental Ballistic Missile Program (Minuteman). These Minuteman Missile Access Roads are located in southwestern Wyoming, southeastern Nebraska, and northeastern Colorado. SCOPE OF THE WORK: The work includes roadway reconditioning and adding four inches of aggregate surface course as well as the replacement of culverts. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations.
Colonial National Historic Park (COLO) Remove Invasive Species & Herbicidal Treatment to Maintain Interpreted Viewsheds and Protect Cultural Resources Yorktown. The National Park Service, Northeast Region, New England Major Acquisition Buying Office, issues this Request for Quote (RFQ) for the clearing and treating 2.54 acres of live and dead mature invasive species at the Colonial Parkway & Route 238 site, adjacent to the American Revolution Museum. Item Two (2) Herbicidal treatment only of 8.76 acres previously infested with live and dead mature invasive species in four (4) locations within Colonial National Historical Park, within the Village of Yorktown in Yorktown, Virginia. All interested parties shall meet at Yorktown Visitor Center Parking Lot. Address is 1000 Colonial Parkway, Yorktown VA 23690. Contractors to meet in front of the Visitors Center. The site visit POC is Philip Fortuna.
Colonial National Historic Park (COLO) Remove Invasive Species & Herbicidal Treatment to Maintain Interpreted Viewsheds and Protect Cultural Resources Yorktown. The National Park Service, Northeast Region, New England Major Acquisition Buying Office, issues this Request for Quote (RFQ) for the clearing and treating 2.54 acres of live and dead mature invasive species at the Colonial Parkway & Route 238 site, adjacent to the American Revolution Museum. Item Two (2) Herbicidal treatment only of 8.76 acres previously infested with live and dead mature invasive species in four (4) locations within Colonial National Historical Park, within the Village of Yorktown in Yorktown, Virginia. All interested parties shall meet at Yorktown Visitor Center Parking Lot. Address is 1000 Colonial Parkway, Yorktown VA 23690. Contractors to meet in front of the Visitors Center. The site visit POC is Philip Fortuna.
Colonial National Historic Park (COLO) Remove Invasive Species & Herbicidal Treatment to Maintain Interpreted Viewsheds and Protect Cultural Resources Yorktown. The National Park Service, Northeast Region, New England Major Acquisition Buying Office, issues this Request for Quote (RFQ) for the clearing and treating 2.54 acres of live and dead mature invasive species at the Colonial Parkway & Route 238 site, adjacent to the American Revolution Museum. Item Two (2) Herbicidal treatment only of 8.76 acres previously infested with live and dead mature invasive species in four (4) locations within Colonial National Historical Park, within the Village of Yorktown in Yorktown, Virginia. All interested parties shall meet at Yorktown Visitor Center Parking Lot. Address is 1000 Colonial Parkway, Yorktown VA 23690. Contractors to meet in front of the Visitors Center. The site visit POC is Philip Fortuna.
Colonial National Historic Park (COLO) Remove Invasive Species & Herbicidal Treatment to Maintain Interpreted Viewsheds and Protect Cultural Resources Yorktown. The National Park Service, Northeast Region, New England Major Acquisition Buying Office, issues this Request for Quote (RFQ) for the clearing and treating 2.54 acres of live and dead mature invasive species at the Colonial Parkway & Route 238 site, adjacent to the American Revolution Museum. Item Two (2) Herbicidal treatment only of 8.76 acres previously infested with live and dead mature invasive species in four (4) locations within Colonial National Historical Park, within the Village of Yorktown in Yorktown, Virginia. All interested parties shall meet at Yorktown Visitor Center Parking Lot. Address is 1000 Colonial Parkway, Yorktown VA 23690. Contractors to meet in front of the Visitors Center. The site visit POC is Philip Fortuna.
The U.S. Army Corps of Engineers (USACE), Portland District is hosting a two-hour virtual industry event at 0900 hours on 16 December 2026 to provide a project update and to gather industry input as it evaluates project construction risks, industry capabilities, and strategies for the project below. For those interested in seeing the project site in person, a site visit will be arranged for 15 December 2026. That site visit will start at 0900, and the site is located at 11285 Sprit Lake Hwy Toutle WA 98649. Firms who respond to this announcement with completed RSVP and Survey form will be provided further details for the site visit, if interested, and a link to the virtual meeting. The Government will provide the presentation slides following the event. It is also requested that each firm provide responses to a questionnaire to be launched at the conclusion of the event. Responses will be considered for use in the solicitation development.UPDATE (16 Nov 2026): Electrical sheets attached - TRF1.102_ELECTRICAL SHEETS_BCOES. UPDATE (25 Nov 2026): Civil, Mechanical and Structural sheets attached.
The purpose of this amendment 0001 is as follows: • To extend due for proposals from November 27, 2026, to December 15, 2026, before 10:00 AM MT. All offers please email them to Elia L Ruiz Manzo at [email protected]. • To post site visit attendance sheet and agenda. • All other items and conditions remain the same. A.1 List of Attachments See attached document: S04-Pre Construction Site Visit attendance. See attached document: S04 - Site Visit Meeting Doc. --------------------------------------------------------- GENERAL: Introduction: An inspection for current code compliance of the lightning Protection System on Building 71N has been conducted and found the system needs upgrades and repairs to meet current NFPA 780 and UL96A standards. The Sheridan VA Medical Center needs the services of a qualified contractor to perform the needed lightning protection upgrades to the main hospital building 71N. Located on the Sheridan Wyoming Veterans Affairs Medical Center (VAMC) campus, at 1898 Fort Road, Sheridan, Wyoming 82801. Statement of Work: Specifics a. Existing Conditions The existing lightning protection system (LPS) for Building 71N was installed in 1989 during the building s original construction. Overall, the system remains in fair condition, though it requires repair because several air terminals have become detached from their adhesive bonds to the roof surface. Air terminals are present at all high points of the structure, and all roof-mounted equipment and appurtenances are properly grounded. A main grounding bus connects the communication systems and possibly the electrical distribution system to the primary service ground. The specific location where the grounding system bonds together the structural steel, electrical system, lightning protection components, and plumbing to create an equipotential ground could not be identified during the assessment. A continuous grounding loop encircles Buildings 9, 71, and 71N, with all roof air terminals and down conductors tied into this loop. Down conductors descend to the loop at the corners of each of these buildings. Each air terminal has at least two separate grounding paths, satisfying current code requirements. No Transient Voltage Surge Suppression (TVSS) devices were observed in the system. The lower 8 feet of the ground down conductors are encased in PVC electrical conduit for protection. New Construction Recent construction has added large equipment and a screen wall to the roof, which now obstructs and interferes with the original positioning of the existing air terminals. This new equipment sits higher than the existing lightning protection system components, rendering the current air terminals ineffective at intercepting and safely directing lightning strikes to ground. Project Requirements To bring the existing lightning protection system (LPS) into compliance the following corrections are needed: Install Transient Voltage Surge Suppression (TVSS) devices at the building s main service panel. Establish proper bonding by interconnecting all electrical systems, communication systems, piping, and structural steel at the service entrance to create an equipotential ground. Repair all roof air terminals that have detached or pulled away from their adhesive mounts on the roof surface. Install new air terminals at both ends of each screen wall, with additional terminals spaced at 20-foot intervals along the top of each wall, and at the highest point of the HVAC ductwork. Install an air terminal at each corner of the new HVAC equipment. Connect all newly installed air terminals to the existing LPS using #2 bare copper conductors. After these corrections have been completed, a qualified inspection is required to verify full compliance with NFPA 780 and UL 96A standards. Upon successful inspection, a Master Label Certificate should be issued for the lightning protection system. General: Construction project is to be completed within 120 calendar days from date of Notice to Proceed (NTP). Contractor shall provide all equipment, materials, supplies, tools, software, supervision, and labor required for this project, which may include, but is not limited to, demolition work, providing negative pressure environment for work, and providing all new equipment, utilities, and room finishes as indicated in the plans and this SOW per VA construction standards. Safety submittals shall be completed and approved prior to the commencement of on-site construction work. Material selection submittals shall be completed and approved prior to ordering of materials for the project. The building tenants not in the construction areas will remain at work in the buildings during this construction. Patients will remain on the floor in areas not under construction, so the contractor shall make patient safety, and infection control measures a priority. The contractor shall coordinate work locations and schedules with VA COR to minimize impact to building tenants. All electrical, carpentry, architectural, mechanical work, product design, project management, and other work needed on this project shall be provided by the Contractor. All required electrical work, low, medium, or high voltage, shall be installed and terminated by the Contractor. No wiring or cabling shall be abandoned in place. All piping, cabling, and wiring shall be labeled. All cabling and patch cabling shall match the VAMC s station-standard colors. The installation must, at a minimum, be in accordance with all applicable codes indicated in the Department of Veterans Affairs Design Manuals and VA .PUBLICATIONS (Master Construction Specifications, Construction Standards, National Fire Protection Association (NFPA), Underwriters Laboratory (UL), International Building Code IBC 2003, and National Electric Code (NEC) building codes and standards and the VA Information Security Handbook 6500.6, 6550.0 etc.). The Contractor shall read and be familiar with the most current editions of the applicable codes, standards, guides, and manuals. Sources can be accessed at the Office of Construction and Facilities Management s Technical Information Library (TIL) (http://www.cfm.va.gov/TIL). Any penetrations through any floors, ceilings, or walls shall be fire caulked, or otherwise fire sealed, and shall be done in this contract to meet VA standards and NFPA standards. Contractor shall utilize the VAMC s station-standard fire stop products or approved equal product(s). The station-standard products are SpecSeal fire caulk product is SpecSeal SSS Intumescent Firestop Sealant; and, if needed, the SpecSeal Composite Sheet may be used in areas approved by the COR. The Contractor shall inquire of the COR if any existing equipment, fixtures, hardware, doors, frames, or any other property removed is desired to be retained by the VA for reuse elsewhere within the medical center, at the time of removal. If the VA desires to retain an item, the Contractor shall deliver it to a location designated by the COR. If the VA does not desire to retain an item, the Contractor shall dispose of it properly off-station. The new components installed shall be tested and commissioned, re-certified, and/or tested before VA acceptance. All testing parameters shall be provided by the Contractor with source references to the COR and 3rd-party reviewer before testing begins. Copies of all test reports must be provided to the COR. HVAC systems that have changes made to them as part of this project, beyond diffuser replacement, shall be tested and balanced by the Contractor. Any IT data cables installed or modified as part of this effort shall be tested after installation. Test methods and plans shall be coordinated with the COR. Any Med Gas systems modified as part of this effort shall be re-certified back to the closest shut-off in the system. The Contractor shall arrange for any required re-certification as part of this contract and shall provide plans and results to the COR for approval. Fire alarm devices that are tied into the building fire alarm system, that are replaced or relocated as a result of this work, shall be tested before that phase of the project is complete. The Contractor shall arrange for all required fire alarm testing. If a building s fire alarm system is under warranty, testing must be accomplished by the contractor who holds the warranty. Any fire sprinklers that are relocated as part of this project shall be reviewed and approved by VA Safety prior to installation. All fire sprinkler work shall be coordinated with VA Safety so as to avoid accidentally setting off the system. At the conclusion of the project, the Contractor shall provide the VA and AE with a red-lined set of construction drawings, showing any as-built variations from the plans, as called for in the specifications. The Contractor must repair any damage caused by the Contractor or their subcontractors during this project. Repairs shall be done timely and will be coordinated with the COR. Repairs shall be of equal or better quality and finish than the existing that was damaged. Contractor s work hours shall be between 7:30am-4:00pm Monday-Friday, unless otherwise coordinated with, and approved in advance by, the COR. Noisy work shall not begin prior to 7:30am. Contractors shall not work on weekends, or federal holidays as specified by U.S. Office of Personnel Management (OPM), unless approved in advance by the COR or CO. For approved weekend or holiday work, Contractor must adjust their workers pay accordingly at no additional cost to the VA. The Contractor shall repair any disturbed earth around and in the construction areas. This shall include: Removing any rocks or clumps that have been brought to the surface. Filling in any ruts or depressions with approved fill material, such that the areas are level or at the required slope. Returning the surface cover to what is was before the project, or as called out in the project drawings. In the case of grass, the contractor shall provide topsoil as necessary to provide a good medium for grass growth. If the area(s) cannot be covered by the VA sprinkler system, then the Contractor shall provide for the watering of the new grass until it is established. Any area that the grass does not take to shall be reseeded under the warranty period. The Contractor shall replace any trees, shrubs, or other plants damaged or destroyed during construction, per the project landscape drawings, at no additional cost to VA. Safety and Security: The Contractor shall follow all safety specifications and shall always have an OSHA-30 certified person on-site, at each work location, overseeing the construction. All other Contractors and subcontractors working on-site shall have at least OSHA-10 certifications. Some work will be in medical areas of the hospital, on floors with patients present, so the contractor shall plan for infection control measures to include dust containment, negative pressure, and cleanup to hospital standards. The Contractor will, with the participation of the COR, complete an Infection Control Risk Assessment (ICRA), using the VA forms and process, and Contractor shall implement all protection measures called for in the risk assessment. For work on an active mental health unit, the Contractor shall follow strict tool control and access control in construction areas. Any patients found in construction areas shall be immediately reported to ward staff and the COR. The Contractor shall read and follow the current version of the FMS Safety Plan, which outlines expectations for tool control and safety on-station, [as well as stricter requirements for work on the Acute Psychiatric Ward (APU) located on the 2nd floor of Building 8 (e.g., Rule of Two minimum with one person overseeing the work at all times). Work on APU is not in-scope for this project.] General Contractor shall distribute the FMS Safety plan to their workers and subcontractors. General Contractor shall note this training in their daily logs. General station safety requirements: It is vitally important to keep tools and other items that offer a patient the opportunity for self-harm under control at all times. Tools, extension cords, and similar items should not be left out unattended where patients can gain access to them. This includes in the open backs of contractor vehicles, trailers, laydown areas, tool carts, etc.. Tools should be locked in a job box, some other type of toolbox, or within a room that can be secured from unauthorized access as approved by the COR. This means no tools are left in halls, rooms, etc. in which contractors lose sight of the tools. Lock tools up in a locking cart as needed. Checking of area as the day s work progresses for tools left unattended- examples are, but not exclusively, screwdriver rolling under furniture, razor blade changes left in the grass outside, reels of cords that could hang someone, left unattended around the corner from current work. Large storage containers must be locked if not occupied by a staff member and overnight. Tools and supplies left out in laydown area must be monitored, as patients can walk the entire site. Also, site cleanliness is an OSHA requirement. Badging requirements: All Contractors and subcontractors must obtain a temporary contractor badge from the Engineering Office (Building 5, Room 208) when they first arrive on-site. A valid (i.e., not expired), Government-issued photo ID (such as a Driver s License) is required to be issued a badge. Contractors who have a valid PIV Badge or CAC Badge will not need to be issued a temporary badge. For Contractors on-site less than 179 calendar days per year, the above will suffice, and Contractor PIV badges are not needed. An exception to this: a contractor PIV badge is needed (regardless of work length) within IT closets and other designated secure areas. (For IT closets specifically, it is permissible for just one Contractor with a PIV badge to supervise the work of their contractors at all times within the IT closets.) For Contractors on-site 180 calendar days or more per year, they are required to obtain Contractor PIV badges, which requires fingerprints and a background check process. Contractor PIV badges are valid for 6 months maximum. It is the Contractors responsibility to ensure their badges stay valid and are renewed timely. Contractor shall check with COR at pre-construction meeting for the most-current badging requirements and for beginning the Contractor PIV badge process, as required. Contractor s work shall include all items listed herein this SOW and in the drawings, specifications, and details provided, unless items are specifically called out as VA-provided materials or labor. **Contractor shall field verify all quantities, sizes, and dimensions and receive approved submittals before ordering products and supplies for this project. END OF STATEMENT OF WORK
General Services Administration (GSA) seeks to lease the following space: State: Wyoming City: Buffalo Delineated Area: City Limits of Buffalo, WY Minimum Sq. Ft. (ABOA): 16,018 Office, 6,242 Warehouse/Light Industrial and at least 19,380 wareyard Maximum Sq. Ft. (ABOA): 16,861 Office, 6,570 Warehouse/Light Industrial and at least 19,380 wareyard Space Type: Office, Warehouse/Light Industrial and Wareyard Parking Spaces (Total): 86 Parking Spaces (Surface): 86 Parking Spaces (Structured): 0 Parking Spaces (Reserved): 0 Full Term: 20 years Firm Term: 20 years Option Term: N/A Additional Requirements: See RLP for Additional Requirements. Offered space must meet Government requirements for fire safety, accessibility, seismic, and sustainability standards per the terms of the Lease. A fully serviced lease is not required. Offered space shall not be in the 1-percent-annual chance/0.2-percent-annual chance floodplain (formerly referred to as “100- year”/“500-Year” floodplain). Entities are advised to familiarize themselves with the telecommunications prohibitions outlined under Section 889 of the FY19 National Defense Authorization Act (NDAA), as implemented by the Federal Acquisition Regulation (FAR). For more information, visit: https://acquisition.gov/FAR-Case-2019-009/889_Part_B. Offers Due: January 8, 2027 Occupancy (Estimated): Fall 2028 Offer Submission: Offers must be submitted electronically through the Leasing Portal, located at https://leasing.gsa.gov. Interested parties must go to the Leasing Portal, enter the Offer space section, select the “Register” link and follow the instructions to register. Instructional guides and video tutorials are offered on the Resources link on the Leasing Portal home page. Solicitation (RLP) Number: 5WY0078 Government Contact Information (Not for Offer Submission) Darrin Hotaling - Lease Contracting Officer Timothy Pavek, Broker Contractor - Carpenter/Robbins Commercial Real Estate Inc. Note: Entities not currently registered in the System for Award Management (SAM.gov) are advised to start the registration process as soon as possible.
Federal Procurement Landscape in Wyoming
Major federal military bases, research labs, and federal centers driving contract awards in Wyoming include:
Local Contracting Assistance & APEX Counseling
The Wyoming APEX Accelerator assists small businesses in Wyoming with free one-on-one technical assistance, SAM.gov registration, and certification reviews. Visit our comprehensive Wyoming APEX Accelerator Directory & Intake Guide → or their direct portal at https://wyomingapex.org.
Proven Pursuit Blueprint
Frequently Asked Questions About Federal Contracting in Wyoming
How much federal contracting money is spent in Wyoming?
Federal agencies award approximately $890 Million annually to prime contractors and subcontractors performing work across Wyoming.
What military bases or federal facilities operate in Wyoming?
Major federal installations in Wyoming include: F.E. Warren Air Force Base (90th Missile Wing - ICBM Command).
How can local businesses in Wyoming get free procurement counseling?
The Wyoming APEX Accelerator provides free, federally funded counseling to help businesses in Wyoming navigate SAM.gov registration, certifications, and proposal preparation.