Guided demo: opportunity examples are illustrative and changes are not saved. Sign in to create your workspace

LIVE SAM.GOV ยท Special Notice ยท REF #W9128F26RA0690

Draft Solicitation for $99M SB FSRM Roofing MATOC

DEPT OF DEFENSE
Washington, DC ยท NAICS not listed ยท Due not listed

โ† Back to opportunity radar
30/100 ยท LIVE FIT SIGNAL

Why this opportunity surfaced

Complete your Company Profile to calculate a personalized fit score.

NonePosted 2026-09-25Synced from SAM.gov

Use this score for triage only. It does not establish eligibility, responsiveness, or a likelihood of award.

Contracting Officer & Buyer Contact Information

Official government points of contact registered for this procurement. Use for pre-proposal questions, capability statements, and formal inquiries.

Primary Contracting Officer
Euemduan OSMERA
Contracting Officer

Contract Classification & Agency Hierarchy

DEPARTMENTDEPT OF DEFENSE
NAICS CODENot specified
PLACE OF PERFORMANCE๐Ÿ“ Washington, DC
SET-ASIDE PROGRAMNone
RESPONSE DEADLINEOpen
POSTED DATE2026-09-25

Official Solicitation Description & Scope of Work

Authoritative SAM.gov Text

Complete synopsis, technical objectives, and scope statement published by DEPT OF DEFENSE.

THIS IS A DRAFT SOLICITATION. WE ARE NOT ACCEPTING PROPOSALS AT THIS TIME.USACE Omaha District anticipates issuing a small business set-aside, firm-fixed-price, multiple-award task order contract (MATOC) for Facilities Sustainment, Restoration, and Modernization (FSRM) roofing services. No response to this posting is required.The anticipated procurement is a design-build/design-bid-build (DB/DBB) IDIQ MATOC with a shared maximum capacity of $99 million. The Government intends to award contracts to approximately five contractors. The anticipated ordering period is five years, consisting of a three-year base period and a two-year option period. NAICS: 238610, Roofing Contractors Geographic scope: Primarily Colorado and Wyoming in support of USACE Omaha District Project type: Predominantly renovation work at occupied facilities Task orders may include repair, replacement, design, and construction of roofing systems, including single-ply membrane systems; standing-seam metal; tile; sprayed polyurethane foam; protected membrane; and heat-reflective or energy-efficient roofing systems. Associated work may include insulation, vapor and air barriers, gutters, downspouts, flashings, fascias, soffits, and related components.Individual task orders may also include incidental repairs resulting from roof leaks, such as ceiling repairs, painting, and carpet cleaning. Incidental lead-based paint or asbestos abatement may be required. Roofing systems must account for applicable Colorado and Wyoming environmental conditions, including snow loads, wind forces, and lightning. LEED certification is not anticipated, although task-order-specific sustainability requirements may apply.Offerors must maintain active registration in the System for Award Management (SAM) and keep electronic Representations and Certifications current. Solicitation documents and all amendments will be posted exclusively through SAM.gov. Contractors are responsible for monitoring SAM.gov for the solicitation, amendments, and other updates. All responsible small business sources may submit a proposal when the solicitation is issued.Contracting Points of Contact: Euemduan Osmera and Tyler Hegge [email protected]. Please see description below for information. 2. Please see attachments for complete solicitation.

AI Triage & Compliance Scan (FAR / Risk Extraction)

Found 5 mandatory statements, 0 evaluation signals, 1 pricing references, and 0 risk indicators. Human review is still required.

Mandatory requirements detected

  • No response to this posting is required.The anticipated procurement is a design-build/design-bid-build (DB/DBB) IDIQ MATOC with a shared maximum capacity of $99 million.
  • Incidental lead-based paint or asbestos abatement may be required.
  • Roofing systems must account for applicable Colorado and Wyoming environmental conditions, including snow loads, wind forces, and lightning.
  • LEED certification is not anticipated, although task-order-specific sustainability requirements may apply.Offerors must maintain active registration in the System for Award Management (SAM) and keep electronic Representations and Certifications current.
  • Contractors are responsible for monitoring SAM.gov for the solicitation, amendments, and other updates.

Evaluation signals

  • Specific evaluation factors were not listed in the notice overview. Consult the full RFP evaluation criteria.

Risk and deadline review

Detected risk flags

  • No explicit risk language was detected in the imported description.

Dates to verify

  • Verify the response deadline, question deadline, site visits, and amendment acknowledgements in the official notice.